A landlord has a BREEAM New Construction 2018 'Excellent' certificate for a 9,000 m² office base build. A single tenant now takes the whole building and commissions a category-B fit-out under BREEAM Refurbishment and Fit Out (RFO). The tenant's fit-out introduces a new 60-person meeting suite, additional WC provision, a revised lighting scheme, and a large glazed partition that reduces daylight to the core. The tenant wants to reference the base-build certificate to claim credits already achieved (e.g. transport, water, some pollution credits) and to avoid re-assessing them. The fit-out contractor asks whether the RFO assessment can simply 'inherit' the base-build score and add fit-out credits on top.

1. How should the assessor treat credits already achieved at base build when scoping the RFO assessment?

Read the worked answer

RFO is a distinct assessment with its own scope, and it does not simply inherit the base-build score. However, BREEAM recognises that some issues are delivered by the base build and are outside the fit-out's control.

  • Identify which issues are within the fit-out scope and which are base-build dependent. For base-build-delivered credits (e.g. transport links, some water and pollution items), the assessor may reference the base-build evidence where the RFO scheme permits, but must verify the evidence is still valid and applicable.
  • Credits that the fit-out changes (daylight, lighting, internal water use, waste) must be re-assessed on the fit-out's own merits.
  • The RFO certificate is scored on the RFO assessment, not by adding to the base-build percentage.

The assessor should map each RFO issue to 'fit-out controlled', 'base-build referenced', or 'not applicable', and document the rationale.

2. The glazed partition reduces daylight to the core. What is the assessor's obligation?

Read the worked answer

The assessor must assess the as-designed fit-out, not the base-build condition. If the partition reduces daylight such that the relevant health-and-wellbeing daylight credit is no longer met, the credit must be marked as not achieved (or reduced), regardless of the base-build certificate.

  • Request daylight modelling for the affected zones reflecting the new partition.
  • Where the credit can no longer be demonstrated, record it as not achieved with a clear justification.
  • Do not offset a lost fit-out credit against base-build achievements; each issue stands on its own evidence.

This is the core judgement: the base-build certificate does not immunise the fit-out from re-assessment where the fit-out changes the outcome.