ABC Wastewater Treatment Class IV study materials
ABC Wastewater Treatment Class IV study resources

ABC Wastewater Treatment Class IV cheat sheet

ABC Wastewater Treatment Class IV · Keep the key ideas within reach.

Quick reference

Process Control and Operational Troubleshooting

  • SVI = (30-minute settled sludge volume, mL/L × 1,000) ÷ MLSS, mg/L. 80–150 indicates good settling; 150–250 indicates bulking; above 250 indicates severe bulking or denitrification in the clarifier.

  • F/M (lb BOD per lb MLVSS per day) = lb BOD entering the aeration basin per day ÷ lb MLVSS under aeration. Conventional 0.2–0.4, extended aeration 0.05–0.15, high-rate 0.4–1.5.

  • MCRT (days) = lb of solids in the system ÷ lb of solids leaving per day in waste sludge plus effluent. Nitrification typically needs 8–15 days at 20°C and 15–20 days at 10°C.

  • Hold DO near 2.0 mg/L in the nitrifying zone. If DO falls below 1.0 mg/L, check blower output, diffuser fouling, and RAS/WAS rates before changing wasting - raising wasting cannot fix an air delivery problem.

  • Alkalinity destroyed is about 7.14 mg/L as CaCO3 per mg/L of ammonia nitrogen nitrified. Effluent pH below 6.5 with alkalinity below 50 mg/L means nitrification is consuming the buffer.

  • Rising blanket with clear supernatant and gas bubbles = denitrification in the clarifier (increase RAS rate, lower SRT, cut clarifier detention). Rising blanket with cloudy supernatant = solids overload (increase wasting, check SVI and surface overflow rate).

  • Percent removal = [(influent − effluent) ÷ influent] × 100, with both values in the same units.

  • SVI below 80 with a dense blanket points to over-wasting, pin floc, or polymer carryover; SVI above 150 at low F/M points to filamentous growth - check DO, nutrient ratio (BOD:N:P ≈ 100:5:1), and septic or high-sulfide influent.

Quick reference

Physical, Chemical, and Biological Treatment Units

  • Primary clarifier design: detention 1.5–2.5 h, surface overflow rate 600–1,000 gpd/ft² at average flow, weir loading below 10,000 gpd/ft.

  • Aerated grit chambers: 2–5 minutes detention at peak flow; adjust air so grit settles while organic solids stay in suspension.

  • Oxygen demand: roughly 1.0–1.5 lb O2 per lb BOD removed, plus 4.57 lb O2 per lb of ammonia nitrogen oxidized.

  • Chlorine disinfection: CT = residual (mg/L) × contact time (min). Required CT rises as pH rises above 7.5 (hypochlorous acid dissociates to the weaker hypochlorite ion), as temperature falls, and as turbidity rises.

  • UV disinfection: design dose 30–40 mJ/cm²; needs UV transmittance typically above 65% and low TSS. Fouled sleeves and high suspended solids cut delivered dose without changing lamp power.

  • Trickling filter organic loading = lb BOD/day ÷ 1,000 ft³ of media. Recirculation raises hydraulic loading and dilutes influent strength; surface ponding signals media clogging or incomplete sloughing.

  • Anaerobic digestion (mesophilic): 35–38°C, SRT 15–20 days, volatile solids loading 0.1–0.2 lb VS/ft³·day. VFA-to-alkalinity ratio of 0.1–0.35 is stable; above 0.8 indicates souring.

  • Chemical precipitation: 1 mg/L of alum consumes roughly 0.45 mg/L of alkalinity as CaCO3; ferric chloride is more corrosive and depresses pH more per mg/L added. Equalization volume is sized from the flow mass diagram as the largest cumulative difference between inflow and average outflow.

Quick reference

Solids Handling and Residuals Management

  • Solids load (lb/day) = flow (MGD) × 8.34 × concentration (mg/L). Multiply by 0.001 to convert to tons per day when the concentration is in percent solids.

  • Gravity thickener solids loading: about 20–30 lb/ft²·day for primary sludge and 4–8 lb/ft²·day for waste activated sludge; overflow rate 200–400 gpd/ft² for primary and 100–200 gpd/ft² for WAS.

  • Dewatering performance is judged by three numbers together: cake solids percent, solids capture (target above 90%), and polymer dose in lb per dry ton.

  • Lime stabilization: raise pH to 12.0 and hold for 2 hours, then keep pH above 11.5 for 24 hours to satisfy vector attraction reduction.

  • Class A composting PFRP: 55°C for 3 days in-vessel or aerated static pile followed by curing at 40°C for 14 days; windrow systems need 55°C for at least 15 days with five or more turnings.

  • 40 CFR 503 Class B alternatives: fecal coliform below 2,000,000 MPN/g total solids, or Salmonella below 3 MPN/4 g total solids, plus a vector attraction reduction option.

  • Belt filter press troubleshooting order: floc quality and polymer mixing energy, then belt tracking, then wash water pressure and spray coverage, then belt tension and speed. Over-shearing the floc destroys dewaterability.

  • Anaerobic digester upset response: stop or reduce feed, stabilize temperature, verify mixing, and check for foaming; adding alkalinity raises pH but does not remove the volatile acids causing the drop.

Quick reference

Collection Systems, Pumping, and Flow Measurement

  • Q = A × V. A 1 ft² cross-section flowing at 2 ft/s carries 2 cfs, about 1.29 MGD. Conversions: 1 MGD = 1.55 cfs = 694 gpm.

  • Affinity laws for centrifugal pumps: Q ∝ N, H ∝ N², P ∝ N³. A 10% speed reduction cuts power roughly 27%.

