- ASTM C172
- Standard practice for sampling freshly mixed concrete; requires a representative sample from the middle portion of the batch, protected from contamination and evaporation.
- Representative sample
- A sample that contains the same proportions of ingredients as the batch; obtained from the middle discharge and not from segregated or contaminated material.
- Composite sample
- A sample made by combining increments from several portions of a batch; it is remixed before testing so the result represents the whole batch.
- Sampling receptacle
- A clean, dampened container used to catch fresh concrete; it must not contain set concrete, dirt, or chemicals that could alter the sample.
- ASTM C1064
- Standard test method for temperature of freshly mixed concrete; uses a calibrated immersion thermometer and requires reading after stabilization.
- Thermometer immersion depth
- At least 3 in. (75 mm) of the thermometer sensing portion must be immersed in concrete, away from the container walls.
- Temperature report precision
- Report fresh concrete temperature to the nearest 0.5°C (1°F), matching the precision of the calibrated thermometer and specification.
- Infrared thermometer limitation
- An infrared device measures surface temperature and is not an acceptable substitute for the ASTM C1064 immersion measurement of fresh concrete.
- ASTM C143
- Standard slump test for hydraulic cement concrete; uses a 12-in. mold, three layers, and 25 rod strokes per layer.
- Slump mold dimensions
- The standard slump cone is 12 in. (300 mm) high, with an 8 in. (200 mm) bottom diameter and a 4 in. (100 mm) top diameter.
- Slump measurement
- The vertical drop from the original top of the mold to the displaced center of the concrete, reported to the nearest 1/4 in. (5 mm).
- Slump test timing
- The entire slump test must be completed within 2.5 min after sampling; a sample that has stood is not retested.
- ASTM C138
- Standard test method for density, yield, and gravimetric air content of concrete using a calibrated measure of known volume.
- Unit weight formula
- Density equals the mass of concrete in the measure divided by the measure volume; report as lb/ft³ or kg/m³.
- Yield formula
- Yield equals total batch mass divided by measured unit weight; relative yield compares actual yield with design volume.
- Gravimetric air formula
- Air content equals 100 times one minus measured unit weight divided by theoretical air-free unit weight.
- ASTM C231
- Standard pressure-method test for air content of fresh concrete; based on Boyle's law and requires an aggregate correction factor.
- Aggregate correction factor
- A value subtracted from the pressure meter gauge reading to account for air trapped in porous aggregate; determined for the specific aggregate combination.
- Pressure meter leakage
- Leakage at the lid or valve causes the gauge to read incorrectly; clean the flange and seal the meter before pressurizing.
- Pressure method limitation
- The pressure method may be unreliable for highly porous or lightweight aggregate unless the aggregate correction is verified.
- ASTM C173
- Standard volumetric method for air content; removes air from a concrete sample by agitation and reads the water-level drop.
- Volumetric air reading
- Air content is read directly from the graduated neck of the meter after repeated agitation until the reading stabilizes.
- Volumetric meter agitation
- Invert and roll the meter repeatedly to release entrapped air; continue until the air volume reading no longer changes.
- Volumetric method suitability
- Best suited to dense-aggregate concrete that can be agitated; stiff mixtures or gas-releasing aggregate can give inaccurate results.
- ASTM C31
- Standard practice for making and curing concrete test specimens in the field; covers molds, consolidation, initial curing, and transport.
- 6 x 12 in. cylinder layers
- Fill a 6 x 12 in. cylinder in three equal layers, rodding each layer 25 times with the standard rod.
- 4 x 8 in. cylinder layers
- Fill a 4 x 8 in. cylinder in two equal layers, rodding each layer 25 times with the standard rod.
- Initial curing temperature
- Keep freshly made field specimens at 60 to 80°F (16 to 27°C) and prevent moisture loss for 24 ± 8 h before demolding.
- ASTM C617
- Standard practice for capping cylindrical concrete specimens; caps must be flat, perpendicular to the axis, and sound.
- Compressive strength formula
- Compressive strength equals the maximum test load divided by the cylinder cross-sectional area, reported in psi or MPa.
- ASTM C39
- Standard test method for compressive strength of cylindrical specimens; specifies centering, loading rate, and reporting.
- Capping defect effect
- An uneven, thick, or voided cap can create eccentric loading and lower the measured compressive strength.