- Cost driver
- A factor or activity that causes a change in the total cost of an activity; used as the allocation base in activity-based costing to attach overheads to products more accurately.
- Target cost
- The allowable cost of a product calculated as the competitive market selling price minus the required profit margin; the design team must close any cost gap.
- Cost gap
- The difference between the estimated cost of a product under current design and its target cost; it must be eliminated through value engineering before production begins.
- Throughput accounting ratio
- Throughput per unit of bottleneck resource divided by total factory cost per unit of bottleneck resource; a value above 1.0 indicates the product is profitable on the constraint.
- Life-cycle costing
- Accumulating all costs of a product from research and design through to abandonment and disposal, so that pre-production costs are matched against total lifetime revenues.
- Value engineering
- A systematic review of product design to reduce cost while preserving or improving the function valued by customers; used to close a target costing cost gap.
- Non-conformance costs
- Internal and external failure costs arising because poor quality has occurred, such as scrap, rework, warranty claims and customer complaint handling.
- Environmental cost driver
- A measure of the environmental impact of an activity, such as volume of emissions or waste, used to assign environment-related costs more accurately to output.
- Relevant cost
- A future, incremental cash flow that differs between alternatives; sunk costs, committed costs and apportioned fixed overheads are excluded from decision making.
- Opportunity cost
- The contribution or benefit forgone by using a scarce resource in one way rather than its next best alternative use; it is a relevant cost in decisions.
- Break-even point
- The level of activity at which total contribution equals total fixed costs, giving neither profit nor loss; calculated as fixed costs divided by contribution per unit.
- Margin of safety
- The amount by which budgeted or actual sales exceed break-even sales, expressed in units, revenue or as a percentage of budgeted sales.
- Limiting factor ranking
- When a resource is scarce, products are ranked by contribution per unit of that resource and the resource is allocated in ranking order to maximise total contribution.
- Expected value
- The weighted average of all possible outcomes using their probabilities; it represents a long-run average and ignores the decision-maker's attitude to risk.
- Sunk cost
- A cost already incurred that cannot be changed by any future decision; it is excluded from relevant costing because it is not a future incremental cash flow.
- Price elasticity of demand
- The percentage change in quantity demanded divided by the percentage change in price; demand is elastic when the absolute value of the ratio exceeds one.
- High-low method
- A technique separating fixed and variable costs by comparing the highest and lowest activity levels: variable cost per unit equals the change in cost divided by the change in activity.
- Learning curve formula
- y = ax^b, where y is cumulative average time per unit, a is time for the first unit, x is cumulative units, and b equals log(learning rate) divided by log 2.
- Flexible budget
- A budget prepared for the actual level of activity achieved; comparing it with actual results produces operational variances free from the effect of volume differences.
- Planning variance
- The difference between the original fixed budget and the revised flexible budget, measuring the effect of changes in standards or forecasts rather than operational performance.
- Material usage variance
- The difference between the standard quantity for actual output and the actual quantity used, multiplied by standard price; it isolates inefficient use of materials.
- Labour efficiency variance
- The difference between standard hours for actual output and actual hours worked, multiplied by the standard rate; it measures the productivity of labour against standard.
- Zero-based budgeting
- A budgeting approach where every activity and cost must be justified from a zero base each period, rather than rolling forward prior-year figures with incremental adjustments.
- Fixed overhead volume variance
- The difference between fixed overhead absorbed and budgeted fixed overhead, caused by actual activity differing from budget; it splits into capacity and efficiency variances.
- Return on investment
- Controllable divisional profit divided by controllable divisional investment, usually expressed as a percentage; it measures profit generated per unit of capital employed.
- Residual income
- Controllable profit minus a notional interest charge on controllable investment; unlike ROI it encourages managers to accept projects earning above the required rate.
- Balanced scorecard
- A performance framework measuring financial, customer, internal business process, and learning and growth perspectives to link long-term strategy with day-to-day performance measures.
- Performance prism
- A stakeholder-focused framework with five facets: stakeholder satisfaction, strategies, processes, capabilities, and stakeholder contribution, used to design comprehensive performance measurement.
- Value for money
- A public-sector assessment using the three Es: economy in acquiring inputs, efficiency in converting inputs to outputs, and effectiveness in achieving intended objectives.
- Minimum transfer price
- The supplying division's marginal cost of the transferred unit plus the opportunity cost per unit of transferring internally rather than selling in the external market.
- Goal congruence
- The alignment of divisional managers' own interests with the overall objectives of the organisation, so that decisions benefiting a division also benefit the whole group.
- Fitzgerald and Moon model
- A performance measurement framework using dimensions (financial and non-financial), standards (ownership and achievability) and rewards to assess service organisations.