Water-cement ratio
Weight of water divided by weight of cement in a mix. Lower ratios increase strength and durability but reduce workability.
Slump test
ASTM C143 test measuring concrete consistency by the vertical drop of a slumped cone. Typical flatwork slump is 3-5 inches.
Air entrainment
Intentional microscopic air bubbles in concrete that provide freeze-thaw resistance. Flatwork typically targets 5-7 percent air.
Cubic yard volume
Concrete volume in cubic yards equals length times width times thickness in feet, divided by 27.
Hydration
Chemical reaction between cement and water that hardens concrete and releases heat. It continues for weeks, reaching design strength near 28 days.
Aggregate proportion
Coarse and fine aggregates make up roughly 60-75 percent of concrete volume; cement paste fills the remaining space.
28-day strength
Standard age at which concrete compressive strength is specified and tested, though strength continues to gain slowly afterward.
Mix ratio notation
A 1:2:3 mix means one part cement, two parts fine aggregate, and three parts coarse aggregate by volume.
Bull float
A long-handled tool used after bleed water disappears to level ridges, embed aggregate, and consolidate the slab surface before floating.
Bleed water
Water that rises to the slab surface after placement. Finishing while it is present causes blistering, delamination, or weak surfaces.
Control joint depth
Control joints should be cut to about one-quarter of slab thickness to create a weakened plane that controls cracking location.
Joint spacing rule
Control joint spacing in feet is typically 24-36 times slab thickness in inches. A 4-inch slab gives roughly 8-12 feet.
Edging
Rounding slab edges with a radius of about one-quarter to one-half inch to resist chipping and improve appearance.
Steel trowel
A finishing tool that densifies and smooths the surface, producing a hard, durable finish. Used after floating, not on bleed water.
Broom finish
A slip-resistant texture created by dragging a dampened broom across the surface, typically perpendicular to traffic direction.
Curing compound
A liquid membrane applied after finishing to slow moisture loss and support hydration. Apply at the manufacturer's specified coverage rate.
Magnesium float
A hand or power tool that opens the concrete surface and removes high spots, preparing it for troweling or texturing.
Evaporation rate risk
Evaporation above about 0.1 lb/ft2/hr sharply raises plastic shrinkage cracking risk. Use windbreaks, fog spray, or evaporation retarder.
Plastic shrinkage cracks
Shallow, parallel cracks that form within hours of placement when surface moisture evaporates faster than bleed water rises.
Drying shrinkage cracks
Longer cracks that appear weeks to months after placement as hardened concrete loses moisture. Control joints manage their location.
Hot-weather limit
Concrete temperature at placement should generally not exceed about 90 F (32 C). Cool aggregates or use ice to control temperature.
Cold-weather protection
Keep concrete at 50 F (10 C) or above until it reaches about 500 psi to prevent freeze damage to early-age concrete.
Retarder
An admixture that slows cement hydration and extends set time, useful in hot weather or for complex placements.
Superplasticizer
A high-range water reducer that increases slump without added water. Slump loss can occur within 30-90 minutes of mixing.
Crazing
A network of fine surface cracks caused by rapid drying of the surface layer. It is usually cosmetic and shallow.
Scaling
Surface flaking of the finished slab, often caused by freeze-thaw cycles, deicing salts, or finishing while bleed water is present.
FF/FL numbers
Floor Flatness (FF) and Floor Levelness (FL) values from ASTM E1155. Higher FF means a flatter floor; FF 50+ suits narrow aisles.
Industrial slab strength
Warehouse and industrial slabs commonly specify 4,000-5,000 psi with low water-cement ratios around 0.40-0.45.
Saw-cut timing
Industrial slabs are typically saw-cut within 6-12 hours of finishing, before random cracking begins, while concrete resists raveling.
Fiber reinforcement
Steel or macro-synthetic fibers added to concrete reduce plastic shrinkage cracking and improve impact and toughness performance.
Laser screed
A machine-guided screed that levels concrete to precise elevations, improving flatness and levelness on large industrial placements.
Shrinkage-compensating concrete
Concrete using expansive cement or additives to offset drying shrinkage, allowing longer joint spacing in industrial floors.