Cable Fault on a Pad-Mounted URD Loop

ABB HCLD · Put your knowledge to work in context.

All case studies

Cable Fault on a Pad-Mounted URD Loop

A residential subdivision is served by a 15 kV underground loop with pad-mounted transformers and sectionalizing elbows. One transformer goes dark; neighbors on the same loop remain energized. The loop is normally operated with a open point to keep it radial. You have a thumper, a time-domain reflectometer (TDR), and a cable locator. The faulted transformer's elbows are accessible. Records show the cable is 1/0 AL XLPE, direct-buried, with a splice near a driveway crossing about 300 ft from the pad.

1. Describe how you would isolate and identify the faulted cable section, and what each test tool contributes.

Read the worked answer

Isolation:

  • Open the loop at the pad and at the upstream sectionalizing point so the faulted section is de-energized and isolated from both directions.
  • Verify absence of voltage and ground the cable per procedure before testing.

Tools:

  • TDR sends a pulse and measures reflections; an open or short produces a characteristic reflection whose time delay gives distance. This can locate the fault to within a few feet and confirm whether it is a splice or cable.
  • Thumper applies high-voltage pulses that break down the fault and produce an audible/visible discharge at the fault point; useful for high-resistance faults that TDR cannot see clearly.
  • Cable locator traces the cable path so the TDR distance can be translated to a ground location, especially near the driveway splice.

Because a splice exists at ~300 ft, suspect the splice first; TDR will show a reflection at the splice even if healthy, so compare against a known-good phase or the recorded splice distance.

2. The TDR shows a reflection consistent with a fault near the splice. What are the safety and restoration considerations before excavating?

Read the worked answer

Safety:

  • The cable must be de-energized, verified, and grounded at the work location; URD cables can retain charge and can be backfed from the loop or customer generation.
  • Locate all underground utilities before excavation (call for locates); the splice is near a driveway, so watch for gas, water, and communications.
  • Establish MAD and use grounded cable spiking or cutting tools if the cable must be cut; never cut an unproven cable.
  • Barricade the excavation and control traffic near the driveway.

Restoration:

  • Excavate to the splice, inspect for moisture ingress or damaged insulation; replace the splice with a rated kit rather than re-taping.
  • Test the repaired cable (insulation resistance and, if available, a proof test) before re-energizing.
  • Re-establish the loop configuration and verify voltage at the transformer before closing the customer's transformer.
  • Document the repair location for records.