AMPP CCI-1 study materials
AMPP CCI-1 study resources

AMPP CCI-1 case studies

AMPP CCI-1 · Put your knowledge to work in context.

The AMPP Certified Coatings Inspector Level 1 (CCI-1) is an entry-level credential in the coatings inspection family offered by AMPP, the Association for Materials Protection and Performance. AMPP describes itself as the largest global community for corrosion and coatings expertise, safeguarding assets through education, credentialing, accreditation, innovation and standardization, and its certification programs cover coating inspection alongside cathodic protection, protective coatings and corrosion prevention. The AMPP CCI-1 case studies are 5 cases and about 2,921 words.

1

Salt Contamination on a Bridge Recoat Over Solvent-Borne Inorganic Zinc

A 1970s steel girder bridge is being recoated. The existing system is a solvent-borne inorganic zinc primer that is largely intact on the webs but has 15-20% rust-through on the bottom flanges and around rivets.

569 words, about 3 min
2

Anchor Profile and Coating Selection on a New Shop-Fabricated Tank

A shop fabricator is blasting and priming new carbon steel tank shell plates for an internal lining. The lining is a 100% solids epoxy, 20-25 mils DFT, for immersion service in a mildly acidic (pH 4-5) process water.

605 words, about 3 min
3

Wet Film, DFT, and Holiday Detection on a Pipeline Coating

A field-applied fusion-bonded-epoxy-equivalent liquid pipeline coating (two-component epoxy, 12-18 mils DFT) is being applied to 24-inch pipe in a laydown yard. The applicator sprays, and the inspector checks wet film thickness (WFT) with a comb gauge, reading 14-16 mils on the top of the pipe and 8-10 mils on the bottom.

587 words, about 3 min
4

Interpreting a Conflict Between Specification and Product Data Sheet

A project specification for a wastewater clarifier interior states: 'Surface preparation shall be SSPC-SP 6/NACE No. Primer: zinc-rich, 3-5 mils DFT.

575 words, about 3 min
5

Confined Space, Ventilation, and Solvent Exposure During Tank Lining

A crew is applying a solvent-borne epoxy lining inside a 12-foot-diameter, 20-foot-tall steel tank through a single 18-inch manway. The product contains xylene and MIBK; the data sheet lists a flash point of 80°F and requires 10 air changes per hour during application and cure.

585 words, about 3 min