Three weeks after completion, a 400 m² mud floor in a workshop shows a 6 m × 4 m area where a chain-drag survey produces a dull, hollow sound. The area corresponds to a section placed late on a hot afternoon. The surface shows no visible cracking, but a 1.5 m straightedge reveals a 6 mm dip at the edge of the affected zone. The floor is specified as a bonded mud floor over a prepared sub-base. Records show the sub-base was dampened before placing, but the area was placed after a 40-minute delay in the delivery and the mix was retempered with water on site. The client wants the area ground flat and sealed.

1. Interpret the hollow sound, the dip, and the placement records to identify the most probable defect and its cause.

Read the worked answer

The evidence points to debonding (delamination) of the floor from the sub-base, likely with a shallow, weak surface layer.

  • Hollow sound over a defined area is the classic sign of a loss of bond between the floor and sub-base, or of a void/soft layer beneath.
  • The 6 mm dip at the zone edge suggests the floor has curled or settled where bond was lost, consistent with differential shrinkage and debonding.
  • Placement history explains it: a 40-minute delay, then retempering with water on a hot afternoon. Retempering adds water to a mix already losing workability, raising the effective w/c ratio, increasing bleeding and shrinkage, and reducing the bond at the interface. Late-afternoon placement into a warming slab accelerates moisture loss.
  • Dampening the sub-base was correct, but if it dried before the delayed placement, or if bleed water accumulated, the bond would be compromised.

Grinding and sealing would only hide the surface; it would not restore bond and would leave a hollow, un bonded area.

2. Specify the investigation needed to confirm the defect and its extent, and recommend a repair method.

Read the worked answer

Investigation:

  1. Tap/chain-drag survey on a grid to map the full extent of hollow areas, not just the obvious zone.
  2. Core samples through the affected and adjacent sound areas to measure floor thickness, inspect the interface, and test bond. Cores also allow strength testing of the floor.
  3. Check the sub-base at core locations for moisture, density, and contamination.
  4. Level survey across the area to quantify the dip and any curling.
  5. Review batching records for the retempered batch and any cube results.

Repair:

  • Remove and replace the debonded area back to sound, bonded floor, cutting square edges and preparing the sub-base (clean, dampen, correct level) before re-placing with a properly batched mix.
  • If the area is large or the defect is widespread, replacement is the only reliable option; grinding and sealing is not acceptable for debonding.
  • After repair, re-survey levels to confirm the dip is corrected and re-test bond by tapping.
  • Record the root cause (retempering and delayed placement) and prohibit retempering in the method statement.

3. The client asks whether the whole floor should be condemned. Advise, with reasoning.

Read the worked answer

Not necessarily. Condemnation should be evidence-based, not assumed from one defective zone.

  • The hollow area is localized and corresponds to a specific batch/placement event (late afternoon, delayed, retempered). Other areas placed under normal conditions may be sound.
  • The chain-drag survey should be extended across the full 400 m² on a grid. If hollow areas are confined to the identified zone, localized replacement is appropriate and proportionate.
  • Core results and bond tests across the floor provide the objective basis: if the majority is bonded and meets strength, the floor is serviceable outside the repair area.
  • Condemnation would be justified only if the survey and cores show widespread debonding or inadequate strength across the floor.

Recommend: complete the survey and coring, repair the confirmed defective zone, and re-test. Document the decision and the basis so the client has a defensible record. Blanket condemnation without evidence wastes the client's money; accepting the floor without investigation risks a failure.