AK Boiler Operator flashcards
AK Boiler Operator · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- ASME Section I
- ASME Boiler and Pressure Vessel Code section governing power boilers above 15 psig steam, including design, materials, fabrication, inspection, and stamping requirements.
- ASME Section IV
- Code section for heating boilers limited to 15 psig steam, 160 psig water, and 250°F water temperature; covers construction and safety requirements.
- MAWP
- Maximum allowable working pressure is the highest pressure at which a boiler or pressure vessel may legally operate under its Code design.
- NBIC
- National Board Inspection Code provides rules for repairing and altering boilers and pressure vessels and for qualification of repair organizations and welders.
- Safety valve function
- Automatically relieves pressure when it reaches setpoint, protecting the boiler from overpressure; it must have capacity at least equal to maximum generating capacity.
- Low-water fuel cutoff
- Safety control that shuts off fuel to the burner when boiler water level falls below a safe limit, preventing overheating and pressure-part failure.
- Gauge glass blowdown
- Procedure that opens and closes gauge glass valves to prove water and steam connections are clear and that the indicated water level is accurate.
- Flame safeguard control
- Control that monitors flame scanner signal, proves pilot or main flame, and closes fuel valves and locks out on flame failure.
- Stoichiometric air
- The minimum amount of air needed to completely burn a given quantity of fuel; excess air is supplied above this amount to ensure complete combustion.
- Three T's combustion
- Temperature, turbulence, and time are combustion conditions needed with proper air-fuel ratio to achieve complete burning and low unburned fuel.
- Flash point
- Lowest temperature at which a liquid fuel releases enough vapor to form an ignitable mixture near its surface under specified test conditions.
- Forced draft
- A fan supplies combustion air to the furnace under positive pressure; forced-draft systems must prevent leakage of hot gases into the boiler room.
- Deaerator
- Feedwater heater and venting device that removes dissolved oxygen and carbon dioxide, reducing corrosion pitting in feedwater lines and boiler.
- Ion exchange softening
- Process that replaces calcium and magnesium hardness ions with sodium ions, reducing scale formation; it does not remove dissolved solids.
- Boiler blowdown
- Removal of boiler water from the bottom or surface to control dissolved solids, sludge, and contamination; excessive blowdown wastes heat and water.
- Priming and foaming
- Priming is carryover of boiler water into steam; foaming is unstable foam on the water surface. High solids, alkalinity, or oil can cause both.
- Pre-ignition purge
- Period of forced airflow through furnace and flue before ignition to remove combustible gases, preventing furnace explosion during startup.
- Normal boiler shutdown
- Reduce load and firing, stop fuel, maintain water level, close main steam valve, and allow controlled cooling without rapid temperature change.
- Bottom blowdown timing
- Bottom blowdown is performed at light load with stable water level to remove sludge; blowdown at high firing can cause level instability and thermal stress.
- Emergency shutdown
- Trip fuel and burner, isolate fuel supply, maintain safe water level if possible, and follow site emergency procedures before any restart.
- Hydrostatic test
- Pressure test using water to verify strength and tightness; new construction is commonly tested at 1.5 times maximum allowable working pressure.
- Lockout tagout
- Isolation and tagging of energy sources before maintenance to prevent accidental startup or release of stored energy; verify zero energy before work.
- Non-destructive testing
- Inspection methods such as ultrasonic thickness, dye penetrant, magnetic particle, and radiography that detect defects without destroying the component.
- Safety valve pop test
- Test that verifies a safety valve opens at set pressure and reseats properly; adjustment is limited to qualified personnel with jurisdiction approval.
- Low-water condition
- Unsafe water level that can overheat tubes; fuel must be shut off, and water must not be added to an overheated boiler until it has cooled.
- Water hammer cause
- Sudden condensation or trapped condensate in steam lines causes slug impact; draining lines and warming slowly prevent it.
- Carbon monoxide hazard
- Colorless, odorless gas from incomplete combustion; it can cause poisoning, so fuel-burning areas need ventilation and CO detection.
- Fire triangle
- Fuel, oxygen, and heat are required for combustion; removing any one leg extinguishes or prevents fire.
- Operator license limits
- A boiler operator license authorizes operation only of boilers within the class, size, and pressure limits set by the jurisdiction.
- Boiler operating log
- Record of pressure, temperature, water level, blowdown, tests, and abnormalities used to document operation and support maintenance and inspections.
- Code repair requirement
- Repairs and alterations to boilers must follow ASME and NBIC requirements and be inspected before the boiler returns to service.
- Operator in charge
- Person responsible during a shift for safe water level, combustion, controls, emergency response, and compliance with operating procedures.