Question 1AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
Under the Asbestos-Containing Materials in Schools Rule, which local education agency official is responsible for ensuring that the LEA's asbestos activities comply with the rule?
- The school nurse
- The facilities custodian
- The business manager
- The designated person Correct answer.
Explanation
The rule requires each LEA to designate a person to ensure that the LEA's asbestos activities are carried out in compliance with the requirements of 40 CFR Part 763, Subpart E. The designated person is the focal point for implementation and recordkeeping.
Question 2AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
Which document must an LEA prepare to describe how it will manage asbestos-containing building materials in its schools?
- A demolition permit application
- A material safety data sheet file
- An asbestos management plan Correct answer.
- An operations and maintenance contract
Explanation
Subpart E requires each LEA to develop and implement an asbestos management plan for each school building it owns or leases, addressing inspection results, response actions, and O&M activities.
Question 3AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
Which accreditation is required before a person may inspect school buildings for asbestos under Subpart E?
- Certification as a lead abatement worker
- Registration as an industrial hygienist
- Licensure as a professional engineer
- Accreditation as an inspector Correct answer.
Explanation
Inspections must be performed by persons accredited under the Model Accreditation Plan as inspectors. The MAP establishes training and accreditation requirements for asbestos professionals working in schools.
Question 4AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
How often must a reinspection of each school building be conducted under the asbestos-in-schools rule?
- Every year
- Every ten years
- Every five years
- Every three years Correct answer.
Explanation
The rule requires reinspection at least once every three years to determine whether the condition of known or assumed ACBM has changed. The results update the management plan.
Question 5AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
What is the required frequency for periodic surveillance of asbestos-containing building materials in a school?
- Every two years
- Every month
- Every six months Correct answer.
- Every three years
Explanation
Periodic surveillance must be conducted at least once every six months to check the condition of ACBM and any response actions. It is a visual check that supplements the three-year reinspection.
Question 6AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
Which response action involves removing asbestos-containing building materials?
- Encapsulation
- Operations and maintenance
- Abatement Correct answer.
- Repair
Explanation
Abatement includes removal, enclosure, or encapsulation of ACBM; removal is the abatement method that takes the material out of the building. Repair, O&M, and related activities are not abatement.
Question 7AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
When may an LEA use the presumption that materials are asbestos-containing instead of conducting an inspection?
- When the material is located in a nonpublic area
- When the LEA treats the assumed material as ACBM in its management plan Correct answer.
- When the building was constructed after 1980
- When the LEA obtains a waiver from the state
Explanation
The rule permits an LEA to assume that a material is ACBM rather than sample it, provided the assumed material is treated as ACBM throughout the management plan and program.
Question 8AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
Which of the following must be included in an asbestos management plan?
- The district's bus routing schedule
- A copy of the school lunch menu
- A description of response actions planned for each ACBM location Correct answer.
- A list of student immunizations
Explanation
The management plan must describe the inspection results, response actions, O&M activities, and the plan for informing employees and building occupants. Response actions for each location are a core element.
Question 9AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
A maintenance worker who disturbs asbestos-containing floor tile while replacing it in a school must have completed which training?
- No training if the tile is nonfriable
- Hazard communication training only
- Asbestos abatement worker training under the MAP Correct answer.
- A general safety orientation only
Explanation
Disturbance of ACBM during maintenance that is not routine O&M may require accredited abatement worker training. Work practices and training depend on the nature and friability of the material and the scope of disturbance.
Question 10AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
An LEA plans to conduct an inspection of a school built in 1975. Which activity must occur before the inspection begins?
- The LEA must publish the management plan in a newspaper
- The LEA must obtain parental consent for each sample
- The LEA must remove all suspect materials first
- The LEA must ensure the inspector is accredited and follow notification requirements Correct answer.
Explanation
Inspections must be performed by accredited inspectors, and the LEA must follow the rule's requirements for access and notification. Removal before inspection would defeat the purpose of the assessment.
Question 11AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
A school building contains thermal system insulation that was assumed to be ACBM. What must the LEA do with this material in its management plan?
- Sample it and remove it from the plan if negative
- Treat it as ACBM and describe response actions for it Correct answer.
- Replace it within 30 days
- Ignore it because it was not sampled
Explanation
When a material is assumed to be ACBM, the LEA must treat it as ACBM throughout the management plan and program, including describing appropriate response actions.
