32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Stamp timing
The point when concrete has stiffened enough that a stamp tool leaves a clean impression without mortar sticking, typically after bleed water disappears.
Release agent
Powder or liquid applied between the stamp and concrete so the tool does not adhere; excess is removed before curing and sealing.
Integral color
Pigment mixed into the concrete at the batch plant to color the entire slab; dosage is limited to avoid strength loss and efflorescence.
Color hardener
Dry-shake product broadcast onto the plastic surface in two passes and floated in to densify and color the top layer.
Surface retarder
Chemical sprayed on fresh concrete that keeps the top mortar green so it can be exposed by washing or brushing after the slab sets.
Exposed aggregate
Finish produced by retarder or mechanical abrasion that removes surface paste to reveal the aggregate beneath.
Antiquing release
Colored powder or liquid that adds accent tones in the joints and texture; it must be cleaned off before sealing.
Control joint depth
A contraction joint cut or tooled to at least one-quarter of the slab thickness to force cracking at a planned location.
Joint spacing rule
A common ACI guideline spaces contraction joints at roughly 24 to 36 times the slab thickness measured in inches.
Slab thickness
Decorative stamped flatwork is typically placed at a nominal 4 inches over compacted base, thickened where vehicle loads occur.
Sealer application
A protective coating applied to dry, clean decorative concrete to enhance color and resist moisture, stains, and abrasion.
Broom finish
A textured finish created by dragging a stiff broom across the surface to improve slip resistance on walks and drives.
Trowel finish
A smooth, dense finish produced by power or hand trowels; it is used where a reflective or polished appearance is desired.
Salt finish
Rock salt broadcast onto the plastic surface and later washed out leaves small pits that give a textured, non-slip appearance.
Saw-cut timing
Joints are cut as soon as the concrete can support the saw without raveling, usually within 4 to 12 hours after finishing.
Form release
A coating applied to forms so they release cleanly from the concrete and do not tear or stain the finished surface.
Water-cement ratio
The ratio of water to cementitious material by weight; lower ratios increase strength and durability and reduce shrinkage.
Slump limit
A measure of concrete workability; decorative flatwork mixes commonly specify a maximum slump near 4 inches.
Air entrainment
Tiny air bubbles intentionally entrained in concrete, typically 5 to 7 percent, to resist freeze-thaw damage in exterior flatwork.
Curing duration
ACI 308 recommends keeping concrete moist for at least 7 days after placement to allow strength gain and reduce cracking.
Cold-weather placement
Concrete should be maintained above roughly 40 to 50 F at placement and protected from freezing until adequate strength develops.
Hot-weather precautions
Cooling materials, placing during cooler hours, and using retarders reduce rapid moisture loss and plastic shrinkage cracking.
Plastic shrinkage
Cracking that occurs while concrete is still plastic when surface evaporation exceeds the bleed water supply.
Evaporation rate
The rate at which moisture leaves the concrete surface; values above about 0.1 lb per sq ft per hour favor plastic shrinkage cracking.
Subgrade preparation
The base is compacted, uniform, and moistened before placement to prevent uneven settlement and rapid moisture loss.
Vapor retarder
A sheet or coating under a slab on grade that limits moisture migration from the soil into the concrete and floor covering.
Isolation joint
A joint that separates flatwork from structures or other slabs so they can move independently without cracking.
Construction joint
A planned stopping place in a placement, often keyed or doweled as designed, where fresh concrete meets previously placed concrete.
Dowel bar
A smooth steel bar placed across a joint to transfer load while allowing longitudinal movement between adjacent slab sections.
Consolidation
Vibration or tamping of fresh concrete to remove entrapped air and ensure it fills forms and surrounds reinforcement.
Bleed water
Water that rises to the surface of fresh concrete as heavier solids settle; it must evaporate before finishing begins.
Finishing sequence
The order of operations after placement: screeding, bull floating, waiting for bleed water to leave, then floating and final texturing.