Quick reference

Boundary Surveying and Retracement

  • Retracement follows the footsteps of the original surveyor; it does not create new boundaries, only locates existing ones.

  • Order of evidence (federal/AL practice): natural monuments, then artificial monuments, then courses and distances, then area or quantity.

  • A call for an adjoiner (a named owner or deed line) generally controls over a call for distance or area.

  • Senior rights rule: the earlier conveyance of a parcel controls over a later conflicting conveyance from the same grantor.

  • Adverse possession in Alabama requires 10 years under color of title (Code of Ala. §6-5-200 et seq.); 20 years without color of title.

  • Water boundary: mean high-water mark is the boundary for tidal waters; ordinary high-water mark for non-tidal navigable streams (varies by state; check AL).

  • Proportionment: excess/deficiency is distributed pro rata among the courses of a line when monuments at the ends control.

  • Bearing basis must be stated on the plat; record bearings are typically referenced to a stated monument or grid north.

Quick reference

Subdivision Platting and Lot Layout

  • Alabama plat must be approved by the governing body (county commission or municipality) and recorded in the probate office before lots can be conveyed.

  • Minimum lot area, width, frontage, and setback are set by local zoning; the plat must conform to the zoning ordinance.

  • Street right-of-way dedication is shown on the plat; fee title typically passes upon recording and acceptance.

  • Plat must show north arrow, scale, vicinity map, owner's certificate, surveyor's certificate, and dedications/notes.

  • Curve data for each lot line: show R, Δ, L, chord bearing and distance, and arc length.

  • Lot corners are set with monuments (typically 5/8-in rebar with cap or as specified by local standards).

  • Cul-de-sac and corner-lot geometry must satisfy access and frontage requirements; flag lots require special approval.

  • Outlots, common areas, and drainage easements are delineated as separate parcels on the plat.

Quick reference

Easements, Rights-of-Way, and Encumbrances

  • An easement appurtenant benefits a dominant parcel and burdens a servient parcel; it runs with the land.

  • An easement in gross benefits a person or entity rather than a parcel (e.g., utility easement).

  • Prescriptive easement in Alabama requires use that is open, notorious, adverse, continuous, and exclusive for the statutory period (20 years generally).

  • An easement by necessity arises when a parcel is landlocked; it terminates when the necessity ends.

  • A right-of-way is an easement for passage; the underlying fee remains with the servient owner unless dedicated in fee.

  • Encroachments (fences, structures) are located by survey and documented; they may create prescriptive rights if not addressed.

  • Easement width is measured perpendicular to the centerline unless the document specifies otherwise.

  • Termination of easement: merger, abandonment, release, or expiration of purpose.

Quick reference

Control Surveying and Geodetic Surveying

  • NAD83 (2011) is the current horizontal datum for Alabama; NAVD88 is the vertical datum.

  • SPCS Alabama zones: East (0101), West (0102); scale factor = grid distance / ground distance.

  • Combined factor = grid scale factor × elevation factor; elevation factor ≈ R/(R+h) where R is earth radius.

  • State plane coordinates are in meters or US survey feet; note the unit on the plat.

  • OPUS/static GPS requires occupation times and baseline processing; report in the appropriate realization (e.g., NAD83(2011)2010.00).

  • Leveling: differential leveling loop closure tolerance is typically expressed as C√M (mm) where M is distance in km.

  • Control points must be tied to at least two published NGS or state control monuments for horizontal and vertical.

  • Geoid model (GEOID18) converts ellipsoid heights to orthometric heights for NAVD88.

Quick reference

Topographic Surveying and Mapping

  • Contour interval is chosen by scale and terrain; typical 1 ft for 1"=50' or larger, 2-5 ft for smaller scales.

  • Index contours are every fifth contour and are labeled with elevation.

  • Spot elevations supplement contours at flat areas, drainage structures, and critical features.

  • Horizontal accuracy standard for mapping is typically 1/30 inch at map scale (ASPRS Class 1).

