AHERA Inspector flashcards
AHERA Inspector · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- ACBM definition
- Asbestos-containing building material is any material in a school building that contains more than 1 percent asbestos by weight, determined using the prescribed sampling and analysis methods.
- Friable material
- Material that can be crumbled, pulverized, or reduced to powder by hand pressure when dry. Friability drives assessment priority because friable material releases fibers more readily.
- LEA responsibility
- The local education agency must ensure inspections, management plans, and response actions are completed for each school building it owns, leases, or uses for school purposes.
- Reinspection interval
- ACBM must be reinspected by an accredited inspector at least once every three years, with periodic surveillance performed every six months in the interim by a designated person.
- Assumed ACBM rule
- Material that is friable and has not been sampled, or where reliable information is lacking, must be assumed to be ACBM and managed accordingly without further analysis.
- Management plan submission
- Each school building's asbestos management plan must be submitted to the state governor or designee and made available to parents, teachers, and employee organizations.
- Record retention requirement
- Inspection reports, management plans, sampling records, and surveillance documentation must be retained for the life of the school building and made available for review.
- Homogeneous area
- A surfacing material, thermal system insulation, or miscellaneous material that is uniform in color and texture and was applied at approximately the same time.
- AHERA statute
- Title II of the Toxic Substances Control Act establishes the Asbestos Hazard Emergency Response Act, requiring accreditation of asbestos professionals and school management plans.
- NESHAP Subpart M
- 40 CFR Part 61 Subpart M regulates asbestos emissions from demolition and renovation, requiring notification, work practices, and proper handling of regulated asbestos-containing material.
- OSHA PEL
- The permissible exposure limit for asbestos is 0.1 fiber per cubic centimeter as an eight-hour time-weighted average, with a 1.0 f/cc excursion limit over 30 minutes.
- Model Accreditation Plan
- The EPA plan setting minimum training hours and refresher intervals for inspectors, management planners, project designers, abatement supervisors, and workers.
- Inspector training hours
- Initial inspector accreditation requires 24 training hours covering inspection, sampling, assessment, and regulations, with annual refresher training to maintain accreditation.
- RACM definition
- Regulated asbestos-containing material includes friable asbestos material and certain nonfriable material that will be crumbled or pulverized during demolition or renovation activities.
- Category I nonfriable
- Nonfriable asbestos-containing material such as packing, gaskets, and roofing that cannot be crumbled by hand pressure and may become regulated when disturbed.
- Employee notification
- Employers must notify employees who may be exposed to asbestos and provide information about exposure levels, health effects, and protective measures under OSHA standards.
- ASHAA purpose
- The Asbestos School Hazard Abatement Act provided federal financial assistance for abatement of hazardous asbestos conditions in school buildings.
- Walk-through inspection
- A systematic visual survey of all building areas, including concealed spaces and mechanical systems, to identify and document suspect asbestos-containing materials.
- Random bulk sampling
- Samples are collected in a statistically random pattern from each homogeneous area, with minimum sample numbers based on material type and friability.
- PLM analysis
- Polarized Light Microscopy identifies asbestos fibers by optical properties and estimates percentage by weight; point counting resolves results near the 1 percent threshold.
- Significantly damaged
- ACBM that has deteriorated or been disturbed such that it is likely to release fibers, requiring prompt response action such as repair or removal.
- Assessment factors
- Condition, friability, accessibility, potential for disturbance, water damage, and location in an air plenum determine the assessment and priority of ACBM.
- Sample location documentation
- Inspection records must identify each sample's location, the homogeneous area sampled, material description, and laboratory result for traceability.
- Wet sampling methods
- Bulk sampling uses wetting and careful tools to minimize fiber release, and sample points are sealed or repaired after collection to prevent disturbance.
- Inspection report contents
- Reports document homogeneous areas, sample results, material condition, assessment ratings, and locations so the management planner can select response actions.
- O&M program
- An operations and maintenance program manages intact ACBM through work practices, cleaning, training, and notification to prevent fiber release during routine activities.
- Response action options
- Permissible responses include operations and maintenance, repair, enclosure, encapsulation, and removal, selected based on condition, accessibility, and disturbance potential.
- Removal criteria
- Removal is indicated when ACBM is significantly damaged and cannot be repaired, or when renovation or demolition will disturb the material.
- Enclosure vs encapsulation
- Enclosure builds a barrier around ACBM; encapsulation seals the material surface. Both require the material to remain managed as ACBM with periodic surveillance.
- Designated person
- The individual designated by the LEA to ensure management plan implementation, conduct periodic surveillance, and coordinate response actions and recordkeeping.
- Plan update triggers
- Management plans must be updated after response actions, when new ACBM is identified, or when building use changes significantly.
- Periodic surveillance
- Visual checks every six months document the condition of ACBM and whether damage has occurred, triggering reassessment and possible response action.