ABPath Clinical Informatics study materials
ABPath Clinical Informatics study resources

ABPath Clinical Informatics: Systems Design, Selection, Implementation, and Optimization

ABPath Clinical Informatics · Work through your exam, one topic at a time.

All guide sections

Systems Design, Selection, Implementation, and Optimization

Lifecycle and selection

System work follows a lifecycle: needs assessment, workflow analysis, requirements definition, market scan, request for information or proposal, vendor demonstration, contract, design and build, testing, training, go-live, and optimization. Requirements should be traceable to workflows and to measurable acceptance criteria. Build-versus-buy decisions weigh total cost of ownership, integration risk, configurability, vendor viability, and regulatory fit, not just license price.

Implementation and testing

Distinguish verification (did we build it correctly?) from validation (does it work in the real clinical workflow?). Use unit, integration, regression, and user acceptance testing. Cutover can be big-bang or phased; both need a rollback plan, command center, at-the-elbow support, and downtime procedures. Training should be role-based and workflow-based. Optimization starts after stabilization, using usage data, help-desk themes, and safety reports.

Traps

Frequent distractors include selecting a vendor before documenting requirements, treating go-live as project completion, and confusing testing types. Another trap is assuming a configured product needs no local validation. Ignoring interface volume, report build, and device integration is also common.

Worked example / rule of thumb

A hospital wants bar-code medication administration. The requirements traceability matrix lists scan patient wristband and scan medication, and links each requirement to test scripts, acceptance criteria, and training. The team validates with nurses on the actual unit at shift change. Rule of thumb: no go-live without workflow validation, downtime drills, and a rollback plan.