ACP-420 · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Project creation, project types, and project-level configuration

  • Distinguish company-managed from team-managed projects and list which configuration elements each type owns

  • Create one project of each major type (software, business, service) and record the default scheme set each receives

  • Map the project-level configuration surface: project details, project category, default assignee, project lead, and notification/email settings

  • Explain how a project template choice constrains later issue type, workflow, and field decisions

Your checkpoint

A one-page comparison matrix covering at least 4 project types with columns for scheme ownership, who can edit configuration, and typical use case, plus 3 self-written practice questions answered from it

Week 2

Workflows, workflow schemes, and transitions

  • Build a workflow from scratch with at least 5 statuses and label each transition as global, directed, or initial

  • Add conditions, validators, and post functions to transitions and state the execution order for each transition

  • Create a workflow scheme and associate it with a project, then verify which issue types map to which workflow

  • Diagnose the effect of editing a shared versus inactive workflow on live issues

Your checkpoint

A working 5-status workflow in a test project plus a written transition table (from status, to status, condition, validator, post functions) and answers to 3 troubleshooting scenarios

Week 3

Permissions, permission schemes, and issue security

  • Explain the permission scheme model and rank the sources of access (permission scheme, issue security, project role, group, application access)

  • Create a custom permission scheme granting access via project roles rather than individual users and apply it to a project

  • Configure an issue security scheme with 3 levels and verify visibility as two different test users

  • Trace a 'user cannot see the issue' complaint through issue security level, permission scheme, and project role membership

Your checkpoint

A permission and issue security design document for a sample project, validated by a two-user visibility test log with at least 6 test cases and observed results

Week 4

Fields, field configuration, and screen schemes & Issue types, schemes, and issue type schemes

  • Create custom fields of 5 different types and place each on the correct screen for the intended operation (create, edit, view)

  • Build a field configuration and field configuration scheme, then demonstrate which fields are required versus optional per issue type

  • Assemble a screen scheme and screen scheme-to-issue-type mapping and verify the create versus edit experience

  • Design an issue type scheme with at least 4 issue types and a sub-task type, and attach it to a project

Your checkpoint

An end-to-end field and screen configuration applied to a test project, documented as a mapping table (issue type → screen scheme → screens → fields with required/optional flags)

Week 5

Agile boards, backlog, and sprint configuration

  • Create a board from an existing filter and explain how the filter's JQL determines board contents

  • Configure board columns and status mapping so each column corresponds to workflow statuses

  • Configure and run a sprint end-to-end: backlog ranking, sprint creation, start, complete, and incomplete-issue handling

  • Adjust estimation statistic and configure at least two swimlane options, then compare their effect on the board view

Your checkpoint

A board configuration record showing filter JQL, column-to-status mapping, swimlane setting, and estimation statistic, plus a completed sprint walkthrough with screenshots-free written steps and 3 configuration pitfalls noted

Week 6

Project roles, groups, and team access management & Dashboards, filters, and reporting for projects

  • Create project roles, populate them with groups rather than individuals, and grant permissions to those roles in a permission scheme

  • Distinguish group membership, project role membership, and application access, and state which one gates which behavior

  • Build a JQL filter, share it with a project role, and use it to drive a dashboard gadget

  • Add 3 dashboard gadgets that report on project progress and set the dashboard sharing scope appropriately

Your checkpoint

A shared filter plus dashboard with 3 working gadgets, accompanied by a role/group access matrix showing exactly which team type can see and edit each artifact

Week 7

Project administration practices and troubleshooting & Project creation, project types, and project-level configuration & Workflows, workflow schemes, and transitions

  • Reproduce and resolve 5 common administration failures (scheme not applied, missing permission, broken transition, wrong screen on edit, board column mismatch)

  • Audit a project's full scheme association list and identify any scheme that is shared when it should be dedicated

  • Re-run practice questions from weeks 1-3 and re-derive the answers for every item missed

  • Document a safe change procedure for editing a live workflow scheme or permission scheme

Your checkpoint

A troubleshooting playbook of 5 symptom → diagnostic steps → fix entries, plus a completed scheme audit of one project with all mismatches corrected

Week 8

Issue types, schemes, and issue type schemes & Fields, field configuration, and screen schemes & Permissions, permission schemes, and issue security & Agile boards, backlog, and sprint configuration

  • Complete two timed full-length practice sets and score each domain separately

  • Rebuild from memory the scheme chain for a project: issue type scheme, workflow scheme, field configuration scheme, screen scheme, permission scheme, notification scheme

  • Drill the two lowest-scoring domains until each reaches a self-set target score

  • Summarize the 10 highest-risk distinctions (shared vs dedicated schemes, role vs group, required vs optional field, global vs directed transition) into a single review sheet

Your checkpoint

A scored practice-exam log for both attempts with per-domain percentages, plus a one-page final review sheet of the 10 riskiest distinctions

Milestones

Week 2: Can build a multi-status workflow with validators and post functions, attach it via a workflow scheme, and explain the transition execution order without notes

Week 4: A test project is fully configured end-to-end (issue types, workflow, fields, screens) and a second user can be granted access purely through project roles

Week 6: A shared filter drives a dashboard visible to the correct role, and the role/group access matrix has no unresolved access gaps

Week 8: Both timed practice sets completed with every domain at or above the self-set target and no domain left unreviewed