ARCtick Licence study materials
ARCtick Licence study resources

ARCtick Licence: Refrigerant Industry Training: Competency and Assessment

ARCtick Licence · Work through your exam, one topic at a time.

All guide sections

Refrigerant Industry Training: Competency and Assessment

Purpose of training

Refrigerant industry training exists to ensure that people who handle controlled refrigerants can do so safely, lawfully and with environmental responsibility. Training is the pathway to the Refrigerant Handling Licence, and it typically covers refrigeration principles, the environmental impact of refrigerants, safe handling, recovery and recycling, brazing, pressure testing, evacuation and commissioning, plus the regulatory framework.

Concepts a candidate must know

Understand the competency-based structure: units of competency, theory and practical assessment, and the requirement to demonstrate skills rather than simply pass a written test. Know the safety content - refrigerant toxicity and asphyxiation risk in confined spaces, frostbite and eye injury from liquid refrigerant, cylinder handling, and the flammability classification of some refrigerants (A1, A2L, A3 and so on). Know the environmental content - ozone depletion potential, global warming potential, and why recovery matters. Understand that training must be current and that some qualifications require refresher or reassessment.

Traps in questions

Watch for items implying that online study alone qualifies someone, that a generic safety induction substitutes for refrigerant-specific training, or that a qualification in one refrigerant category automatically covers all categories. Also be alert to questions that confuse the training provider's role with the regulator's licensing role.

Worked example / rule of thumb

Rule of thumb: train, then assess, then licence. Example: a new entrant completes the theory component covering GWP and ODP, then a practical assessment requiring them to recover refrigerant from a system, weigh the recovery cylinder and complete the record. Only after both components are signed off does the licence application proceed.