ACI CTCI · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Concrete Construction Inspection

  • Map the concrete construction inspection domain into a personal checklist of pre-placement, placement, and post-placement tasks

  • Define the roles and responsibilities of the inspector, contractor, and testing technician on a typical project

  • Identify the standard inspection documents (placement log, batch ticket review, delivery records) and describe what each must contain

  • Explain why inspection authority and communication lines matter when nonconformance is observed

Your checkpoint

One-page inspection responsibility matrix plus a blank pre-placement checklist you can reuse in later weeks

Week 2

Concrete Construction Inspection

  • Sequence the steps of a pre-placement inspection from formwork and reinforcement verification through final approval to place

  • List the checks performed on forms, shoring, embedded items, and construction joints before concrete arrives

  • Describe how to verify reinforcement size, spacing, cover, and support against the approved drawings

  • Explain what conditions justify withholding approval to place concrete

Your checkpoint

Completed pre-placement inspection checklist scored against a written scenario with at least 15 line items

Week 3

Concrete Construction Inspection & Concrete Field and Laboratory Testing

  • Describe the inspection points during placement: discharge, consolidation, lift thickness, cold joints, and finishing

  • Explain how sampling and specimen handling tie back to inspection observations on the same placement

  • Identify common placement defects visible to the inspector and the corrective action for each

  • Verify batch ticket information against specification requirements during a simulated delivery review

Your checkpoint

Placement observation log covering a simulated pour, including three defects identified with corrective actions

Week 4

Concrete Field and Laboratory Testing

  • Explain the purpose and procedure for slump, air content, and temperature tests

  • Describe correct sampling technique and why sampling location affects test validity

  • Identify specimen molding, curing, and transport requirements for strength cylinders

  • State the acceptance criteria and retest provisions that apply when a field test fails

Your checkpoint

Written field-test procedure summaries for slump, air content, temperature, and cylinder molding, each with acceptance criteria

Week 5

Concrete Field and Laboratory Testing & Concrete Construction Inspection

  • Describe compressive strength test procedures from specimen receipt through reported result

  • Explain how to evaluate strength results against acceptance requirements and when cores or other investigation is triggered

  • Interpret a laboratory report and flag anomalies an inspector should escalate

  • Connect post-placement inspection findings to the testing evidence that supports or contradicts them

Your checkpoint

Annotated sample lab report with at least five inspector comments and one escalation recommendation

Week 6

Concrete Construction Inspection & Concrete Field and Laboratory Testing

  • Integrate inspection and testing into a single timeline for a full placement from pre-pour to acceptance

  • Practice interpreting specification language for inspection frequency, testing frequency, and acceptance

  • Identify documentation gaps that would weaken a project's quality record

  • Explain the inspector's role in nonconformance reporting and follow-up

Your checkpoint

End-to-end placement quality record for a simulated project, from pre-placement checklist through final acceptance decision

Week 7

Concrete Construction Inspection & Concrete Field and Laboratory Testing

  • Review all weak areas flagged in weeks 1 through 6 and close each gap

  • Answer mixed-domain practice questions under timed conditions and categorize every error by domain and cause

  • Rehearse explaining inspection and testing decisions aloud in exam-style terms

  • Confirm memorized acceptance criteria and standard test parameters are accurate

Your checkpoint

Error log of at least 40 practice questions, with each error tagged to a domain and a corrected reference note

Week 8

Concrete Construction Inspection & Concrete Field and Laboratory Testing

  • Take two full-length timed practice exams and score each by domain

  • Re-drill only the topics that produced repeated errors in week 7 and the practice exams

  • Verify final recall of procedures, acceptance criteria, and inspection sequences without notes

  • Build a one-page last-review sheet limited to facts you have confirmed

Your checkpoint

Two scored practice exams plus a final one-page review sheet with a documented pass-readiness judgment

Milestones

Week 2: Can complete a pre-placement inspection checklist from a written scenario with no reference material and justify every withhold-approval decision

Week 4: Can state the procedure and acceptance criteria for slump, air content, temperature, and cylinder molding from memory

Week 6: Can produce a complete placement quality record that links inspection observations to testing evidence and a final acceptance decision

Week 7: Practice-question accuracy is at or above 80 percent overall, with no domain below 70 percent

Week 8: Both full-length practice exams scored at or above 80 percent overall and at or above 75 percent in each domain