ACI CQTM · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Concrete Quality Management

  • Define the components of a concrete quality management system and explain how each supports acceptance decisions

  • Distinguish among the roles of owner, contractor, testing lab, and specifier in quality assurance versus quality control

  • Identify the governing standards that apply to concrete materials, sampling, and testing

  • Explain how submittals, mix design approval, and pre-placement conferences establish quality requirements before construction

Your checkpoint

A one-page quality management system map linking each role to its quality assurance or quality control responsibilities and the standard that governs it

Week 2

Concrete Quality Management

  • Describe proper sampling procedures for fresh concrete and justify why sampling location and timing affect result validity

  • Calculate required specimen quantities and curing regimes for strength acceptance testing

  • Interpret compressive strength test results against acceptance criteria and determine compliance or non-compliance

  • Explain the process for investigating low-strength results, including core testing and evaluation options

Your checkpoint

A worked acceptance-testing scenario with specimen schedule, computed strength results, and a written compliance determination with justification

Week 3

Concrete Quality Management

  • Interpret statistical measures of concrete quality including standard deviation, coefficient of variation, and moving averages

  • Apply acceptance criteria based on statistical evaluation of strength records

  • Explain how to establish and adjust mix proportions using field performance data

  • Identify the actions required when quality trends indicate a loss of control

Your checkpoint

A statistical quality analysis of a synthetic set of strength records, including computed variability measures and a control-action recommendation

Week 4

Concrete Quality Management

  • Differentiate among acceptance, rejection, and evaluation of nonconforming work

  • Describe documentation and recordkeeping requirements for quality records and traceability

  • Explain the purpose and structure of a quality manual, inspection plan, and test report

  • Outline a root-cause investigation for a recurring quality nonconformity

Your checkpoint

A nonconformance report template with root-cause analysis section and a completed example for a simulated strength failure

Week 5

Concrete Construction Practices

  • Describe batching, mixing, transporting, and placing operations and the quality controls applied at each stage

  • Explain how water-cementitious ratio, slump, air content, and temperature are controlled in the field

  • Identify proper consolidation, finishing, and curing practices and their effect on durability and strength

  • Describe hot-weather and cold-weather concreting precautions and their quality implications

Your checkpoint

A field inspection checklist covering batching through curing with the acceptance limit or control measure cited for each item

Week 6

Concrete Construction Practices

  • Explain formwork, reinforcement placement, and embedment requirements that affect concrete quality

  • Describe joint layout, construction joint preparation, and surface preparation requirements

  • Identify common placement defects and their corrective actions

  • Explain how pre-pour inspection and hold points prevent construction defects

Your checkpoint

A pre-pour inspection hold-point list with the verification method and responsible party for each hold point

Week 7

Concrete Quality Management & Concrete Construction Practices

  • Connect field construction practices to the quality management outcomes they influence

  • Evaluate case scenarios that combine placement problems with acceptance testing results

  • Apply specification requirements to resolve field disputes over workmanship and acceptance

  • Prioritize corrective actions when schedule pressure conflicts with quality requirements

Your checkpoint

Three integrated case analyses, each linking a construction practice issue to a quality management decision with a documented resolution

Week 8

Concrete Quality Management & Concrete Construction Practices

  • Synthesize the full quality management and construction practice body of knowledge into a personal reference outline

  • Complete timed practice sets across both domains and analyze error patterns by topic

  • Rehearse explanations of key concepts aloud to confirm recall without notes

  • Finalize a last-review sheet of high-risk topics and acceptance criteria

Your checkpoint

A two-page personal exam reference sheet plus a scored practice-set log with a remediation list for weak areas

Milestones

Week 2: Correctly determine acceptance or non-compliance for a full set of simulated strength results using the applicable acceptance criteria

Week 4: Produce a complete nonconformance documentation package, from test report through root-cause analysis and corrective action

Week 6: Complete a field inspection checklist and pre-pour hold-point list covering all major construction stages

Week 8: Score at least 80 percent on a mixed timed practice set across both domains with an error log identifying remaining weak areas