- Hierarchy of control
- A ranked order for managing risk: eliminate the hazard first, then substitute, isolate, use engineering controls, apply administrative controls, and use personal protective equipment last.
- Respirable crystalline silica
- Fine dust particles from cutting, sanding or mixing plaster that can reach the deep lung. Controls include wet methods, on-tool extraction and fit-tested respiratory protection.
- Safety data sheet sections
- A safety data sheet has sixteen sections, covering identification, hazards, composition, first aid, firefighting, accidental release, handling, exposure controls, physical properties, stability, toxicology, ecology and disposal.
- Scaffold working platform
- A platform at least 450 millimetres wide, fully decked, with guardrails, mid-rails and toe boards, and planks secured so they cannot move or tip.
- Washout containment
- A lined or bunded area where plaster and render residue and tool wash water are collected and settled, preventing discharge to stormwater drains or waterways.
- Drawing scale 1:50
- One unit on the drawing represents fifty of the same units on site, so a 25 millimetre line on the sheet represents 1250 millimetres of real building.
- Reduced level
- A height expressed in metres relative to a survey datum, usually to three decimal places. Positive values sit above the datum and negative values below it.
- Drawing precedence
- The order used to resolve conflicts, normally specification first, then large-scale details, then general drawings. Written dimensions override measurements scaled from the sheet.
- Floor-to-floor height
- The vertical distance from one finished floor level to the finished floor level above. It differs from ceiling height, which is measured to the ceiling lining.
- Detail callout bubble
- A reference symbol on a drawing giving the detail number and the sheet where the enlarged view appears. The arrow shows the direction of view.
- Stainless steel trowel
- A finishing trowel used to compact and polish the plaster surface. It produces a denser face than a steel trowel and reduces the risk of overworking moisture to the surface.
- Wood float purpose
- A timber float textures and compacts a coat, leaving an open, keyed surface that gives mechanical grip for the next coat of plaster or render.
- Mixing paddle speed
- Plaster is mixed at low speed, roughly 400 to 600 revolutions per minute, to blend the powder without entraining air that weakens the set.
- Rotor-stator cleaning
- The pump chamber of a render spray machine is flushed and cleaned daily, and the hose is depressurised before any coupling is loosened.
- Screed straightness check
- Before use, rules and screeds are sighted or checked against a known straight edge, because a warped screed transfers its error into the finished plane.
- Background suction control
- Porous masonry draws water from fresh plaster. Dampening or priming the background slows suction so the mix retains enough water to set and gain strength.
- Dot and screed method
- Dots are fixed plumb and level at intervals, screeds are run between them, and the plane is checked with a straight edge before plastering begins.
- Bonding agent function
- A primer or slurry applied to a background to control suction or provide adhesion. In wet areas the film must not remain water-soluble and weak.
- Angle bead
- A prefabricated profile fixed to an external corner to form a straight, protected arris. It is set plumb and true before the plaster or render coat is applied.
- Mechanical key
- A scored, spattered or meshed surface that gives plaster something to grip. Smooth concrete and dense backgrounds need a key to prevent shelling.
- Gypsum finish coat
- The final thin coat of gypsum plaster, commonly about two to three millimetres, applied over a set and keyed backing coat and trowelled to a smooth face.
- Retempering prohibition
- Adding water to plaster that has begun to stiffen is not permitted, because it breaks the set structure and produces a weak, dusty surface.
- Internal angle sequence
- In an internal corner the first wall is finished, then the adjoining wall is worked and the angle closed with an internal corner trowel before the first wall sets.
- Crazing cause
- A network of fine surface cracks caused by shrinkage as the plaster dries too quickly. Controlled drying and correct mix reduce the risk.
- Cement lime sand render
- A common external render mix of one part cement, one part lime and six parts sand by volume. Richer mixes shrink more and crack more readily.
- Scratch coat
- The first render coat, typically eight to ten millimetres thick, scored with a comb or scratched to form a key for the following coat.
- Render control joint
- A deliberate break in the render, formed with a bead at changes of substrate or at set spacings, that allows movement without random cracking.
- Efflorescence
- A white salt deposit left on the surface as moisture evaporates from masonry or render. It is brushed off dry and the moisture source is corrected.
- Polished plaster sheen
- The sheen comes from trowel pressure applied at the right stage of set, which compacts the material. Timing and pressure must be consistent across the wall.
- Approved sample panel
- A small area finished on site and accepted by the client as the benchmark for colour, texture and sheen. It is retained for comparison during the works.
- Pigment batching
- Coloured oxides are weighed, not measured by volume, and one pigment batch is used for a whole elevation so the colour stays consistent.
- Drummy plaster repair
- Hollow, unbonded plaster is cut back to sound material, the background is keyed and primed, and the patch is filled and blended into the surrounding finish.