- API 510 scope
- Covers in-service pressure vessels, including inspection, examination, testing, rating, repair, alteration, and rerating, together with the pressure-relieving devices that protect those vessels.
- Authorized inspector
- An individual holding a valid API 510 certification who performs or supervises required inspections, determines intervals, and concurs with repairs, alterations, and relief device results.
- Owner/user responsibility
- The owner/user establishes and maintains the inspection program, designates authorized inspectors, approves repairs and alterations, and retains vessel records for the life of the vessel.
- ASME R-stamp
- A Certificate of Authorization held by a repair organization; it is normally required to perform code-stamped repairs and alterations on pressure vessels unless the owner/user qualifies another organization.
- API 579-1/ASME FFS-1
- The fitness-for-service standard referenced by API 510, used to evaluate whether components with corrosion, cracks, or other flaws can continue in service at defined operating conditions.
- Construction records
- Manufacturer's data report, drawings, material certifications, and heat-treatment records that the inspector reviews to establish design conditions, allowable stress, and minimum thickness.
- On-stream inspection
- Inspection performed while the vessel is operating, using external examinations and monitoring; it may replace internal inspection when the damage mechanisms are understood and corrosion behavior is confirmed.
- Internal inspection
- A documented examination of the vessel interior, usually by visual and nondestructive methods, performed periodically to detect corrosion, cracking, and other service damage.
- Minimum thickness tmin
- The thickness calculated with the construction code's design formulas at the original design conditions, taking the corrosion allowance as zero; measured values below it require action.
- Corrosion rate formula
- Corrosion rate equals metal loss, calculated as previous thickness minus current thickness, divided by the elapsed time in years between the two sets of readings.
- Hydrostatic test pressure
- For pressure vessels, the hydrostatic test is normally conducted at 1.3 times the MAWP, corrected for the metal temperature at test time, using water as the test medium.
- Pneumatic test
- Used only where hydrostatic testing is impractical; typically 1.1 times MAWP per the construction code, with enhanced exclusion zones and safety precautions because of stored energy.
- External inspection
- Visual examination of insulation, supports, foundations, nozzles, and accessible shell surfaces from outside the vessel, performed at intervals not exceeding five years.
- Remaining life formula
- Remaining life equals current measured thickness minus minimum required thickness, divided by the corrosion rate expressed in the same units per year.
- Long-term corrosion rate
- Metal loss from the initial or baseline thickness to the current reading, divided by total years in service; used to project long-term future metal loss.
- Short-term corrosion rate
- Metal loss between the last two thickness surveys divided by the interval between them; it reflects recent operating conditions and process changes.
- Maximum inspection interval
- For internal or on-stream inspection, the lesser of one-half the calculated remaining life or ten years, unless a risk-based inspection program establishes the interval.
- Governing corrosion rate
- When long-term and short-term rates differ, remaining life is calculated using both, and the shorter result governs the inspection interval until the cause is resolved.
- Short remaining life
- A calculated remaining life of only a few years indicates the vessel is approaching retirement, so inspection intervals shorten and repair, rerating, or replacement must be planned.
- Risk-based inspection
- Inspection planning per API 580 and 581 that sets intervals from the probability and consequence of failure rather than from the half-life rule alone.
- Thickness measurement locations
- Pre-established points on a vessel where ultrasonic readings are taken each survey so that results are comparable and corrosion rates can be calculated reliably.
- PRV set pressure
- The inlet pressure at which a pressure relief valve begins to open under service conditions; it may not exceed the vessel's maximum allowable working pressure.
- Relief device test interval
- The owner/user sets the interval, and API 510 limits it to a maximum of five years unless a documented basis, such as risk-based inspection, supports otherwise.
- Set pressure tolerance
- Bench test acceptance criterion: plus or minus three percent of set pressure above 70 psig, and plus or minus 2 psi at or below 70 psig.
- Seat tightness test
- A test performed after set-pressure adjustment, per API 527, confirming that leakage past the seat stays within the allowable bubble or flow limits for the device.
- Block valve under PRV
- Where permitted, inlet and outlet block valves must be locked or car-sealed open and full port, and their pressure drop included in relief capacity calculations.
- Rupture disc
- A non-reclosing pressure relief device; its burst rating and installation must be verified, and it is replaced at intervals established by the owner/user.
- Repair definition
- Work necessary to restore a pressure vessel to a condition suitable for safe operation at its existing design conditions, without changing any design parameters.
- Alteration definition
- A physical change with design implications, such as a change in MAWP, design temperature, material, pressure-retaining capability, or service that affects the rating.
- Rerating
- Changing a vessel's maximum allowable working pressure or design temperature; it requires engineering calculations, inspector concurrence, revised records, and new marking or nameplate.
- Weld procedure qualification
- Repair welds must follow a WPS qualified by procedure qualification testing under ASME Section IX, and welders must hold current performance qualifications.
- PWHT alternative
- Where postweld heat treatment is impractical, the engineer may approve alternatives such as controlled-deposition welding, verified by hardness testing and nondestructive examination.
- Post-repair pressure test
- Major repairs and alterations normally require a hydrostatic test at 1.3 times MAWP after completion, unless the inspector and engineer waive it based on the work performed.