  • Vertical accuracy for contours: one-half contour interval (ASPRS Class 1).

  • Breaklines define ridges, swales, and pavement edges; TIN surfaces honor breaklines.

  • Planimetric features include buildings, roads, utilities, fences, and vegetation limits.

  • Benchmark elevations on the survey should reference NAVD88 and be tied to a published monument.

Quick reference

Construction Surveying

  • Horizontal alignment: station = distance along centerline; PC, PI, PT, and PCC/PRC for compound/reverse curves.

  • Curve formulas: T = R tan(Δ/2); L = RΔ(π/180); LC = 2R sin(Δ/2); M = R(1−cos(Δ/2)); E = R(sec(Δ/2)−1).

  • Vertical curve: elevation = PVC elev + g1·x + ((g2−g1)/(2L))·x²; high/low point where dy/dx = 0 → x = −g1·L/(g2−g1).

  • Cut/fill = existing ground elevation − design elevation; positive = fill, negative = cut (or as project convention).

  • Slope staking: horizontal offset = slope ratio × vertical difference; batter boards and hubs set to grade.

  • As-built surveys compare constructed features to design; tolerances per project specifications.

  • Grade stakes show cut/fill and reference to a hub; laser/GNSS grading uses machine control tied to site control.

  • Temporary benchmarks and control must be protected and re-verified periodically during construction.

Quick reference

Measurement and Computations

  • Traverse closure: linear error = √(Σdep² + Σlat²); relative precision = closure / perimeter.

  • Latitude = distance × cos(bearing); Departure = distance × sin(bearing).

  • Coordinate inverse: bearing = atan2(ΔE, ΔN); distance = √(ΔE² + ΔN²).

  • Area by coordinates (shoelace): 2A = Σ(Xi·Yi+1 − Xi+1·Yi); take absolute value and divide by 2.

  • Triangle area: A = ½ab·sin(C); Heron's formula for three sides.

  • Curve: chord bearing = tangent bearing ± Δ/2; deflection angle per station = Δ/2 per half-station.

  • Error of closure in angles: sum of interior angles = (n−2)·180°; distribute misclosure equally.

  • 1 acre = 43,560 ft²; 1 mile = 5,280 ft; 1 rod = 16.5 ft; 1 chain = 66 ft.

Quick reference

Legal Principles and Professional Ethics

  • A surveyor's duty is to the public and to the standards of practice; seal and signature certify the work.

  • Conflict of interest: disclose any financial interest in the property being surveyed.

  • Surveyors may not practice law; they report facts and let courts or attorneys resolve boundary disputes.

  • Boundary surveys should be performed under a written contract defining scope, standards, and deliverables.

  • Confidentiality of client information is required except where disclosure is compelled by law or court order.

  • Negligence in boundary location can lead to liability; errors and omissions insurance is standard.

  • Statements of fact on plats (monuments found/set, acreage, bearings) must be accurate and supported by field evidence.

  • Professional courtesy: notify adjoining surveyors when retracing their work and record discrepancies.

Quick reference

Alabama Statutes and Board Regulations

  • Alabama Board of Licensure for Professional Engineers and Land Surveyors regulates licensure; continuing education required (typically 15 PDH per renewal cycle; verify current rule).

  • Land surveyor licensure: education, experience (typically 4 years progressive), and passage of the NCEES FS and PS exams plus Alabama law exam.

  • Surveyor's seal: must include name, license number, and the words 'Professional Land Surveyor' or 'Land Surveyor'.

  • Plats must be signed and sealed by the licensed land surveyor responsible for the work and recorded in the probate office.

  • Alabama requires a written contract for surveying services and disclosure of the surveyor's license status.

  • Unlicensed practice or use of title 'land surveyor' is prohibited and subject to Board discipline.

  • Alabama Code Title 34, Chapter 11 governs engineers and land surveyors; Board rules are in Ala. Admin. Code Chapter 330-X.

  • Corner recordation: Alabama allows recording of corner records/monument records with the probate office for boundary evidence.