ASE B2 Painting & Refinishing study plan
ASE B2 Painting & Refinishing · Give each week a clear focus.
8 weeks · About 6 hours per week
Surface Preparation
Define each surface-preparation term (substrate identification, featheredging, sanding scratches, adhesion promotion) in your own words
List the grit sequence used to featheredge a repaired panel and explain why each step follows the last
Identify the prep steps that must precede priming versus those that must precede topcoat
Explain how surface contamination (wax, silicone, oil) affects adhesion and how each is removed
Your checkpoint
A one-page prep checklist covering bare metal, plastic, and previously painted panels, with grit sequence and cleaning order
Surface Preparation
Distinguish the prep requirements for steel, aluminum, plastic, and e-coat substrates
Describe how to prep flexible plastic parts so the coating flexes without cracking
Outline the steps to prep a blend panel so the transition is invisible after topcoat
Explain the consequences of skipping a prep step on adhesion, corrosion, and finish quality
Your checkpoint
A substrate-by-substrate prep table with required steps and common failure modes for each
Paint Mixing and Color Matching
Explain how mixing ratio, pot life, and induction time interact for a given product
Describe the effect of reducer choice and temperature on viscosity and flow-out
Identify the three dimensions of color (hue, value, chroma) and how each is adjusted
Explain why spray-out cards are used to verify a color match before painting the vehicle
Your checkpoint
A mixing and color-matching reference sheet with ratio math examples and a spray-out verification procedure
Paint Mixing and Color Matching & Refinishing Applications and Procedures
Calculate the correct amount of each component for a given mix volume
Describe how to tint a color that is slightly off and how to verify the correction
Sequence the steps of a refinish job from prep through final buffing
Explain how flash time, recoat window, and film build affect the outcome of a multi-stage application
Your checkpoint
A completed mix-calculation worksheet plus a written refinish sequence for a two-stage repair
Refinishing Applications and Procedures
Describe how to set up a blend within a panel and across adjacent panels
Explain how to apply a clearcoat so film build is even and the texture matches the surrounding finish
Identify the causes of runs, sags, and mottling during application and how to prevent each
Explain how to apply a spot repair and when a panel repair is the better choice
Your checkpoint
A step-by-step blend and clearcoat procedure with a list of checkpoints to verify during application
Spray Gun Operation and Maintenance
Identify the major spray gun components and the function of each
Explain how fluid tip size, air pressure, and fluid adjustment affect atomization and pattern shape
Describe a routine cleaning and lubrication procedure for a spray gun
Diagnose common gun faults (spitting, uneven pattern, pulsation) and state the likely cause of each
Your checkpoint
A spray gun setup and maintenance checklist with a fault-to-cause troubleshooting table
Spray Booth Operation and Maintenance
Explain how airflow, temperature, and humidity inside a booth affect finish quality
Describe the filter types in a booth and how to tell when each needs replacement
Outline a daily booth inspection routine covering airflow, cleanliness, and lighting
Explain how booth conditions influence flash time and defect formation
Your checkpoint
A booth daily inspection and filter-change log with pass/fail criteria for each check
Paint Defects, Causes, and Corrections & Refinishing Applications and Procedures
Classify common defects (orange peel, solvent pop, runs, blistering, fish eyes, dieback) by their causes
Match each defect to a corrective action and a preventive change in process
Review the full refinish workflow and identify where each defect most likely originates
Explain how surface prep, mixing, gun setup, and booth conditions each contribute to defects
Your checkpoint
A defect-cause-correction matrix covering at least eight defects, citing the responsible process step for each
Milestones
Week 2: Score at least 80% on a self-made 20-question surface-preparation quiz without notes
Week 4: Complete a full mix calculation and refinish sequence with no errors on ratio math or step order
Week 6: Explain spray gun setup and troubleshooting from memory in under five minutes
Week 8: Complete the defect matrix and a timed 50-question mixed-domain practice set at 80% or better