  • The operating point is the intersection of the pump curve and the system curve (static head plus friction). Throttling moves the operating point along the pump curve; changing speed or impeller diameter changes the curve itself.

  • NPSH available must exceed NPSH required. Cavitation appears as noise, vibration, and falling head/flow - check suction lift, plugged strainers, and vapor pressure at the water temperature.

  • Minimum wet well volume for pump cycling (gal) = pump capacity (gpm) × minimum cycle time (min) ÷ 4, assuming inflow near half of pump capacity. Excessive cycling is corrected with larger storage or VFD control.

  • Parshall flume free flow requires submergence (downstream depth ÷ upstream depth) below about 70% for throats up to 1 ft and about 60% for larger throats; beyond that a submerged-flow correction is applied and accuracy falls.

  • Weir formulas: suppressed rectangular weir, Q (cfs) = 3.33 × L (ft) × H (ft)^1.5; 90° V-notch weir, Q (cfs) = 2.5 × H (ft)^2.5.

  • Sanitary sewers: 2 ft/s minimum self-cleansing velocity at design flow and about 10 ft/s maximum to limit abrasion and sulfide generation. Rising pump run-hours at steady flow indicate infiltration; wet-weather spikes indicate inflow.

Quick reference

Laboratory Analysis and Process Monitoring

  • BOD5: incubate at 20°C ± 1°C for 5 days. The test is valid when depletion is at least 2 mg/L and residual DO is at least 1 mg/L; otherwise dilute further and apply the seed correction.

  • TSS: filter through a glass fiber filter and dry at 103–105°C. VSS: ignite the dried filter at 550°C; the loss on ignition is the volatile fraction.

  • Settleable solids are measured in an Imhoff cone for 60 minutes and reported in mL/L. The 30-minute settled volume in a 1,000 mL graduated cylinder is the numerator of the SVI calculation.

  • Calibrate pH with 4.0, 7.0, and 10.0 buffers; a slope outside 95–105% means the electrode needs cleaning, rehydration, or replacement.

  • BOD5/COD for domestic wastewater is roughly 0.5–0.7. A sharp drop in the ratio signals an industrial discharge of poorly biodegradable organics.

  • Percent removal = [(influent − effluent) ÷ influent] × 100. Duplicate analyses should agree within the method's control limit before results are used for process decisions.

  • Residual chlorine by DPD colorimetry at 515 nm; switch to amperometric titration when color, turbidity, or combined chlorine interferes with the colorimetric reading.

  • Membrane filtration uses a 0.45 µm filter: fecal coliform incubated at 44.5°C, total coliform at 35°C, reported as colonies per 100 mL. Grab samples are required for pH, chlorine, and dissolved oxygen because those values change in the bottle; flow-proportioned composites are used for loading-based permit limits.

Quick reference

Safety, Regulations, and Records Management

  • Permit-required confined space entry: test before entry and continuously during entry - oxygen 19.5–23.5%, combustible gas below 10% LEL, hydrogen sulfide below 10 ppm, carbon monoxide below 35 ppm.

  • Hydrogen sulfide: OSHA ceiling 20 ppm, IDLH 100 ppm. The sense of smell is deadened at high concentrations, so odor is never a valid warning of a dangerous atmosphere.

  • Chlorine gas: OSHA ceiling 1 ppm, IDLH 10 ppm. Open cylinder valves slowly, never apply heat or water to a leaking container, and evacuate upwind.

  • NPDES permits are issued for terms up to 5 years. Discharge Monitoring Reports are submitted on the permit schedule and supporting records are retained at least 3 years under 40 CFR 122.41.

  • 40 CFR 503 Class B: fecal coliform below 2,000,000 MPN/g total solids, or Salmonella below 3 MPN/4 g total solids, at the time of use or disposal, plus a vector attraction reduction practice.

  • Lockout/tagout (29 CFR 1910.147): isolate every energy source, release stored energy, verify isolation by attempting startup, and allow only the person who applied the lock to remove it.

  • Hazard communication (29 CFR 1910.1200): a current safety data sheet must be accessible for every chemical on site, and every container must be labeled with its identity and hazard warnings.

  • Sanitary sewer overflows and significant noncompliance are reported to the primacy agency within the time stated in the permit or state rule - commonly 24 hours by phone with written follow-up within 5 days.

Quick reference

Supervision, Maintenance, and Asset Management

  • MTBF = operating hours ÷ number of failures; MTTR = total repair hours ÷ number of repairs; availability = MTBF ÷ (MTBF + MTTR).

  • Predictive tools map to failure modes: vibration analysis for bearings and imbalance, infrared thermography for electrical and insulation faults, oil analysis for wear metals and contamination, ultrasound for leaks and early bearing faults.

  • Criticality ranking = consequence of failure × likelihood of failure. It sets spare-parts stocking levels, PM frequency, and rebuild-versus-replace decisions.

  • Energy benchmark: kWh/MG = (kW × 24) ÷ MGD. A rising trend at constant flow points to fouled diffusers, worn impellers, or partially plugged piping.

  • Work order backlog measured in crew-weeks: sustained backlog above 4–6 weeks signals understaffing, while scheduled-task compliance below 80% usually signals planning and parts problems rather than labor shortage.

  • A preventive task is interval-based (change oil at 2,000 hours); a predictive task is condition-based (change oil when analysis shows it). Do not schedule both for the same failure mode.

  • Root cause analysis separates the physical cause, the human cause, and the latent system cause; corrective action targets the system, not just the failed part.

  • Certification and training records must be retained, operator grade must match the plant classification, and shift coverage must satisfy the permit's staffing requirement.