- Post-FIRM construction
- A structure built after the effective date of a community's initial Flood Insurance Rate Map, or after December 31, 1974, whichever is later, and therefore rated actuarially rather than subsidized.
- Substantial improvement threshold
- Rehabilitation, addition, or reconstruction costing 50 percent or more of a structure's pre-improvement market value, excluding land, which then requires full compliance with new-construction standards.
- Substantial damage
- Damage from any cause where the cost to restore the structure to its pre-damage condition equals or exceeds 50 percent of its pre-damage market value, excluding land.
- Emergency Program limits
- Maximum NFIP coverage of $35,000 building and $10,000 contents for residential structures, and $100,000 building and $100,000 contents for nonresidential structures in Emergency Program communities.
- Regular Program maximum coverage
- Maximum NFIP coverage of $250,000 building and $100,000 contents for residential structures, and $500,000 building and $500,000 contents for nonresidential structures in Regular Program communities.
- Section 60.3 ordinance minimums
- The federal floodplain management standards a community must adopt and enforce to remain eligible for NFIP flood insurance; stricter state or local standards are permitted.
- Special Flood Hazard Area
- Land covered by the base flood, the 1 percent annual chance flood, shown on Flood Insurance Rate Maps as zones A, AE, AO, AH, A99, AR, V, and VE.
- Base Flood Elevation
- The water surface elevation of the 1 percent annual chance flood, published in the Flood Insurance Study and used as the regulatory elevation standard in numbered A and V zones.
- Regulatory floodway
- The channel and adjacent land that must remain free of encroachment because any obstruction would raise base flood elevations by more than one foot.
- Zone AO
- A shallow flooding area subject to sheet flow one to three feet deep, where the base flood elevation is expressed as a depth number rather than an elevation in feet.
- Shaded Zone X
- The area of moderate flood hazard subject to the 0.2 percent annual chance, or 500-year, flood, lying outside the Special Flood Hazard Area.
- Letter of Map Amendment
- A FEMA determination that an existing structure or parcel is not in the Special Flood Hazard Area because of ground elevation; no fill is placed and the map is not physically revised.
- Lowest floor
- The lowest enclosed area of a building, including basement, but excluding enclosures used only for parking, storage, or access that have compliant flood openings.
- Flood opening requirement
- At least two openings on different walls, total net area of one square inch per square foot of enclosed area, with the bottom of each opening within one foot of grade.
- V zone lowest horizontal member
- In coastal high hazard areas, the lowest horizontal structural member of the lowest floor must be at or above the base flood elevation and free of obstruction.
- Dry floodproofing certification
- Nonresidential structures may be made watertight to the base flood elevation if a registered engineer or architect certifies the design and a flood warning plan exists.
- Elevation Certificate
- A FEMA form recording as-built elevations of the lowest floor and mechanical equipment, used to verify ordinance compliance and to determine flood insurance premiums.
- Breakaway wall
- A wall below the base flood elevation in a V zone designed to collapse under flood loads without damaging the elevated structure; the enclosed space is limited to parking, storage, and access.
- Flood-damage-resistant materials
- Materials installed below the base flood elevation that resist water damage, classified under FEMA Technical Bulletin 2, where Class 5 materials are considered unacceptable.
- Thirty-day waiting period
- Flood insurance coverage generally takes effect 30 days after purchase, with exceptions such as lender-required coverage at loan closing and certain flood map revisions.
- Increased Cost of Compliance
- Up to $30,000 of building coverage that helps pay to bring a substantially damaged or repetitively flooded structure into compliance with the local floodplain ordinance.
- Risk Rating 2.0
- FEMA's premium methodology that prices each policy using flood frequency, distance to water, elevation, and replacement cost instead of map zone and subsidy categories.
- Community Rating System class
- A community's score from 1 to 10; each class better than 10 earns a 5 percent premium discount, so Class 1 gives 45 percent and Class 10 gives none.
- Write Your Own insurer
- A private insurance company that sells and services NFIP policies under its own name while FEMA retains the underlying flood risk and sets the policy terms.
- Proof of Loss
- A sworn statement from the policyholder documenting the amount claimed, generally due within 60 days of the flood loss unless FEMA extends the deadline.
- No Adverse Impact
- The ASFPM principle that a community's actions and permitted development must not increase flood heights, velocities, erosion, or damages to other property owners or communities.
- Benefit-cost ratio
- The ratio of a mitigation project's avoided future flood damages to its total cost; FEMA grants generally require a ratio of 1.0 or greater to be cost-effective.
- Repetitive loss property
- An insured property that has received two or more separate flood insurance claim payments of $1,000 or more each within any ten-year period.
- Severe repetitive loss property
- A property with four or more flood claims of $5,000 or more, or two or more claims cumulatively exceeding $20,000, triggering mandatory mitigation offers from FEMA.
- Hazard mitigation plan
- A FEMA-approved state, local, or tribal plan identifying risks and mitigation actions, updated at least every five years as a condition of most mitigation grant funding.
- HMGP funding formula
- The Hazard Mitigation Grant Program provides up to 15 percent of total disaster assistance, rising to 20 percent for states with a FEMA-approved enhanced mitigation plan.
- No-rise certification
- An engineering certification that a proposed encroachment in a regulatory floodway will not increase base flood elevations, required before the development permit may be issued.