A single-storey rammed earth wall is 3.0 m high and 300 mm thick. A 1.2 m wide x 1.0 m high window is placed with its near edge 0.5 m from an outside corner. The wall carries a light timber roof; there is no ring beam or lintel except a 50 mm timber plate over the opening. Six months after construction, a diagonal crack runs from the upper corner of the opening toward the roof line, and the wall below the sill bulges 6 mm. The soil was unstabilized, PI 12, and construction took place in late summer. The owner wants to patch the crack and paint the wall.

1. Explain the likely structural and material causes, and why patching alone is inadequate.

Read the worked answer

The diagonal crack from the opening corner suggests stress concentration and differential movement, not simple shrinkage. A 0.5 m pier between opening and corner is slender and lightly loaded; the timber plate distributes only locally. Unstabilized PI 12 soil shrinks on drying, and late-summer construction caused rapid moisture loss. The 6 mm bulge below the sill suggests inadequate sill bearing and possible pier rotation or buckling. Patching will re-crack because the movement source remains. Check the roof load path and whether the opening interrupts a continuous bond beam.

2. Detail a repair and upgrade for the opening and corner, including lintel, bond beam, reinforcement, and minimum distances.

Read the worked answer

Repair: remove loose plaster and crack; inject compatible earth or lime mortar; install a reinforced concrete or timber lintel with at least 300 mm bearing each side, connected to a continuous ring beam. Add vertical reinforcement (two 10 mm bars) in the 0.5 m pier and grout, or widen the pier to 0.9 m. Provide a reinforced bond beam at 2.4 m and tie it to the roof. Use lime-stabilized blocks at opening edges. For unstabilized earth, a pier should generally be at least 0.9 m wide or braced; if kept at 0.5 m, require engineered design. Monitor the repair.

3. What inspection and testing would you carry out before repairing?

Read the worked answer

Before repair: expose the footing and check for settlement; use a level and plumb; test wall moisture and density; inspect roof bearing; install a crack monitor for four weeks. Confirm whether the crack is active. If active, fix drainage and roof first. Otherwise the repair will be cosmetic and fail again.