ABC Wastewater Treatment Class II study materials
ABC Wastewater Treatment Class II study resources

ABC Wastewater Treatment Class II study plan

ABC Wastewater Treatment Class II · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Secondary Treatment (Suspended Growth and Attached Growth) & Preliminary and Primary Treatment

  • Diagram the activated sludge flow path from influent through secondary clarifier, labeling each unit process and recycle stream

  • Explain the roles of F/M ratio, MCRT/SRT, and MLSS in controlling suspended-growth performance

  • List the safety hazards specific to secondary treatment (confined spaces, biological aerosols, slippery surfaces) and the control for each

  • Describe the purpose and typical removal targets of preliminary screening and grit removal

Your checkpoint

One-page hand-drawn process flow diagram of the full liquid train with recycle streams and a 10-item hazard/control table for secondary treatment

Week 2

Secondary Treatment (Suspended Growth and Attached Growth)

  • Calculate MCRT, F/M ratio, and MLSS inventory given daily flow, aeration basin volume, and waste sludge rate

  • Diagnose common suspended-growth problems (bulking, foaming, pin floc, dispersed growth) from a written set of operating observations

  • Compare trickling filter and rotating biological contactor operation, including media, loading, and recirculation

  • Identify the process control adjustments available to an operator for each diagnosis

Your checkpoint

Worked solution set of 6 process-control math problems plus a troubleshooting matrix mapping 5 symptoms to probable causes and corrective actions

Week 3

Solids Handling, Thickening, Dewatering, and Digestion & Preliminary and Primary Treatment

  • Trace solids through thickening, dewatering, and digestion, stating the purpose and typical feed/target solids for each step

  • Calculate percent solids, volatile solids reduction, and sludge volume/loading for a gravity thickener and belt press

  • Describe anaerobic digester start-up, feeding, mixing, and the indicators of sour or unstable digestion

  • Explain primary clarifier hydraulic and solids loading and how to respond to a rising sludge blanket

Your checkpoint

Solids-handling calculation worksheet (8 problems) with a labeled diagram of the solids train and a digester stability indicator checklist

Week 4

Pumps, Motors, Instrumentation, and Process Control & Maintenance, Troubleshooting, and Equipment Reliability

  • Interpret pump and system curves to explain cavitation, runout, and operating-point shifts

  • Describe preventive maintenance schedules for pumps, blowers, and motors and the failure signatures each schedule prevents

  • Read and interpret common instrumentation outputs (level, flow, DO, pressure) and identify out-of-range readings

  • Outline a troubleshooting sequence for a pump that has lost capacity

Your checkpoint

Maintenance and troubleshooting log template populated with 5 realistic equipment fault scenarios, each with a step-by-step diagnostic path

Milestones

Week 4: Score at least 80% on a self-made 40-question quiz covering domains 2, 3, 5, 6, and 7, and complete all four weekly deliverables