- Pareto Principle
- Roughly 80 percent of problems stem from about 20 percent of causes, so improvement effort should target the vital few contributors displayed on a Pareto chart.
- Cost of Poor Quality
- Sum of internal and external failure costs such as scrap, rework, warranty, and returns; it excludes prevention and appraisal, which are conformance costs.
- PDCA Cycle
- Plan-Do-Check-Act: plan a change, run it, check results against the objective, then standardize the gain or act on what was learned.
- Fishbone Diagram
- Cause-and-effect diagram branching into categories such as man, machine, material, method, measurement, and environment to organize possible causes of one defined problem.
- Five Whys
- Root cause technique that repeatedly asks why a problem occurred, typically five times, until the underlying systemic cause rather than a symptom is identified.
- Check Sheet
- Structured form for tallying the frequency or location of events while data are collected, making patterns visible before charting or analysis begins.
- Scatter Diagram
- Plot of paired values for two variables; the pattern shows direction and strength of association but does not by itself prove causation.
- Process Capability Index Cpk
- Cpk equals the smaller of (USL minus mean) or (mean minus LSL), divided by three sigma; it measures capability while accounting for process centering.
- Cp Ratio
- Cp equals specification width (USL minus LSL) divided by six sigma; it expresses potential capability assuming the process is centered between the specification limits.
- X-bar and R Chart
- Paired control charts plotting subgroup averages and ranges; control limits are built with constants such as A2, D3, and D4 that depend on subgroup size.
- p Chart
- Control chart for the proportion of nonconforming units in a sample; used with attribute data when sample size may vary from subgroup to subgroup.
- Central Limit Theorem
- The distribution of sample means approaches normal as sample size grows, with standard deviation equal to the population sigma divided by the square root of n.
- Producer's Risk
- Alpha risk: the probability that a lot of acceptable quality is rejected by a sampling plan; it is commonly set at 0.05.
- Standard Deviation
- Square root of the average squared deviation from the mean; for a sample, the sum of squared deviations is divided by n minus one.
- AQL
- Acceptable quality level, the quality level a sampling plan is designed to accept most of the time; combined with lot size it selects the plan.
- Tightened Inspection
- Sampling switch triggered after two of five consecutive lots are rejected on original inspection; smaller acceptance numbers are used to protect the consumer.
- Critical Defect
- A defect judged likely to create a hazard or unsafe condition for the user; usually requires zero acceptance and full screening or testing.
- First Article Inspection
- Verification of the first production unit against all drawing and specification requirements before full production is authorized, documenting dimensions, materials, and processes.
- 100 Percent Inspection
- Every unit is inspected or tested; suitable for critical characteristics or small lots but still subject to inspector error and fatigue.
- Liquid Penetrant Testing
- Nondestructive method that draws penetrant out of surface-breaking discontinuities in nonporous materials, revealing cracks and porosity as visible indications.
- Measurement Traceability
- Unbroken documented chain of calibrations linking an instrument's readings to national or international standards, with each comparison carrying a stated uncertainty.
- Gage R&R
- Study estimating measurement variation from equipment repeatability and appraiser reproducibility; percent GRR under 10 is acceptable and over 30 is unacceptable.
- Accuracy versus Precision
- Accuracy is closeness of a measurement to the true value; precision is closeness of repeated measurements to each other regardless of the true value.
- Calibration
- Comparison of an instrument's indication against a reference standard of known value with documented results; adjustment is a separate step performed only when needed.
- Measurement Uncertainty
- Non-negative parameter describing the dispersion of values attributed to a measurand; Type A comes from statistics, Type B from other information, combined by root-sum-squares.
- Gauge Resolution
- Smallest change in a quantity that an instrument can display or discriminate; it should be roughly one-tenth of the tolerance being measured.
- Third-Party Audit
- Independent external audit performed by a certification body to verify that an organization's quality management system conforms to a standard such as ISO 9001.
- Corrective Action
- Action taken to eliminate the cause of a detected nonconformity so it does not recur; distinguished from correction, which only fixes the existing problem.
- ISO 9001:2015
- International standard specifying requirements for a quality management system; it applies risk-based thinking and PDCA and requires no specific quality manual.
- Quality Record
- Document stating results achieved or providing evidence of activities performed; records are retained for defined periods and are not revised like controlled procedures.
- Second-Party Audit
- Audit performed by a customer or its representative on a supplier to verify that contractual and quality system requirements are being met.
- Management Review
- Top management's planned evaluation of the quality management system's suitability, adequacy, and effectiveness, using defined inputs and producing decisions on improvement and resources.