ARCtick Licence study materials
ARCtick Licence study resources

ARCtick Licence flashcards

ARCtick Licence · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Refrigerant handling licence
A personal licence authorising the named individual to perform specified refrigerant handling work such as recovery, charging, and decommissioning within the scope granted.
Scope of licence
The defined set of tasks and refrigerant types a licence holder is authorised to work on; work outside this scope is not covered by the licence.
Venting prohibition
A rule that refrigerant must not be deliberately released to atmosphere; it must be recovered into suitable containers before a circuit is opened.
Recovery cylinder rules
Recovery cylinders must be refrigerant-rated, correctly labelled, not overfilled, and used for only one refrigerant type to avoid mixing.
Decommissioning record
A record stating the quantity of refrigerant recovered from a system, the equipment or site involved, and the destination of the recovered refrigerant.
Continuing competency
The requirement that a licence holder maintains and demonstrates current skills, often through refresher training or reassessment, to keep the licence valid.
Leak testing duty
An obligation to check refrigerant circuits for leaks using appropriate methods before charging and during servicing, and to repair identified leaks.
Evacuation before charging
The procedure of removing air and moisture from a circuit by vacuum before introducing refrigerant, protecting system performance and preventing contamination.
Refrigerant trading authorisation
An authorisation granted to a business entity permitting it to buy, sell, store, or otherwise trade in regulated refrigerants under stated conditions.
Business versus individual
An RTA belongs to the business and its nominated site, whereas an RHL belongs to a person; the two are separate and neither substitutes for the other.
Purchaser verification
The requirement that an RTA holder confirm a buyer holds a valid refrigerant handling licence before supplying regulated refrigerant to that buyer.
Sale record contents
Each refrigerant supply record must state the refrigerant type, quantity, date of supply, and the purchaser's licence details for audit purposes.
Nominated responsible person
An individual named by the business to be accountable for RTA compliance; this person must hold the relevant refrigerant handling licence.
Storage conditions
Authorisation conditions requiring regulated refrigerant to be stored securely, correctly labelled, segregated by type, and protected from damage or unauthorised access.
Notification of changes
The obligation to inform the regulator of changes to business details, nominated persons, or premises within the period set by the authorisation conditions.
Supply to unlicensed person
A breach of the trading authorisation that can lead to suspension or cancellation, because regulated refrigerant may only go to licensed recipients.
RTA scope limit
An RTA permits trading in refrigerant but does not authorise the holder to perform handling work, which requires a separate personal licence.
Training competency scope
Training must cover recovery, charging, leak testing, and record keeping, matching the competencies required for the licence scope being sought.
Practical assessment
An assessment component where the candidate physically demonstrates handling tasks; a written test alone cannot establish handling competency.
Code-consistent training
Training providers must teach procedures and use equipment consistent with the current national refrigerant handling code of practice.
Refresher interval
The period after which a licence holder must complete refresher training or reassessment to maintain currency, as set by the licensing framework.
Training records
Documentation of training completion including the assessor, date, and competency outcome, retained and available for regulatory audit.
Environmental obligations
Training must cover duties relating to ozone-depleting substances and synthetic greenhouse gases, including the prohibition on venting refrigerant.
Flammable refrigerant training
Where the licence scope includes flammable refrigerants, training must address ignition-source control, safe charging, and appropriate equipment use.
Reassessment triggers
Circumstances requiring competency to be reassessed, such as a long period without handling work or following a serious safety incident.
Record retention period
The length of time records must be kept as specified by the regulator; a common requirement is five years from the date of the record.
Contemporaneous records
Records made at the time of the activity, legible and accurate, rather than reconstructed later from memory or estimates.
Recovery disposal linkage
A record connecting the quantity of refrigerant recovered to the specific equipment or site and to the facility that received it.
Production on request
The obligation to provide records to an authorised officer when asked; failing to produce them is itself a breach of the framework.
Electronic record validity
Electronic records satisfy record-keeping duties if they are secure, retrievable, and can be reproduced in a legible form on request.
Inventory reconciliation
A check that purchases plus recovered stock minus sales and disposals equals on-hand refrigerant inventory, revealing discrepancies or unrecorded movement.
Licence number on invoices
Where required, the licence or authorisation number must appear on invoices and quotations so recipients can verify the supplier's status.