Cert III Scaffolding · Put your knowledge to work in context.

All case studies

Loading Allowance on a Cantilevered Spur

You are the scaffolder erecting a 3.6 m cantilevered spur from a 6 m high modular frame to reach a loading dock canopy. The frame bays are 2.4 m long, standards are at 2.0 m centres and the top lift is fully decked with steel planks. The duty is specified as medium duty (2.0 kPa) for the full decked area, including the spur. A site engineer has given you a hand sketch showing a spur back-propped with two diagonal tubes tied to the base of the nearest standard, with no design calculations attached. The canopy has a 400 mm parapet you must not load, and the client wants the spur decked to within 200 mm of the parapet so workers can clean the gutter. Your leading hand suggests adding a third diagonal and using single couplers at the standard because 'the spur is only 1.2 m wide'.

1. Identify the load-path and structural issues in the proposed spur and explain what you must do before erecting it.

Read the worked answer

The critical issue is that a cantilevered spur transfers overturning moment into the parent frame, not just vertical load. Two diagonals tied to the base of the nearest standard create a couple, but the standard and its base are not designed for that moment unless the design says so. With medium duty over the spur and the parent deck, the moment at the spur root and the uplift or download on the rear standards must be calculated, including the self-weight of the spur and its decking. The hand sketch has no calculations, so it is not a design. Before erecting, obtain a design (or written confirmation) that covers: the spur's rated duty, the connection capacity at the root, the tie or kentledge arrangement resisting uplift, and the effect on the parent frame's stability. Single couplers at the standard are a right-angle load connection, not a moment connection; do not substitute them for a designed moment connection. Also check the 200 mm gap to the parapet: you cannot load the parapet, and the decking must not bear on it. If the design cannot be produced, do not erect the spur; propose a propped independent spur or a ground-supported tower instead.

2. The client insists the spur be decked to 200 mm from the parapet. How do you resolve this against the structural constraints?

Read the worked answer

The 200 mm gap is a geometry request, not a structural permission. First, confirm from the design whether the spur can be extended to that width; a wider spur increases both the cantilever moment and the deck load. Second, the parapet is not a support and must not be used as one, so the decking edge must be self-supporting with a designed edge beam or transom, and the gap must be treated as a fall edge. Third, check the duty: medium duty at 2.0 kPa over the enlarged deck may exceed the design's assumed area, so the design must be re-checked for the actual decked area. If the design does not cover the extension, offer alternatives: a narrower spur with a purpose-made gutter-access platform, or a mobile elevating work platform for the gutter cleaning. Record the client's request and your refusal in writing, and get the design amended before changing the geometry. Do not let the leading hand's 'only 1.2 m wide' reasoning override the design.