- 0.2 % offset yield strength
- Stress at which the plastic strain reaches 0.2 percent of the gauge length, determined from the tensile test per DIN EN ISO 6892-1, used for steels without a distinct yield point.
- Carbon equivalent CEV
- Formula CEV = C + Mn/6 + (Cr+Mo+V)/5 + (Cu+Ni)/15 estimating weldability. Values above roughly 0.45 indicate cold-cracking risk and require preheating and controlled cooling.
- Jominy end-quench test
- Standard hardenability test in which a heated cylindrical specimen is quenched by a water jet at one end; hardness measured along the length shows how deeply the steel hardens.
- Heat input in welding
- Energy per unit length Q = k · U · I / v, with k about 0.8 to 0.9 for MAG welding. It controls cooling time, hardness and toughness of the heat-affected zone.
- ISO 286 fit system
- Tolerance system with hole-basis or shaft-basis fits. Letter gives the fundamental deviation, the number the IT grade; H/h are the basic holes and shafts.
- Surface roughness Ra and Rz
- Ra is the arithmetic mean roughness value of the profile, Rz the mean peak-to-valley height of five single measurements. Ra is roughly Rz divided by four to six.
- Cutting speed formula
- vc = π · d · n / 1000 in m/min with diameter d in millimetres and speed n in revolutions per minute; rearranged it gives the required spindle speed.
- Hooke's law in engineering
- In the elastic range stress equals modulus times strain, σ = E · ε. Young's modulus is about 210 GPa for steel and about 70 GPa for aluminium alloys.
- Thermal expansion calculation
- Length change Δl = l0 · α · ΔT. Steel expands about 11 to 13 · 10⁻⁶ per kelvin, aluminium about 23 · 10⁻⁶, which explains distortion during welding.
- First-angle projection
- Drawing arrangement used in Europe per ISO 128: the view seen from the left is placed on the right of the front view, and the top view is placed below.
- Fully constrained CAD sketch
- A sketch whose geometry is fixed by dimensions and geometric constraints so that no degrees of freedom remain; changes then propagate predictably through the parametric model.
- Machine-hour rate
- Cost per machine hour, calculated from depreciation, space, energy, maintenance, imputed interest and wages divided by the planned annual machine hours of that workstation.
- Break-even quantity
- Number of units at which revenue equals total cost, calculated as fixed costs divided by the contribution margin per unit, which is price minus variable cost per unit.
- Linear depreciation
- Annual depreciation equals acquisition cost minus residual value, divided by useful life. It spreads the loss in value evenly over the years of use of the asset.
- Contribution margin ratio
- Contribution margin per unit divided by selling price, expressed as a percentage. It shows how much of each euro of revenue remains to cover fixed costs.
- Discount cost calculation
- Skipping a discount has an annualised cost: discount rate divided by 100 minus discount rate, multiplied by 360 divided by the difference between payment and discount periods.
- Werkvertrag under German law
- Contract for work and services under the BGB in which the contractor owes a specific result; warranty for works and buildings is two years, for buildings five years.
- Handwerksordnung Annex A
- List of craft trades for which entry in the Handwerksrolle requires a master craftsperson qualification or an equivalent recognised qualification; metalworking trades such as metalworker belong here.
- Working time breaks
- German Working Time Act: 30 minutes break after more than six hours, 45 minutes after more than nine hours; at least 11 hours rest between shifts.
- Product liability period
- Under the German Product Liability Act the manufacturer is strictly liable for defective products for ten years after placing the product on the market; development risks are excluded.
- Four-step training method
- Instruction sequence: prepare and motivate, demonstrate and explain, let the trainee imitate and practise with correction, then consolidate through independent practice and transfer.
- Operational training plan
- Company plan derived from the framework training plan, allocating the required skills, contents and time slots of the apprenticeship to departments and training years.
- Bloom's taxonomy levels
- Ordered cognitive levels from remember, understand, apply, analyse and evaluate to create, used to formulate learning objectives and to design examination tasks of increasing difficulty.
- Training record duty
- Apprentices must keep a written or electronic record of their training; the trainer checks it regularly, and it serves as evidence of the training content covered.
- STOP principle
- Order of safety measures: substitution, then technical, then organisational, then personal protective measures. Personal protective equipment is the last barrier, never the first choice.
- Noise action levels
- At 80 dB(A) the employer must provide hearing protection and information; at 85 dB(A) hearing protection must be worn and audiometric testing is required.
- Five safety rules electrical
- Disconnect, secure against reconnection, verify absence of voltage, earth and short-circuit, and cover or bar adjacent live parts before working on electrical equipment.
- Fire class D
- Fire class for burning metals such as magnesium, sodium or aluminium powder. It requires special dry powder extinguishing agents; water and carbon dioxide are dangerous here.
- Waste hierarchy
- Order of waste handling under the German Circular Economy Act: avoidance first, then reuse, then recycling, then other recovery such as energy, and disposal only as the last option.
- Coolant monitoring
- Water-mixed metalworking fluids must be checked regularly for concentration, pH value, microbial contamination and nitrite; disposal requires separating oil from water.
- Compressed air leakage cost
- A small leak of about three millimetres at six bar wastes several thousand kilowatt-hours per year, so leak detection and pressure reduction are primary efficiency measures.
- Critical path in projects
- The longest chain of dependent activities that determines the minimum project duration; any delay on this path delays the whole project unless measures are taken.
- Cost performance index
- Earned value divided by actual cost. A value below one shows that the project has spent more than the work performed is worth, indicating a cost overrun.
- Risk matrix
- Tool ranking risks by multiplying probability of occurrence and impact of damage; high-scoring risks need prioritised measures with a named owner and a review date.
- Acceptance protocol
- Document recording measurable acceptance criteria, test results, deviations found and their correction, signed by client and contractor to close the project formally.