ABAA CABS study materials
ABAA CABS study resources

ABAA CABS flashcards

ABAA CABS · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Asbestosis
A chronic lung disease caused by inhalation of asbestos fibers, characterized by diffuse interstitial fibrosis; latency is typically 10–20 years after exposure.
Mesothelioma
A rare cancer of the pleura or peritoneum associated with asbestos exposure; latency is 20–50 years, and risk may occur at low exposure levels.
OSHA PEL
The permissible exposure limit for asbestos is 0.1 fibers per cubic centimeter (f/cc) as an 8-hour time-weighted average, with a 1.0 f/cc excursion limit over 30 minutes.
NESHAP
National Emission Standards for Hazardous Air Pollutants; 40 CFR 61 Subpart M regulates asbestos during demolition and renovation, requiring notification and work practices.
AHERA
Asbestos Hazard Emergency Response Act; 40 CFR 763 Subpart E requires accredited inspectors, management plans, and periodic surveillance for schools.
OSHA Class I work
Asbestos work involving removal of thermal system insulation or surfacing ACM/PACM; requires negative-pressure enclosure and regulated area.
RACM
Regulated Asbestos-Containing Material under NESHAP; includes friable ACM and nonfriable ACM that will be crumbled, pulverized, or reduced to powder during handling.
Friable ACM
Asbestos-containing material that can be crumbled, pulverized, or reduced to powder by hand pressure when dry; more likely to release fibers.
PACM
Presumed Asbestos-Containing Material; surfacing material or thermal system insulation assumed to contain asbestos unless sampled and shown to be <1%.
Homogeneous area
A material of uniform color and texture throughout a building; samples from one homogeneous area are assumed to represent the entire area.
AHERA sampling rule
For each homogeneous area, collect at least 3 samples; if all positive, area is ACM; if all negative, non-ACM; if mixed, collect additional samples up to 7.
Category I nonfriable
Nonfriable asbestos-containing material such as asphalt roofing, gaskets, and resilient floor coverings; may become friable during demolition or renovation.
Pre-inspection records review
Review building drawings, prior reports, permits, and renovation history to identify likely asbestos-containing materials and plan the inspection.
Sampling plan
A written strategy detailing the number and locations of bulk samples per homogeneous area, based on regulatory requirements (e.g., AHERA 3 samples).
Wet sampling methods
Techniques using water or a wetting agent to suppress fiber release during bulk sampling; required to minimize exposure.
Chain of custody
A documented record tracking each sample from collection through laboratory analysis, including dates, times, and signatures of persons handling the sample.
Composite sampling
Combining multiple samples into one; generally not recommended for asbestos because it can dilute fiber content and cause false negative results.
PLM
Polarized Light Microscopy; the standard method for bulk asbestos analysis (NIOSH 9002, EPA 600/R-93/116), with a detection limit of about 1% by weight.
TEM
Transmission Electron Microscopy; used for air clearance samples under AHERA and can identify fibers smaller than 0.25 µm.
PCM
Phase Contrast Microscopy; used for OSHA air monitoring, counts fibers >5 µm but cannot distinguish asbestos from other fibers.
PLM detection limit
PLM can reliably detect asbestos at approximately 1% by weight; below this level, quantification is uncertain and may require other methods.
Thermal system insulation
Insulation on pipes, boilers, and ducts; a common asbestos-containing material, often friable and requiring special handling.
HVAC plenum
A compartment or chamber used for air distribution; may contain surfacing ACM that can release fibers into the air stream if damaged.
Material condition assessment
Evaluation of ACM as good, damaged, or significantly damaged; considers friability, accessibility, and potential for disturbance.
AHERA management plan
A document required for schools, including inspection results, response actions, and a plan for periodic surveillance and re-inspection.
OSHA record retention
Exposure records must be kept for 30 years; medical records for duration of employment plus 30 years.
Inspection report contents
Must include building description, inspection date, inspector accreditation, sampling locations, lab results, conclusions, and recommendations.
Conflict of interest
A situation where an inspector has a financial or personal interest in the outcome; must be avoided or disclosed to maintain objectivity.
QA/QC procedures
Quality assurance and quality control measures, such as using accredited labs, duplicate samples, and blank samples, to ensure data reliability.
Abatement oversight
Monitoring of abatement contractor activities to verify compliance with regulations, work practices, and project specifications.
AHERA clearance
Post-abatement air sampling analyzed by PCM; clearance requires fiber concentration <0.01 f/cc (or TEM <70 s/cc) after visual inspection.
Aggressive sampling
Air sampling conducted after disturbing air (e.g., with fans) to simulate normal building activity; used for AHERA clearance.