ASSE 5140 study materials
ASSE 5140 study resources

ASSE 5140 study plan

ASSE 5140 · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Backflow Prevention and Cross-Connection Control & Plumbing and Mechanical Code Fundamentals

  • Map every backflow prevention term (air gap, RPZ, PVB, DCVA, AVB) to its definition and permitted application from memory on a blank sheet

  • Trace the cross-connection control logic of a reduced-pressure principle assembly step by step, labeling each check and relief component and its failure mode

  • Build a one-page comparison table contrasting the five backflow assembly types by degree of hazard, orientation, and where each may be installed

  • Identify the code-fundamentals provisions that govern cross-connection control and cite the section intent in your own words

Your checkpoint

A hand-drawn labeled diagram of an RPZ assembly plus a completed five-row backflow assembly comparison table, both produced without notes

Week 2

Backflow Prevention and Cross-Connection Control & Water Supply and Distribution Systems

  • Explain the difference between backsiphonage and backpressure and construct one realistic field scenario for each

  • Outline the annual testing procedure for a testable backflow assembly, listing the sequence of gauge connections and the pass/fail criteria for each check

  • Describe the components of a potable water distribution system from service line through meter, main, riser, and fixture branch

  • Calculate required pipe sizing inputs for a simple residential layout using fixture-unit values and developed length

Your checkpoint

A written testing checklist for a double check and an RPZ assembly, plus a worked fixture-unit sizing calculation for a two-bath dwelling

Week 3

Water Supply and Distribution Systems & Plumbing and Mechanical Code Fundamentals

  • Differentiate pressure-driven supply design constraints: static versus residual pressure, friction loss, and minimum fixture pressure requirements

  • Interpret how water heater, expansion control, and thermal expansion protection interact with the supply side of a system

  • Compare the code treatment of potable water pipe materials, joints, and supports against the mechanical code's parallel requirements

  • Solve three practice problems converting fixture units to demand and selecting a meter size

Your checkpoint

A solutions sheet with three fully worked supply-sizing problems showing fixture units, demand, developed length, and final pipe and meter selections

Week 4

Drainage, Waste, and Vent Systems & Plumbing and Mechanical Code Fundamentals

  • Diagram a full drainage stack with fixture branches, a vent stack, and a stack vent, labeling every fitting and its function

  • Distinguish between trap arm, fixture drain, soil stack, waste stack, and building drain and state the slope requirement for each horizontal run

  • Explain the purpose and placement rules for each vent type: individual, common, wet, circuit, and island fixture venting

  • Relate the drainage and vent provisions to the broader mechanical code's trap seal protection intent

Your checkpoint

A complete isometric drainage and vent sketch for a single-bath layout with every pipe labeled by type, size, and slope

Week 5

Drainage, Waste, and Vent Systems & Fixtures, Fixture Fittings, and Water Heaters

  • Apply trap seal protection principles to explain why venting failures cause gurgling, sewer gas, and slow drains

  • Compare the installation requirements for water closets, lavatories, sinks, and floor drains, including fixture spacing and clearance

  • Describe water heater types, relief valve placement, discharge piping, and combustion air requirements for fuel-fired units

  • Diagnose five written drainage/vent or fixture scenarios and state the code violation and the corrective action for each

Your checkpoint

A five-scenario diagnostic log listing each violation, the governing requirement, and the corrective action in a table

Week 6

Inspection, Testing, and Plan Review Procedures & Backflow Prevention and Cross-Connection Control

  • Walk through a plan review checklist in order: scope, fixtures, supply, drainage, venting, and backflow protection

  • Describe the inspection sequence from rough-in to final and list what a cross-connection inspector verifies at each stage

  • Explain how to document a backflow test result, including gauge calibration records and reporting to the water authority

  • Identify the most common plan review rejection reasons and how to preempt them

Your checkpoint

A one-page plan review checklist and a sample completed backflow test report with all required fields populated

Week 7

Safety, Administration, and Code Enforcement & Inspection, Testing, and Plan Review Procedures

  • Outline the enforcement workflow from violation notice through re-inspection, including escalation and appeals

  • Explain the inspector's authority, liability boundaries, and ethical obligations during enforcement actions

  • Describe confined space, lockout, and PPE hazards encountered during plumbing and backflow inspections

  • Draft a violation notice for a scenario with an unprotected cross-connection, citing the requirement and the correction deadline

Your checkpoint

A drafted violation notice and re-inspection schedule for one cross-connection scenario, plus a one-page safety hazard list for field inspections

Week 8

Backflow Prevention and Cross-Connection Control & Plumbing and Mechanical Code Fundamentals & Water Supply and Distribution Systems & Drainage, Waste, and Vent Systems & Fixtures, Fixture Fittings, and Water Heaters & Inspection, Testing, and Plan Review Procedures & Safety, Administration, and Code Enforcement

  • Assemble a single-page formula and definition sheet covering fixture units, slope, trap seal depth, and pressure limits

  • Complete two timed full-length practice exams and score each by domain to find weak areas

  • Re-study the two lowest-scoring domains using your own notes and diagrams only

  • Recite the backflow assembly types, their hazard ratings, and testing intervals from memory without reference

Your checkpoint

A scored practice exam summary with per-domain percentages and a written remediation plan for any domain below 75 percent

Milestones

Week 2: Can sketch and label an RPZ and a double check assembly from memory and state the pass/fail test criteria for each without notes

Week 4: Can draw a complete drainage and vent isometric for a single-bath layout with correct slopes and vent types, scoring at least 80 percent on a self-graded rubric

Week 6: Can complete a plan review checklist and backflow test report with no missing required fields, verified against a reference checklist

Week 8: Scores at least 75 percent overall and at least 70 percent in every domain on two timed practice exams