APCAT · Keep the key ideas within reach.

Quick reference

Foundations and Core Concepts

  • PDCA (Plan-Do-Check-Act) is the underlying structure of most management-system standards: establish objectives, implement, verify against the objectives, then improve and re-baseline.

  • A logic chain runs inputs → activities → outputs → outcomes → impact; outputs are direct deliverables, outcomes are changes in the target population, impact is the long-term contribution.

  • Evidence hierarchy: systematic reviews and randomised designs generally outrank observational studies, which outrank expert opinion and anecdote.

  • Competence is demonstrated ability against a defined standard; capability is the broader capacity to adapt. Assessing competence always requires an explicit criterion and evidence.

  • Define terms once in a glossary and use them identically throughout; in formal documents 'shall' denotes a requirement, 'should' a recommendation, and 'may' a permission.

  • Every profession separates three artifacts: a body of knowledge (what is known), a standard of practice (what must be done), and a code of conduct (how one must behave).

  • Systems-thinking rule: an intervention in one element of a system produces effects elsewhere, so secondary and delayed effects must be predicted before acting.

Quick reference

Assessment and Analysis

  • Validity means measuring the right construct; reliability means measuring it consistently. High reliability does not imply validity, and validity sets the ceiling on usefulness of any measure.

  • Qualitative methods answer 'why' and 'how'; quantitative methods answer 'how many' and 'how much'. Mixed-methods designs use each to check the other's blind spots.

  • Root-cause tools: 5 Whys for a linear causal chain, fishbone/Ishikawa for a categorised cause inventory (people, process, equipment, environment, management), FMEA to rank failure modes by severity × occurrence × detection.

  • Gap analysis compares current state with desired state; the gap statement must name the metric, the current value, the target value, and the evidence source for each.

  • Probability sampling (random, systematic, stratified, cluster) supports inference to the population; non-probability sampling (convenience, purposive, snowball) does not.

  • Margin of error shrinks with the square root of sample size, so quadrupling the sample roughly halves the error, all else equal.

  • Triangulate across at least two independent sources, methods, or reviewers before treating a finding as established.

  • Baseline data must be captured before the intervention; retrospectively reconstructed baselines are weaker evidence of change.

Quick reference

Planning and Design

  • SMART objectives are specific, measurable, achievable, relevant, and time-bound; an objective without a measure cannot be evaluated later.

  • The scope statement fixes what is in and out of scope; unmanaged scope creep is a leading cause of schedule and cost overrun.

  • WBS decomposition rule: each work package should be estimable, assignable to a single owner, and completable within one reporting period (commonly 8–80 hours).

  • The critical path is the longest sequence of dependent tasks; float = latest start minus earliest start, and zero float identifies the critical path.

  • In a RACI chart exactly one person is Accountable per activity; multiple Responsible parties are allowed but each needs a defined boundary.

  • Risk score = likelihood × impact; response options are avoid, reduce, transfer, accept, plus exploit, enhance, and share for opportunities.

  • Each design criterion must trace to a requirement or stakeholder need, and each requirement needs a named verification method: test, analysis, inspection, or demonstration.

  • Resource levelling trades schedule for stable resource use; resource smoothing holds the end date fixed and only reallocates work within available float.

Quick reference

Implementation and Execution

  • Scope, schedule, and cost baselines are approved before execution; all variance is measured against them and every change routes through change control rather than informal adjustment.

  • Variance formulas: cost variance = earned value − actual cost; schedule variance = earned value − planned value; negative values indicate adverse performance.

  • Quality assurance is process-focused and preventive; quality control is product-focused and detective. Both are required and neither substitutes for the other.

  • Change control decision rule: assess impact on scope, schedule, cost, risk, and compliance before approval, then record the decision and update the affected baseline.

  • Milestones are zero-duration checkpoints with defined acceptance criteria; a milestone counts as met only when the criteria are evidenced.

  • Contingency reserves cover identified and assessed risks; management reserves cover unidentified risks and normally require sponsor approval to release.