Question 12AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
Which situation requires the LEA to update its asbestos management plan?
- The school calendar changes
- A reinspection reveals changed conditions in ACBM Correct answer.
- A new principal is hired
- A parent requests a copy of the plan
Explanation
The management plan must be updated when reinspection or surveillance shows changes in ACBM condition or when response actions are performed. Administrative changes unrelated to asbestos do not trigger updates.
Question 13AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
How long must an LEA retain records of the asbestos inspection and management plan?
- For two years after the inspection
- Until the next reinspection
- For one year after the plan is written
- For the life of the building or at least the period the rule specifies Correct answer.
Explanation
The rule requires that inspection records and the management plan be kept for the life of the building, and certain records must be maintained for specified periods. Long-term retention supports ongoing management.
Question 14AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
An LEA wants to use an operations and maintenance program as its response action for friable ACBM in good condition. What must the program include?
- Work practices that prevent disturbance and clean up any debris Correct answer.
- No documentation because O&M is informal
- Enclosure of all ACBM within 90 days
- Immediate removal of all ACBM
Explanation
An O&M program must include work practices, training, and cleaning procedures designed to prevent disturbance of ACBM and to control any release. Documentation is part of a proper O&M program.
Question 15AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
Which of the following best describes friable asbestos-containing material?
- Material that can be crumbled or reduced to powder by hand pressure Correct answer.
- Material that has been encapsulated
- Material that contains less than one percent asbestos
- Material that is always located outdoors
Explanation
Friability describes whether a material can be crumbled, pulverized, or reduced to powder by hand pressure when dry. Friable materials present a greater potential for fiber release.
Question 16AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
A school leases space in a building owned by another party. What is the LEA's responsibility regarding asbestos under Subpart E?
- The LEA has no responsibility because it does not own the building
- The LEA must purchase the building before managing asbestos
- The owner alone bears all responsibility with no LEA involvement
- The LEA must ensure that the leased space is inspected and managed as required for school buildings Correct answer.
Explanation
The rule applies to school buildings leased or owned by an LEA, so the LEA must ensure required inspection and management activities occur for leased space used as a school.
Question 17AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
Which of the following is a required element of the management plan regarding notification?
- A copy of the school's fire drill log
- A list of employee home addresses
- A schedule of parent-teacher conferences
- A description of how employees and building occupants will be informed Correct answer.
Explanation
The management plan must describe the plan for informing employees, students' parents or guardians, and building occupants about asbestos activities and the availability of the plan.
Question 18AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
Which sampling approach is required when an accredited inspector collects bulk samples of suspect material?
- Collect a single sample from one location only
- Collect samples in a manner that ensures representative analysis of the material Correct answer.
- Collect samples only from the building exterior
- Collect samples after the material has been removed
Explanation
Bulk sampling must be representative of the material and follow established protocols so laboratory analysis accurately characterizes the material. Adequate numbers of samples are needed for multi-component materials.
Question 19AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
An LEA's management plan must be available for review by which of the following?
- Only the asbestos contractor
- Only the LEA superintendent
- Only state regulators
- The public, including parents and employees Correct answer.
Explanation
The rule requires the management plan to be available for review by the public, including parents, teachers, and employee organizations, without cost.
Question 20AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
A school building is scheduled for demolition. What asbestos-related obligation applies under the rule before demolition?
- The LEA may proceed without any asbestos evaluation
- The LEA must only notify parents by mail
- The LEA must convert the building to a charter school
- The LEA must ensure an inspection and appropriate abatement or notification occur before demolition Correct answer.
Explanation
Before demolition or renovation, the rule requires that the building be inspected for asbestos and that any ACBM be handled appropriately, coordinating with NESHAP requirements.
Question 21AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
Which of the following activities is considered abatement rather than an operations and maintenance activity?
- Wet mopping a floor
- Replacing a light bulb
- Inspecting a boiler room
- Enclosure of friable ACBM Correct answer.
Explanation
Abatement includes removal, enclosure, and encapsulation of ACBM. Routine cleaning, minor maintenance, and inspections are O&M activities rather than abatement.
Question 22AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
An LEA assumes that all ceiling tiles in a building are ACBM but later has them sampled and found negative. What must the LEA do to its management plan?
