Adding a Second Relief Valve to a Fire-Case-Limited Separator
A 6 ft ID horizontal separator has a MAWP of 300 psig at 250 °F and a single PSV set at 300 psig with a certified capacity of 6,000 lb/h at 10% overpressure. After a debottleneck, the controlling relief case is now external fire at 9,000 lb/h. There is no room for a larger single valve, so the plant proposes adding a second, identical PSV. The jurisdiction has adopted the fire-case accumulation allowance of 121% of MAWP. Design temperature and material are not limiting. The existing valve's last bench test, 3 years ago, recorded a pop at 291 psig against the 300 psig set point, and it was returned to service without further action.
1. What set pressure may the second valve carry, and what is the highest pressure the vessel may see in the fire case?
Read the worked answer
Set pressures (multiple-device rule):
- One device must be set at or below MAWP: the existing valve at 300 psig satisfies this.
- Additional devices may be set no higher than 105% of MAWP = 315 psig. So the second valve may be set anywhere at or below 315 psig; setting it at 300 psig (identical to the first) is also acceptable and simplifies sparing.
Maximum pressure in the fire case: with jurisdiction acceptance of the fire allowance, 121% of MAWP = 363 psig. That is the pressure at which the capacity must be evaluated and the pressure the vessel is permitted to experience in that scenario only.
Important distinction: the 315 psig set point on the second valve is above the vessel MAWP. That is allowed only because it is a supplementary device under the multiple-device rule. It does not raise the MAWP, it does not license 315 psig in any non-fire scenario, and the 116%/121% accumulations do not apply to ordinary process upsets, where 110% is the ceiling for a single device. Do not let the second valve's set pressure be mistaken for a new MAWP.
2. The second valve is identical, rated 6,000 lb/h at 10% overpressure. Is the two-valve installation adequate for the 9,000 lb/h fire load?
Read the worked answer
Not established by the numbers given - and the naive comparison (6,000 + 6,000 = 12,000 > 9,000) is the wrong method.
Capacity must be evaluated at the actual relieving pressure each device sees, not at its nameplate rating point.
- In the fire case the vessel relieves at 363 psig (121% of 300).
- Valve 1, set at 300 psig, is at 21% overpressure at that pressure.
- Valve 2, set at 315 psig, is at about 16% overpressure (363/315 ≈ 1.15).
- Both are above their certified 10%-overpressure rating, so both flow more than 6,000 lb/h - but capacity rises much less than linearly with overpressure, so neither is anywhere near 12,000 lb/h.
Required work: obtain the manufacturer's certified capacity curves and read each valve's capacity at 363 psig (i.e., at its own overpressure percentage). Sum those, compare to 9,000 lb/h with an appropriate margin, and document the calculation. If the sum does not cover the fire load, options are: a larger second valve, a pilot-operated or balanced-bellows valve with higher certified capacity, a rupture disk upstream of a valve, or reducing the fire-case load (drainage, insulation, fireproofing, isolation).
Also verify the discharge system and the inlet line losses at the combined flow - a two-valve installation doubles the flow into a header that may have been sized for one.
Correct answer structure: set pressures are compliant; capacity adequacy is unresolved pending certified data at 363 psig. Never certify a relief installation from nameplate ratings alone.
3. What does the 3-year-old bench test result tell you, and what should the test interval be?
Read the worked answer
The test result itself is a pass, barely. ASME set pressure tolerance for pressures above 70 psig is ±3%: 300 ± 9 psig = 291 to 309 psig. A pop at 291 psig sits exactly on the lower limit. It qualifies, but it is not a comfortable result, and 'returned to service without further action' is the weak part of the record.
What should have happened / should happen now:
- Trend it. One reading at the limit is a data point; two in a row is a developing problem (seat damage, spring relaxation, galling, process fouling on the disc).
- Inspect the seat and disc on the next shop visit regardless of the pop result, and check for simmering damage from a valve that opens early.
- Confirm the valve actually saw the fire case last time and that the 6,000 lb/h rating is still the right basis.
Interval: PRD inspection and testing intervals are set per API 576 based on service history, with API 510 setting the outer bound; a common ceiling is 5 years for general service, extensible only with documented service experience or a risk-based basis accepted by the inspector and jurisdiction. Given (a) a pop at the tolerance limit, (b) an increased fire-case duty, and (c) no evidence the valve has been opened since, shorten rather than extend - 2 to 3 years, and no longer than 5 - and re-baseline after a clean bench test with a mid-tolerance result. Record the basis for the interval, not just the date.