AOSB Aptitude flashcards
AOSB Aptitude · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Valid vs sound argument
- An argument is valid when the conclusion must follow from the premises; it is sound only when it is valid and all its premises are actually true.
- Necessary condition
- A condition that must hold for the claim to be true; without it the claim fails, but it may not be enough on its own.
- Sufficient condition
- A condition whose presence guarantees the claim is true, though the claim might also be true through other routes.
- Quantifier scope
- The range a word like all, most, some or none covers; 'most' means more than half but not all, and scope changes what follows.
- Assumption in arguments
- An unstated premise the argument needs for its conclusion to follow; negating it should break the reasoning.
- Falsifiability
- A claim is falsifiable when some possible observation could show it to be false; unfalsifiable claims cannot be tested against evidence.
- Successive percentage change
- Percentage changes multiply rather than add: a 10% rise then a 10% fall gives 1.10 × 0.90 = 0.99, a net 1% loss.
- Average speed two equal distances
- When equal distances are covered at speeds a and b, average speed is 2ab/(a+b), the harmonic mean, not the arithmetic mean.
- Combined work rate
- Rates add: if A alone takes a days and B alone takes b days, working together they finish in ab/(a+b) days.
- Compound interest formula
- Amount after n periods is P(1 + r)^n, where P is the principal and r the interest rate per period as a decimal.
- Ratio sharing rule
- To split a total in a given ratio, divide the total by the sum of the ratio parts, then multiply by each part.
- Independent event probability
- For independent events the probability both occur is the product of their individual probabilities; for mutually exclusive events it is the sum.
- Percentage change formula
- Percentage change equals (new value − old value) divided by old value, multiplied by 100; the denominator is always the original.
- Rotation versus reflection
- Rotation is rigid and preserves orientation; reflection reverses orientation, so a reflected shape cannot be rotated back into the original.
- Alternating sequence rule
- In a series where odd and even positions follow different patterns, analyse the two interleaved subsequences separately before combining.
- Cube net opposite faces
- On a cube net, faces separated by exactly one face in a straight line are opposite; opposite faces never share an edge.
- Regions cut by lines
- With n straight lines in general position, no two parallel and no three concurrent, the maximum number of regions is n(n+1)/2 + 1.
- Mirror image properties
- A mirror image swaps left and right while preserving top and bottom order; a 180-degree rotation swaps both axes instead.
- Counting attributes rule
- Common abstract-series rules count sides, vertices, enclosed regions, intersections or line segments, often changing by a constant step.
- Critical path
- The longest chain of dependent tasks through a project network; its length sets the minimum possible project duration.
- Float in scheduling
- Total float is latest start minus earliest start; a task with zero float lies on the critical path and any delay slips the project.
- Binding constraint
- The step with least capacity that limits overall throughput; improving any non-bottleneck step does not raise total output.
- Three-point estimate
- Expected duration equals (optimistic + 4 × most likely + pessimistic) divided by 6, weighting the likely case most heavily.
- Resource levelling
- Rescheduling tasks within their float to smooth peaks in demand for people or equipment, usually at the cost of a longer duration.
- Urgency versus importance
- Prioritise tasks by both urgency, how soon due, and importance, impact on objectives; blocking tasks outrank isolated ones.
- Backward planning
- Start from the deadline and work back through task durations to test whether the plan is achievable before committing resources.
- Leaderless group scoring
- Assessors score contribution to the team outcome, including drawing out others and summarising agreement, not dominance or airtime.
- Explicit role allocation
- Assigning timekeeper, scribe and presenter early prevents duplicated effort and ensures the group covers all required outputs.
- Testing agreement aloud
- Summarising the emerging consensus and asking whether anyone objects converts discussion into a recorded decision the group can act on.
- Command task sequence
- Confirm the brief, plan briefly, brief the team on roles, then supervise progress and adjust when conditions change.
- STAR answer structure
- Situation, Task, Action, Result: describe context, your responsibility, what you specifically did, and the concrete outcome.
- Weakness answer pattern
- Name a genuine weakness, then state the specific corrective action taken and the observable improvement, avoiding disguised strengths.