- Destroy all records of the assumption
- Update the plan to reflect the sampling results and revise response actions accordingly Correct answer.
- Keep the plan unchanged because assumptions are permanent
- Remove the plan from public access
Explanation
When sampling demonstrates that an assumed material is not ACBM, the management plan should be updated to reflect the new information and adjust response actions. Plans are living documents that reflect current conditions.
Question 23AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
Which party is responsible for ensuring that a contractor performing asbestos work at a school uses accredited personnel?
- The contractor alone, with no LEA role
- The students' parents
- The LEA, through its designated person and contract oversight Correct answer.
- The state health department exclusively
Explanation
The LEA remains responsible for compliance with the rule and must ensure that contractors performing asbestos work use appropriately accredited personnel. Contract oversight is part of the designated person's duties.
Question 24AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
Which of the following statements about the relationship between the Model Accreditation Plan and Subpart E is accurate?
- The MAP applies only to federal buildings
- The MAP replaces the management plan requirement
- Subpart E requires that asbestos professionals working in schools be accredited under the MAP Correct answer.
- The MAP exempts schools from inspection
Explanation
Subpart E incorporates the Model Accreditation Plan to require accreditation for inspectors, management planners, project designers, abatement workers, supervisors, and contractor supervisors working in schools.
Question 25AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
A short-term worker is hired for a summer project that will disturb ACBM. Which statement best reflects the rule's training requirement?
- The worker may rely on the contractor's verbal instructions
- The worker needs training only if the material is friable
- The worker must be trained and accredited for the type of asbestos work performed Correct answer.
- The worker needs no training because the job is temporary
Explanation
Training and accreditation requirements apply based on the work performed, not the duration of employment. Workers disturbing ACBM must be appropriately trained and accredited.
Question 26AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
Under 40 CFR Part 763, Subpart E, which buildings are covered by the Asbestos-Containing Materials in Schools Rule?
- Local education agency school buildings serving students in kindergarten through grade 12 Correct answer.
- All public and private buildings constructed before 1980
- Only buildings owned by the federal government
- Colleges and universities receiving federal funds
Explanation
Subpart E applies to local education agencies and the school buildings they own, lease, or otherwise use that serve students in kindergarten through twelfth grade. It does not reach every pre-1980 building or higher education institutions.
Question 27AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
An accredited inspector is collecting bulk samples of a suspect material. Which condition must be met for the samples to be considered valid under the rule?
- Each sample must be photographed before removal
- Each sample must be analyzed by a laboratory using an approved method Correct answer.
- Each sample must be collected by a licensed electrician
- Each sample must be shipped to the EPA regional office
Explanation
Bulk samples must be analyzed by a laboratory using methods specified in the rule, such as polarized light microscopy, to determine asbestos content. Sampling is performed by accredited inspectors, and analysis follows recognized protocols.
Question 28AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
A school building has been inspected and contains ACBM. By what point must the LEA have a management plan developed?
- By the end of the calendar year in which the inspection occurred
- Before the next school year begins Correct answer.
- Within 30 days of the inspection
- Before the building is first used for school purposes after the inspection
Explanation
The rule requires the LEA to develop a management plan before the start of the school year following the inspection, with implementation phased in as specified. The plan must be in place before the building is used for school purposes.
Question 29AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
Which of the following best describes the role of the designated person under Subpart E?
- A certified industrial hygienist who performs all sampling
- A contractor who performs all abatement work
- An EPA inspector assigned to review the plan
- An LEA official responsible for ensuring the management plan is implemented Correct answer.
Explanation
The LEA must designate a person to ensure that the management plan is implemented and that the LEA's responsibilities under the rule are carried out. This person need not be an industrial hygienist or contractor.
Question 30AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
An LEA's management plan must include which of the following elements?
- A list of all school employees' medical records
- A schedule of all school board meetings
- A description of the location and condition of ACBM Correct answer.
- A budget for future abatement projects
Explanation
The management plan must describe the location, condition, and amount of ACBM and presumed ACBM in the school buildings. Budgets, employee medical records, and board meeting schedules are not required elements.
Question 31AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
Which response action is appropriate for friable ACBM that is in significantly damaged condition and cannot be repaired?
- Operations and maintenance only
- Encapsulation without repair
- Posting a warning sign and deferring action
- Removal Correct answer.