  • Document control requires a unique identifier, version, date, author, approver, and change history for every controlled document.

  • Handover of a deliverable requires documented acceptance against stated criteria, not verbal sign-off.

Quick reference

Safety, Standards, and Compliance

  • Hierarchy of controls, most to least effective: elimination, substitution, engineering controls, administrative controls, then personal protective equipment. PPE is the last line, never the first.

  • Risk = likelihood × severity; residual risk is assessed after controls are applied and the result must be recorded alongside the original assessment.

  • Nonconformity sequence: contain the effect, correct the defect, investigate the root cause, implement corrective action, then verify effectiveness.

  • A regulation is legally binding and enforced by an authority; a standard is a voluntary consensus document that binds only when adopted by contract or regulation; guidance is non-binding advice.

  • An audit systematically examines a management system against criteria using sampling and documented evidence; an inspection directly examines a specific item, location, or activity.

  • Management-system standards share a common structure: scope, normative references, terms, context of the organisation, leadership, planning, support, operation, performance evaluation, improvement.

  • Records must be legible, traceable, retrievable, and retained for the defined period; the retention obligation rests on the organisation holding them.

  • Incident-reporting thresholds should be set on actual or potential severity, not solely on whether harm actually occurred.

Quick reference

Ethics and Professional Responsibility

  • Informed consent requires four elements: capacity to decide, disclosure of purpose, risks, benefits and alternatives, voluntariness, and documented agreement.

  • Conflicts of interest are disclosed and managed; where management is insufficient to protect the decision, the professional recuses from it.

  • Common confidentiality exceptions are legal compulsion, imminent risk of serious harm, and authorised oversight; each exception exercised should be documented.

  • Practise only within demonstrated competence; where a matter exceeds it, obtain supervision, consult, or refer onward rather than proceeding alone.

  • Data minimisation: collect only what the stated purpose requires, retain only as long as needed, and restrict access to those who need it to do the work.

  • Record integrity rule: never alter or delete an original entry; corrections are added as a dated, attributed, additive note that preserves the original.

  • Ethical decision test: is the action lawful, is it consistent with the applicable code, would it survive disclosure to those affected, and are affected parties' interests represented?

Quick reference

Communication and Stakeholder Engagement

  • Stakeholder grid: high power/high interest → manage closely; high power/low interest → keep satisfied; low power/high interest → keep informed; low power/low interest → monitor.

  • A communication plan specifies, per audience, the message, format, channel, frequency, owner, and feedback mechanism.

  • Tailor content and channel to audience technical literacy; the same facts need different framing for executives, practitioners, and the public.

  • Close the loop: every significant message needs confirmation of receipt and understanding, not merely transmission.

  • Escalation triggers are defined in advance by threshold (cost, time, risk, safety) rather than by in-the-moment judgement.

  • Minutes should record decisions, actions, owners, and due dates; verbatim transcripts of discussion are not the record of value.

  • Feedback should be designed as two-way: schedule review points with affected stakeholders instead of only broadcasting updates.

Quick reference

Evaluation, Monitoring, and Improvement

  • A KPI needs a specific definition, a data source, a target, and a review cycle; without a target it is monitoring data, not a performance indicator.

  • Leading indicators predict future results (training completion, defect rate at intake); lagging indicators confirm results already realised (incident rate, satisfaction score).

  • Formative evaluation runs during delivery to adjust the work; summative evaluation runs at the end to judge overall merit and worth.

  • Control-chart rule of thumb: a point beyond a control limit, or a run of seven consecutive points on one side of the mean, signals a non-random cause.

  • Benchmarking is valid only when definitions and measurement methods match between the organisation and the comparison reference.

  • Improvement cycle: measure baseline → identify gap and causes → select intervention → implement → re-measure → standardise if effective, or iterate if not.

  • ROI = (benefit − cost) ÷ cost, expressed as a percentage; always state the time period and whether benefits are monetised or estimated.

  • Lessons learned must be captured at defined checkpoints during the work, because at closure participants have dispersed and recall is degraded.