ASSE 5140 study plan
ASSE 5140 · Give each week a clear focus.
8 weeks · About 7 hours per week
Backflow Prevention and Cross-Connection Control & Plumbing and Mechanical Code Fundamentals
Map every backflow prevention term (air gap, RPZ, PVB, DCVA, AVB) to its definition and permitted application from memory on a blank sheet
Trace the cross-connection control logic of a reduced-pressure principle assembly step by step, labeling each check and relief component and its failure mode
Build a one-page comparison table contrasting the five backflow assembly types by degree of hazard, orientation, and where each may be installed
Identify the code-fundamentals provisions that govern cross-connection control and cite the section intent in your own words
Your checkpoint
A hand-drawn labeled diagram of an RPZ assembly plus a completed five-row backflow assembly comparison table, both produced without notes
Backflow Prevention and Cross-Connection Control & Water Supply and Distribution Systems
Explain the difference between backsiphonage and backpressure and construct one realistic field scenario for each
Outline the annual testing procedure for a testable backflow assembly, listing the sequence of gauge connections and the pass/fail criteria for each check
Describe the components of a potable water distribution system from service line through meter, main, riser, and fixture branch
Calculate required pipe sizing inputs for a simple residential layout using fixture-unit values and developed length
Your checkpoint
A written testing checklist for a double check and an RPZ assembly, plus a worked fixture-unit sizing calculation for a two-bath dwelling
Water Supply and Distribution Systems & Plumbing and Mechanical Code Fundamentals
Differentiate pressure-driven supply design constraints: static versus residual pressure, friction loss, and minimum fixture pressure requirements
Interpret how water heater, expansion control, and thermal expansion protection interact with the supply side of a system
Compare the code treatment of potable water pipe materials, joints, and supports against the mechanical code's parallel requirements
Solve three practice problems converting fixture units to demand and selecting a meter size
Your checkpoint
A solutions sheet with three fully worked supply-sizing problems showing fixture units, demand, developed length, and final pipe and meter selections
Drainage, Waste, and Vent Systems & Plumbing and Mechanical Code Fundamentals
Diagram a full drainage stack with fixture branches, a vent stack, and a stack vent, labeling every fitting and its function
Distinguish between trap arm, fixture drain, soil stack, waste stack, and building drain and state the slope requirement for each horizontal run
Explain the purpose and placement rules for each vent type: individual, common, wet, circuit, and island fixture venting
Relate the drainage and vent provisions to the broader mechanical code's trap seal protection intent
Your checkpoint
A complete isometric drainage and vent sketch for a single-bath layout with every pipe labeled by type, size, and slope
Drainage, Waste, and Vent Systems & Fixtures, Fixture Fittings, and Water Heaters
Apply trap seal protection principles to explain why venting failures cause gurgling, sewer gas, and slow drains
Compare the installation requirements for water closets, lavatories, sinks, and floor drains, including fixture spacing and clearance
Describe water heater types, relief valve placement, discharge piping, and combustion air requirements for fuel-fired units
Diagnose five written drainage/vent or fixture scenarios and state the code violation and the corrective action for each
Your checkpoint
A five-scenario diagnostic log listing each violation, the governing requirement, and the corrective action in a table
Inspection, Testing, and Plan Review Procedures & Backflow Prevention and Cross-Connection Control
Walk through a plan review checklist in order: scope, fixtures, supply, drainage, venting, and backflow protection
Describe the inspection sequence from rough-in to final and list what a cross-connection inspector verifies at each stage
Explain how to document a backflow test result, including gauge calibration records and reporting to the water authority
Identify the most common plan review rejection reasons and how to preempt them
Your checkpoint
A one-page plan review checklist and a sample completed backflow test report with all required fields populated
Safety, Administration, and Code Enforcement & Inspection, Testing, and Plan Review Procedures
Outline the enforcement workflow from violation notice through re-inspection, including escalation and appeals
Explain the inspector's authority, liability boundaries, and ethical obligations during enforcement actions
Describe confined space, lockout, and PPE hazards encountered during plumbing and backflow inspections
Draft a violation notice for a scenario with an unprotected cross-connection, citing the requirement and the correction deadline
Your checkpoint
A drafted violation notice and re-inspection schedule for one cross-connection scenario, plus a one-page safety hazard list for field inspections
Backflow Prevention and Cross-Connection Control & Plumbing and Mechanical Code Fundamentals & Water Supply and Distribution Systems & Drainage, Waste, and Vent Systems & Fixtures, Fixture Fittings, and Water Heaters & Inspection, Testing, and Plan Review Procedures & Safety, Administration, and Code Enforcement
Assemble a single-page formula and definition sheet covering fixture units, slope, trap seal depth, and pressure limits
Complete two timed full-length practice exams and score each by domain to find weak areas
Re-study the two lowest-scoring domains using your own notes and diagrams only
Recite the backflow assembly types, their hazard ratings, and testing intervals from memory without reference
Your checkpoint
A scored practice exam summary with per-domain percentages and a written remediation plan for any domain below 75 percent
Milestones
Week 2: Can sketch and label an RPZ and a double check assembly from memory and state the pass/fail test criteria for each without notes
Week 4: Can draw a complete drainage and vent isometric for a single-bath layout with correct slopes and vent types, scoring at least 80 percent on a self-graded rubric
Week 6: Can complete a plan review checklist and backflow test report with no missing required fields, verified against a reference checklist
Week 8: Scores at least 75 percent overall and at least 70 percent in every domain on two timed practice exams