Explanation
Significantly damaged friable ACBM generally requires removal because it cannot be reliably repaired or managed through O&M alone. Encapsulation and O&M are not appropriate for severely damaged material.
Question 32AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
Under Subpart E, what is the significance of the term 'presumed asbestos-containing material'?
- It requires immediate abatement of the material
- It applies only to materials installed after 1980
- It allows an LEA to treat material as ACBM without sampling Correct answer.
- It exempts the material from management plan requirements
Explanation
An LEA may presume that suspect material is ACBM rather than sampling it, and must then manage it as ACBM. Presumed ACBM is treated the same as confirmed ACBM for planning purposes.
Question 33AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
Which of the following is a friable material?
- Vinyl floor tile
- Asbestos-cement siding
- Asphalt roofing shingles
- Spray-applied ceiling texture that crumbles when handled Correct answer.
Explanation
Friability refers to whether material can be crumbled, pulverized, or reduced to powder by hand pressure. Spray-applied texture that crumbles is friable, while tile, siding, and shingles are generally non-friable.
Question 34AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
An LEA leases a building from a private owner and uses it as a school. What is the LEA's obligation regarding asbestos under Subpart E?
- The LEA has no obligation because it does not own the building
- The LEA must treat the leased building like an owned school building for inspection and planning Correct answer.
- The owner alone is responsible, and the LEA need not act
- The LEA must purchase the building before taking any action
Explanation
Subpart E applies to school buildings an LEA leases or otherwise uses, not just those it owns. The LEA must ensure inspection and management obligations are met for leased space used for school purposes.
Question 35AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
Which of the following activities is considered a response action under Subpart E?
- Repairing damaged ACBM Correct answer.
- Notifying parents of the plan's availability
- Conducting a building inspection
- Developing the management plan
Explanation
Response actions include repair, encapsulation, enclosure, removal, and O&M activities that address ACBM. Inspection, plan development, and notification are separate compliance steps.
Question 36AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
An LEA is preparing to conduct an inspection of a school building. Which condition must be satisfied before the inspection begins?
- The inspector must be accredited Correct answer.
- The LEA must obtain EPA approval of the inspection plan
- The building must be at least 20 years old
- The building must be closed to students
Explanation
Inspections must be performed by accredited inspectors, and the rule requires accreditation before sampling or inspection activity. Building closure, EPA pre-approval, and age thresholds are not conditions for inspection.
Question 37AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
Which statement accurately describes the relationship between the Model Accreditation Plan and Subpart E?
- Subpart E prohibits the use of MAP-accredited personnel
- The MAP replaces Subpart E for all school buildings
- The MAP sets training and accreditation requirements that support compliance with Subpart E Correct answer.
- The MAP applies only to federal buildings
Explanation
The Model Accreditation Plan establishes training, examination, and accreditation requirements for asbestos professionals, which Subpart E relies on for inspection and response activities. The two work together rather than one replacing the other.
Question 38AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
A contractor is hired to perform asbestos abatement at a school. Who is responsible for ensuring that the contractor's personnel are properly accredited?
- The contractor alone
- The LEA Correct answer.
- The EPA regional office
- The state health department
Explanation
The LEA is responsible for ensuring that contractors performing asbestos work at its schools use accredited personnel. This responsibility is part of the LEA's overall compliance obligations.
Question 39AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
Which situation requires an LEA to update its asbestos management plan?
- The school calendar changes
- A previously unidentified suspect material is found during renovation Correct answer.
- A new principal is appointed
- The LEA hires a new custodian
Explanation
The plan must be updated when new information about ACBM arises, such as discovery of previously unidentified material or a change in condition. Administrative staffing changes and calendar changes do not trigger updates.
Question 40AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
How long must an LEA retain records related to the asbestos inspection and management plan?
- At least 5 years
- For the life of the building
- At least 10 years Correct answer.
- At least 3 years
Explanation
The rule requires the LEA to retain records such as inspection reports, sampling results, and management plans for at least 10 years. Shorter retention periods do not satisfy the requirement.
Question 41AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
Before a school building is demolished, what must the LEA ensure regarding asbestos?
- All ACBM must be removed before demolition
- The building must be sold to a private party
- The management plan must be archived before demolition
- The building must be inspected for asbestos before demolition Correct answer.
