- Effective embedment depth (hef)
- Distance from the concrete surface to the deepest point of the adhesive bond, excluding the anchor tip. It sets the bond area and drives tension capacity.
- Blow-brush-blow cleaning
- The standard hole-cleaning sequence: blow out dust, brush the full hole depth, then blow again. The specified number of cycles must be completed exactly.
- Gel time
- The working time after mixing during which the adhesive remains flowable and the anchor can still be inserted and adjusted. It shortens as temperature rises.
- Cure time
- The period after insertion during which the adhesive must remain undisturbed before torque or load is applied. It lengthens as concrete temperature falls.
- Discard first extrusion
- The initial adhesive pushed from a new cartridge may be incompletely mixed. It is discarded until the extruded material shows uniform color and consistency.
- Critical edge distance
- The minimum distance from the anchor center to a free concrete edge at which full capacity can be developed. Closer spacing reduces capacity.
- Minimum anchor spacing
- The smallest center-to-center distance between adjacent anchors that avoids overlapping stress cones. It is usually expressed as a multiple of embedment depth.
- Hole diameter tolerance
- The allowable range of drilled hole diameter for a given anchor. Oversized holes reduce bond and may disqualify the installation.
- Drill depth allowance
- Extra hole depth drilled beyond the required embedment to accommodate dust and debris, ensuring the anchor reaches full embedment.
- Torque verification
- Application of the specified installation torque after full cure to confirm the anchor is properly set and the adhesive bond is sound.
- Rotary hammer drilling
- A drilling method producing a rougher hole wall with more dust than diamond coring. Cleaning requirements may differ by drilling method.
- Diamond core drilling
- A drilling method producing a smooth, precise hole. Some adhesive systems specify different cleaning or hole preparation for cored holes.
- Two-part adhesive mixing
- Resin and hardener are combined through a static mixing nozzle. Proper mixing is essential; incomplete mixing prevents curing and causes anchor failure.
- Embedment verification
- Confirming the anchor reaches the design depth using a marked rod or depth gauge before adhesive cures, since short embedment reduces capacity.
- Hole cleanliness inspection
- Visual and tactile check that the hole is free of dust, debris, and standing water before adhesive injection. Cleanliness is the top field variable.
- Adhesive injection method
- Injecting adhesive from the bottom of the hole upward to avoid trapping air pockets, then inserting the anchor with a slight twisting motion.
- Cracked concrete qualification
- Testing that demonstrates anchor performance in concrete with active cracks. Anchors qualified only for uncracked concrete require reduced capacities in cracked conditions.
- Concrete breakout capacity
- The tension capacity governed by a concrete cone failure around the anchor. It increases with embedment depth and decreases near free edges.
- Bond strength failure
- A failure mode where the adhesive-to-concrete interface gives way. It depends on hole cleaning, concrete strength, and embedment depth.
- Steel strength limit
- The maximum tension or shear capacity of the anchor itself. In deep embedments in strong concrete, steel often governs over bond or breakout.
- Splitting failure
- Concrete fracture caused by anchor expansion or proximity to edges and other anchors. Adhesive anchors reduce this risk by avoiding expansion forces.
- Overhead installation
- Installing anchors in a soffit or ceiling. Requires an adhesive formulated to resist flow-out before cure and rated for that orientation.
- Water-filled hole procedure
- A manufacturer-approved method for installing in wet or submerged holes, using specific cleaning and adhesive suited to water exposure.
- Seismic qualification
- Testing and design provisions confirming an anchor can resist earthquake loading, including crack cycling and load reversals in tension and compression.
- Fire-resistance rating
- Evaluation of anchor capacity at elevated temperature. Adhesives may lose strength above their glass transition temperature, affecting design.
- Rebar location scanning
- Using ground-penetrating radar or a magnetic locator to find reinforcement before drilling, avoiding cutting rebar or post-tensioning strands.
- Post-tensioning strand avoidance
- Post-tensioning cables carry high stress. Drilling into them can cause structural failure and is generally prohibited; locate them before drilling.
- Proof load testing
- Field application of a specified test load to a sample of installed anchors to verify installation quality, per the project specification.
- Concrete compressive strength
- The specified strength (f'c) of concrete at installation, which affects bond and breakout capacity. Lower strength reduces anchor capacity.
- Anchor spacing effect
- Anchors installed closer than the minimum spacing share stress cones, reducing group capacity compared to isolated anchors.
- Edge distance effect
- Anchors installed near a free edge have reduced breakout and splitting capacity. Minimum edge distance is specified in absolute units.
- Installation record keeping
- Documenting hole cleaning, embedment depth, adhesive lot, temperature, and cure time provides traceability and supports quality control.
- Temperature at installation
- Concrete and ambient temperature determine gel and cure times and may require heated or cooled adhesive handling per manufacturer instructions.