Karstic Limestone Dam Foundation: Grout Curtain Adequacy and Cavity Treatment
A 45 m high RCC dam is planned across a perennial river on thick-bedded Eocene limestone. Twelve boreholes to 70 m depth show the upper 20 m of the right abutment to be intensely karstified: water-pressure tests return 35–60 Lugeon in that interval, falling to 2–4 Lugeon below 45 m. Borehole BH-7 intersected a 4 m high cavity at 28 m depth, clay-silt filled with scattered limestone blocks. The water table is 6 m below ground surface and a spring 400 m downstream of the abutment discharges a steady 30 L/s; villagers use it for drinking water. The reservoir will impose a 40 m head at the abutment. The designer has proposed a single-row grout curtain to 60 m depth (1.5 times the head), with closure holes at 10 m spacing and a grouting acceptance criterion of 5 Lugeon. Construction is due to start in the dry season, and the regulator has asked for a seepage and karst-stability assessment before approval.
1. Evaluate the proposed curtain depth, single-row layout and 5 Lugeon acceptance criterion. What changes would you require before approval?
Read the worked answer
Convert the test results first. One Lugeon is roughly 1 L/min per metre at 1 MPa, equivalent to about 1.3×10⁻⁷ m/s; 35–60 LU is therefore of the order of 5–8×10⁻⁶ m/s in the upper 20 m, while the 2–4 LU zone below 45 m is about 3–5×10⁻⁷ m/s.
A rough seepage check shows why 5 LU is too lax. With 40 m head across 20 m thickness and a 100 m wide abutment, k = 5×10⁻⁶ m/s gives q ≈ k·i·A ≈ 5×10⁻⁶ × 2 × 2,000 ≈ 0.02 m³/s, or 20 L/s - comparable to the entire spring. Karst conduits can bypass the grout entirely, so the spring is at real risk.
Depth: 60 m is defensible because it penetrates well below the 45 m low-permeability zone, but depth alone does not fix a single-row curtain in karst. Single rows are readily bypassed around solution features. I would require:
- a minimum three-row curtain in the upper 30 m, collapsing to two rows below;
- staged primary–secondary–tertiary holes with real-time pressure and take monitoring, using GIN or similar controlled grouting;
- acceptance tightened to 1–3 LU, verified by check holes between grout holes;
- grout mixes graded from cement-bentonite to microcement, with a contingency for polyurethane or hot bitumen if fine conduits do not respond;
- an independent review of the left abutment and a dye-tracing test before impoundment.
2. BH-7 intersected a 4 m clay-silt-filled cavity at 28 m depth. Describe how you would treat and verify it before impoundment.
Read the worked answer
The cavity is the highest-risk feature because clay-silt filling will not accept normal cement grout and may be erodible under the future 40 m head. Treatment must start with characterisation, not blind grouting: run a borehole camera and cross-hole seismic tomography between BH-7 and neighbouring holes to establish cavity extent and whether it connects to the surface or to other solution features.
If the cavity is limited and accessible, I would flush it with water and air-lift, then fill it with a low-heat, high-slump concrete or cement-stabilised sand placed by tremie through a large-diameter borehole. For a clay-filled void that cannot be cleaned, permeation with a low-viscosity grout or jet grouting from an adjacent hole may be needed. Grouting pressures must be kept below the vertical effective stress at 28 m to avoid hydrofracturing; at a unit weight of about 20 kN/m³, that is roughly 0.5 MPa, so stage pressures should stay well below this.
Verification should include: post-treatment water-pressure tests in check holes reaching 1–3 LU; core recovery through the treated zone; a second camera inspection; and a dye-tracing or salinity test from the reservoir area to the downstream spring during first filling. If connection to the spring is demonstrated, impoundment should be conditional on a successful supplementary grouting campaign.
3. Set out the first-filling instrumentation and performance monitoring plan, including action levels.
Read the worked answer
The plan must measure both pressure and flow, because karst failure often appears as turbidity or a sudden gain in spring discharge before piezometers respond.
Instrumentation:
- vibrating-wire piezometers in the curtain, in the karst zone and downstream of the abutment, at 10–15 m vertical spacing;
- V-notch weirs and continuous conductivity/turbidity loggers at the spring and at two downstream stations;
- surveying targets on the abutment and gallery walls for vertical and horizontal movement;
- pressure cells and joint meters in the grouting gallery;
- periodic dye-tracing during filling.
Action levels should be defined before filling, not after. Typical thresholds for a dam of this height: seepage increase of 5 L/s above baseline triggers daily inspection; 10 L/s or any turbidity above 10 NTU triggers a hold in filling and investigation; piezometric levels above the design phreatic line, or movement exceeding 10 mm, triggers drawdown. Filling should proceed in stages of 5 m head, with a 7–10 day observation period at each stage. Any turbid discharge is treated as a potential internal-erosion signal regardless of flow rate, and the spring must be sampled for limestone fines and dye.