Explanation
The rule requires that the building be inspected for asbestos before demolition so that ACBM can be identified and handled appropriately. Removal is not always required for every material, but inspection is a prerequisite.
Question 42AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
Which of the following must be included in the management plan regarding notification?
- A schedule of all school events
- A list of all contractors who worked in the building
- A description of how the LEA will notify building occupants and parents Correct answer.
- A copy of each employee's training certificate
Explanation
The management plan must describe how the LEA will notify building occupants and parents about the plan and its availability. Employee certificates, contractor lists, and event schedules are not required notification elements.
Question 43AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
A maintenance worker will disturb asbestos-containing floor tile while replacing it. What training must the worker have completed?
- Full abatement worker accreditation
- Awareness training for maintenance and custodial staff Correct answer.
- Inspector accreditation
- No training, because the tile is non-friable
Explanation
Maintenance and custodial staff who may disturb ACBM must complete awareness training covering asbestos hazards and safe work practices. Full abatement accreditation and inspector accreditation exceed this requirement.
Question 44AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
Which of the following is true about the O&M program under Subpart E?
- It is limited to buildings constructed after 1980
- It is a response action for managing ACBM in good condition Correct answer.
- It is required for all ACBM regardless of condition
- It replaces the need for an inspection
Explanation
An O&M program is a response action used to manage ACBM that is in good condition and not significantly damaged. It does not eliminate the need for inspection and is not required for all ACBM.
Question 45AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
A short-term worker is hired for a summer project that will disturb ACBM. Which statement best reflects the rule's training requirements?
- Short-term workers need only sign a waiver
- Short-term workers must complete inspector accreditation
- Short-term workers are exempt from training
- Short-term workers must receive the same awareness training as other maintenance staff Correct answer.
Explanation
The rule does not exempt short-term or temporary workers from training; anyone who may disturb ACBM must receive appropriate awareness training. A waiver or inspector accreditation does not satisfy this requirement.
Question 46AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
Which of the following best describes 'asbestos-containing building material' under Subpart E?
- Only material that is friable
- Any material containing more than 1 percent asbestos Correct answer.
- Only material installed before 1970
- Any material containing any detectable asbestos
Explanation
ACBM is defined as material containing more than 1 percent asbestos by weight, as determined by approved methods. Detectable traces below that threshold do not make the material ACBM.
Question 47AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
An LEA assumes all ceiling tiles in a building are ACBM but later samples them and finds them negative. What must the LEA do?
- Take no action because the assumption was optional
- Continue to treat the tiles as ACBM permanently
- Revise the management plan to reflect the sampling results Correct answer.
- Remove the tiles immediately regardless of condition
Explanation
When sampling shows that previously presumed material is not ACBM, the LEA must update the management plan to reflect the new information. The material no longer needs to be managed as ACBM.
Question 48AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
Which of the following is a responsibility of the LEA under Subpart E?
- Conducting all sampling personally
- Ensuring that inspections and response actions are performed by accredited persons Correct answer.
- Setting the national asbestos threshold
- Approving the Model Accreditation Plan
Explanation
The LEA must ensure that inspections, response actions, and related work are performed by accredited persons. The LEA does not approve the MAP or set national thresholds.
Question 49AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
Which of the following best describes the difference between encapsulation and enclosure as response actions?
- Enclosure removes the material, while encapsulation builds a barrier
- Encapsulation seals the material with a coating, while enclosure builds a barrier around it Correct answer.
- Encapsulation removes the material, while enclosure seals it
- Both actions remove the material from the building
Explanation
Encapsulation applies a sealant to the ACBM surface, while enclosure constructs a physical barrier around the material. Neither action involves removal, which is a separate response action.
Question 50AHERA Regulatory Framework and Asbestos-Containing Materials in Schools Rule (40 CFR Part 763, Subpart E)
An LEA is deciding whether to inspect a school building or presume all suspect materials are ACBM. What is the consequence of choosing the presumption?
- The LEA is exempt from recordkeeping
- The LEA must remove all presumed materials
- The LEA avoids all management plan requirements
- The LEA must manage all presumed materials as ACBM Correct answer.
Explanation
If the LEA presumes suspect materials are ACBM, it must manage them as ACBM in the management plan. Presumption does not eliminate management, removal, or recordkeeping obligations.