ACCA MA flashcards
ACCA MA · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Data versus information
- Data are raw, unprocessed facts and figures; information is data processed and presented so that it is meaningful and useful to the person receiving it.
- Qualities of good information
- Accurate, complete, cost-effective, relevant, authoritative, timely and easy to use; information failing these tests wastes resources and leads to poor decisions.
- Strategic information
- Long-term, summarised, largely external information used by senior management for setting objectives and planning the direction of the whole organisation.
- Operational information
- Short-term, highly detailed, mainly internal information used by junior management and staff to control day-to-day activities and transactions.
- Stratified sampling
- The population is divided into homogeneous groups (strata) and random samples are drawn from each stratum, ensuring every group is represented in the sample.
- Systematic sampling
- Every nth item in a population list is selected after a random start; simple to apply but biased if the list has a repeating pattern.
- Big data characteristics
- Volume, velocity, variety and veracity: large, fast-moving, varied and uncertain data that require specialist analytical tools rather than a standard spreadsheet.
- High-low method
- Splits a semi-variable cost by dividing the difference in total cost by the difference in activity between the highest and lowest activity levels, giving variable cost per unit.
- Overhead absorption rate
- Budgeted overhead divided by budgeted activity level (units, labour hours or machine hours), used to charge overhead into product costs under absorption costing.
- Contribution
- Sales revenue less variable costs; it first covers fixed costs and any surplus is profit, and it is the basis of marginal costing and CVP analysis.
- Breakeven point
- Activity level at which total contribution equals fixed costs, so profit is zero; in units it is fixed costs divided by contribution per unit.
- Margin of safety
- Excess of budgeted or actual sales over breakeven sales, expressed in units, revenue or as a percentage of budgeted sales; measures the fall in sales before a loss arises.
- Equivalent units
- Notional fully complete units used in process costing, calculated as completed output plus closing work in progress multiplied by its degree of completion.
- Cost driver rate
- Cost pool total divided by total driver volume, giving a cost per unit of activity used to charge overhead to products on the basis of the activities they consume.
- Zero-based budgeting
- Each cost centre's budget is built from zero and every activity must be justified and ranked in priority packs, so inefficiencies are challenged but preparation is time-consuming.
- Rolling budget
- A budget continuously updated by adding a further period as the earliest expires, so the planning horizon stays constant and estimates remain realistic.
- Flexible budget
- A budget prepared for a range of activity levels and flexed to the actual level achieved, allowing like-for-like comparison between budgeted and actual costs.
- Budgetary slack
- Deliberate understatement of budgeted revenue or overstatement of budgeted costs by managers to make targets easier to achieve; reduced by participation and review.
- Limiting factor ranking
- Scarce resource allocation: calculate contribution per unit of the limiting factor for each product, rank highest first, then allocate the available resource in that order.
- Learning curve rate
- The proportion of cumulative average time retained each time cumulative output doubles; with an 80% rate the average time per unit falls to 80% of its previous value.
- Material price variance
- (Standard price − actual price) × quantity purchased; favourable when the actual price is below standard, and usually the purchasing manager's responsibility.
- Material usage variance
- (Standard quantity for actual output − actual quantity used) × standard price; an adverse figure may reflect poor quality material or inefficient production.
- Labour efficiency variance
- (Standard hours for actual output − actual hours worked) × standard rate; adverse if more hours than standard were needed, often the production supervisor's responsibility.
- Fixed overhead volume variance
- (Actual production − budgeted production) × standard fixed overhead per unit; it measures the over- or under-absorption caused by producing at a different volume from budget.
- Sales volume profit variance
- (Actual units sold − budgeted units) × standard profit per unit; it measures the profit effect of selling a different volume from the budgeted volume.
- Planning variance
- Difference between a revised standard, reflecting factors not controllable when the budget was set, and the original standard, separated from operational variances caused by controllable factors.
- ROCE
- Operating profit divided by capital employed, expressed as a percentage; it measures the return generated by all the long-term funds invested in the business.
- Residual income
- Divisional profit less an imputed interest charge on divisional capital employed; unlike ROI it encourages managers to accept projects earning above the cost of capital.
- Current ratio
- Current assets divided by current liabilities; a short-term liquidity measure of whether current obligations can be settled from current assets as they fall due.
- Working capital cycle
- Inventory days plus receivable days minus payable days; the number of days between paying suppliers for goods and receiving cash from customers.
- Balanced scorecard
- Performance framework using four perspectives - financial, customer, internal business process, and learning and growth - to balance financial and non-financial measures of performance.
- Value for money
- Assessed using the three Es: economy (cost of inputs), efficiency (output achieved per unit of input) and effectiveness (the degree to which stated objectives are met).