CPC30620 Painting study plan
CPC30620 Painting · Give each week a clear focus.
8 weeks · About 7 hours per week
Core units of competency
Identify the core units that make up Domain 1 and map each one to a real painting task you already perform or will perform on site
Explain workplace health and safety obligations for painting work, including hazard identification, risk controls, and safe handling of solvents and coatings
Demonstrate correct selection and use of personal protective equipment for surface preparation, application, and cleanup tasks
Set up a personal study log that records hours, unit codes, and evidence collected for each core unit
Your checkpoint
A one-page unit map listing every Domain 1 core unit with a matched workplace task and an evidence note for each
Core units of competency
Describe surface preparation requirements for common substrates including timber, masonry, plasterboard, and metal
Select appropriate fillers, primers, and sealers for each substrate and justify the choice in writing
Carry out a documented preparation sequence on a practice surface and record each step with photos or notes
Explain how moisture, contamination, and temperature affect preparation and coating adhesion
Your checkpoint
A written preparation procedure for three different substrates with justified product selections and a photo or note log of one completed practice surface
Core units of competency
Identify the main types of paints, stains, and clear finishes and state where each is suited
Interpret a product data sheet to extract drying times, recoat windows, coverage rates, and thinning instructions
Calculate paint quantities for a given area using coverage rates and allow for coats and waste
Explain the environmental and disposal requirements for leftover coatings, solvents, and containers
Your checkpoint
A quantity take-off sheet for a sample room that calculates litres needed per coat and includes a disposal plan for surplus product
Core units of competency
Demonstrate brush, roller, and spray application techniques appropriate to different surfaces and finishes
Describe how to set up, adjust, and clean spraying equipment safely and maintain consistent coverage
Plan a work sequence that accounts for drying times, access, masking, and protection of adjacent surfaces
Diagnose common finish defects such as runs, sags, holidays, and overspray and state a corrective action for each
Your checkpoint
A documented practical application on a practice panel using at least two methods, with a defect log naming each fault and its fix
Core units of competency
Interpret a simple project scope and produce a materials list, labour estimate, and task sequence
Explain quality assurance checks performed at each stage of a painting job and how to record them
Describe how to communicate progress, variations, and defects to a client or supervisor professionally
Outline how to read and apply manufacturer and Australian Standard guidance relevant to coating selection
Your checkpoint
A complete job plan for a small two-room project including scope, materials, sequence, quality checkpoints, and a client communication note
Core units of competency
Review all Domain 1 units and rank them by confidence using your study log evidence
Complete practice questions or written responses for the weakest three core units and mark them against the unit criteria
Re-perform one practical task from an earlier week and compare the result to your first attempt
Consolidate evidence into a portfolio index that cross-references each core unit to a specific artefact
Your checkpoint
A portfolio index linking every Domain 1 core unit to at least one piece of evidence, plus a ranked list of remaining weak areas
Core units of competency & Elective units of competency
Select the elective units for Domain 2 that best match your current or intended work and confirm their requirements
Complete the learning activities for your first elective unit and record evidence in the portfolio
Identify how elective skills integrate with core painting tasks on a real job
Close out any outstanding Domain 1 evidence gaps identified in week 6
Your checkpoint
A completed evidence set for the first elective unit and a signed-off checklist showing no open Domain 1 gaps
Core units of competency & Elective units of competency
Complete the remaining elective unit activities and add the evidence to the portfolio
Run a full timed mock assessment covering both domains and mark it against the unit criteria
Revise the three lowest-scoring areas from the mock assessment
Finalise the portfolio so every unit in both domains has traceable, current evidence
Your checkpoint
A finished portfolio covering all core and elective units, plus a marked mock assessment with a short revision summary
Milestones
Week 2: All Domain 1 core units are mapped and at least one preparation procedure is documented with photographic or written evidence
Week 4: Practical application evidence exists for brush, roller, and spray methods, and the quantity take-off and defect log are complete
Week 6: Portfolio index covers every Domain 1 unit with no unit lacking evidence, and the weakest three units have been re-tested
Week 8: Both domains fully evidenced, mock assessment completed and marked, and all identified weak areas addressed