Scope

Treasury and Risk Management tests ALM, liquidity, market risk, capital adequacy, and treasury controls. The exam expects calculation logic and control segregation.

Core rules

  • Treasury deals in money market, FX, and securities; front office deals, middle office measures risk, back office confirms and settles. Segregation prevents fraud.
  • ALM manages liquidity and interest-rate gaps. Rate-sensitive assets and liabilities are bucketed; a positive gap gains when rates rise, a negative gap loses.
  • Market risk includes FX, interest rate, and equity risk; VaR estimates loss at a confidence level and horizon but is not a maximum loss.
  • Basel III in Pakistan: SBP prescribes CAR (currently 11.5% including capital conservation buffer), CET1, LCR, NSFR, and leverage ratio. HQLA must be genuinely liquid.
  • Stress testing and contingency funding plans are required.

Worked example

Tier 1 capital is PKR 80 million, Tier 2 is PKR 20 million, and RWA is PKR 900 million. CAR = (80+20)/900 = 11.1%. SBP's 11.5% minimum requires 900 x 11.5% = PKR 103.5 million, so the bank is short PKR 3.5 million. Reasoning: capital adequacy is measured against risk-weighted assets, not total assets.

Traps

  • Letting front office confirm its own deals.
  • Treating all deposits as stable for LCR.
  • Counting illiquid securities as HQLA.
  • Treating VaR as the worst possible loss.