Shower Receptors flashcards
Shower Receptors · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Shower receptor definition
- The waterproof, sloped floor assembly that receives shower discharge, either site-built from mortar and membrane or a prefabricated pan.
- Preslope definition
- The sloped mortar substrate placed beneath the waterproof membrane so water reaching the membrane flows to the drain.
- Weep holes definition
- Openings in the drain flange that let moisture trapped in the mortar bed migrate into the drainage system instead of accumulating.
- ANSI A118.10 membrane
- The consensus standard used to evaluate load-bearing, bonded waterproofing membranes such as sheet and fluid-applied products for shower receptors.
- Code shower floor slope
- Model plumbing codes commonly require shower receptor floors to slope a minimum of one-quarter unit vertical per unit horizontal toward the drain.
- Clamping-ring drain
- A drain with a lower flange on the preslope and an upper ring that clamps the membrane in place, with weep holes kept open.
- Bonding-flange drain
- A tile-in drain whose flange the waterproof membrane bonds to directly with manufacturer-approved adhesive, without a clamping ring.
- Subfloor deflection limit
- The tile assembly method sets a minimum stiffness, often L/360, that the framed floor must meet before receptor and tile work begin.
- Drain height rough-in
- The drain body is set so its flange sits flush with the preslope surface at the drain, letting the required slope terminate cleanly.
- Curb framing requirements
- Solid or built-up lumber secured to the subfloor, with the top sloped toward the drain and no fasteners driven through the membrane's horizontal plane.
- Rough plumbing test
- A hydrostatic or air test of the drain line and trap completed and documented before walls close and the preslope is placed.
- Perimeter blocking purpose
- Stud blocking at the receptor perimeter supports membrane terminations, curb framing, and backer-board edges so the assembly stays rigid.
- Dry-pack preslope mix
- A sand-and-cement mortar, commonly about four to five parts sand to one part cement by volume, placed at the required slope.
- Preslope thickness rule
- Maintain at least about three-quarters of an inch at the drain and increase thickness at the perimeter to hold a uniform slope.
- Prefabricated pan setting
- The pan is bedded in mortar or adhesive per the manufacturer, leveled at the perimeter, and checked to slope toward its factory drain.
- Final mud bed thickness
- The mortar bed above the membrane is typically at least one and one-half inches at the drain and follows the preslope's slope.
- Linear drain leveling
- The channel body must be level, with the grate height matched to the finished tile thickness and slope checked perpendicular to the channel.
- Membrane wall height
- The waterproof membrane extends continuously up the walls a minimum of two inches above the curb, or higher if the manufacturer requires.
- Curb flashing rule
- Membrane laps over the curb and terminates on its outside face, with fastener penetrations permitted only above the finished flood level.
- Sheet membrane seam overlap
- Seams overlap per manufacturer instructions, commonly two inches minimum, embedded in bonding adhesive and rolled to remove air pockets.
- Corner reinforcement
- Inside and outside corners receive pre-formed corner pieces or folded membrane reinforcement per the manufacturer's written instructions.
- Flood test procedure
- Plug the drain, fill to at least one inch above the highest receptor point or to the curb top, mark the level, and hold per specification.
- Wet-area mortar coverage
- Wet-area floor tile requires at least 95 percent mortar contact, achieved with proper trowel notch, back-buttering, and full embedding.
- Movement joint sealant
- Changes of plane and perimeter joints use an ASTM C920 sealant rather than grout, following TCNA movement-joint guidance.
- Drain grate height
- The grate or strainer sits level with or slightly below the surrounding tile, is secured, and remains removable for cleaning.
- Curb top tile slope
- Curb-top tile slopes slightly toward the drain side and is bonded without fasteners that penetrate the waterproofing beneath.
- Pre-membrane inspection
- Before membrane work, verify preslope slope, drain height, blocking, and substrate condition, documenting findings with photos and a checklist.
- Flood test pass criteria
- No water-level drop beyond evaporation allowance and no visible leakage at penetrations or below the membrane constitute a passing membrane test.
- Test record contents
- The flood-test record captures test date, water depth, hold duration, and inspector name for the project's quality documentation.
- Weep hole verification
- After tile and grout, confirm weep holes remain open and water drains freely at the receptor during final inspection.
- Leak source isolation
- Determine whether leakage comes from the membrane, drain flange, weep holes, or plumbing before demolition, using a flood test to confirm.
- Silica dust protection
- Cutting mortar and tile requires wet methods or dust collection plus respiratory protection to limit respirable crystalline silica exposure.