Cert III Steelfixing · Get comfortable with the vocabulary.

Reinforcement schedule

A drawing or document listing the bar sizes, shapes, quantities and spacing needed for each structural element, used to plan cutting, bending and fixing work on site.

Related: Bar mark, Cutting list, Bar bending schedule
Bar bending schedule

A tabulated list giving each bar mark, its size, shape code, dimensions, number required and bending details, so bars can be cut and bent accurately before delivery to the work face.

Related: Bar mark, Shape code, Cutting list
Bar mark

A unique label assigned to a particular bar shape and size in a schedule or on a drawing, allowing fixers to match delivered bundles to the correct location in the structure.

Related: Bar bending schedule, Reinforcement schedule
Shape code

A standard reference letter or number describing a specific bent-bar configuration, such as a straight bar, hook or cranked bar, so bending is consistent and verifiable against the schedule.

Related: Bar bending schedule, Hook, Cranked bar
Cutting list

A practical working list showing how many bars of each length and diameter must be cut from stock, prepared from the schedule to minimise waste and control material ordering.

Related: Bar bending schedule, Lap length
Concrete cover

The depth of concrete between the outer surface of the reinforcement and the nearest exposed concrete face, protecting steel from corrosion and providing fire resistance.

Related: Spacer, Cover meter, Bar chair
Spacer

A small block, clip or proprietary device placed between reinforcement and formwork or between layers of steel to hold the specified concrete cover and bar spacing during pouring.

Related: Concrete cover, Bar chair, Cover meter
Bar chair

A support, usually of bent wire or precast concrete, placed under top reinforcement to hold it at the designed height above the bottom mat while concrete is placed and vibrated.

Related: Spacer, Top mat, Concrete cover
Cover meter

A handheld electromagnetic instrument used to locate embedded reinforcement and estimate the depth of concrete cover, helping verify that spacers and chairs have held steel in position.

Related: Concrete cover, Spacer
Lap length

The distance over which two reinforcing bars overlap so that force transfers between them, specified by the designer and dependent on bar size, grade and concrete strength.

Related: Staggered lap, Tie wire, Development length
Staggered lap

An arrangement where adjacent bars are lapped at different positions along the member rather than all in one cross-section, reducing congestion and spreading the transfer of stress.

Related: Lap length, Bar congestion
Development length

The length of embedment required for a bar to develop its full design strength within the concrete, often checked where bars terminate, anchor or bend into a support.

Related: Lap length, Hook, Anchorage
Anchorage

The means by which a reinforcing bar is held in the concrete so it can transfer force, achieved through embedment length, hooks, bends or mechanical end fittings.

Related: Development length, Hook
Hook

A bend at the end of a reinforcing bar, commonly 90 or 135 degrees with a specified extension, used to anchor the bar in concrete where straight embedment is insufficient.

Related: Anchorage, Shape code, Development length
Cranked bar

A bar bent to change level, often used to move from a bottom mat to a top mat near supports, transferring tension steel to where bending moments require it.

Related: Shape code, Top mat
Top mat

The upper layer of reinforcement in a slab, beam or footing, generally held in position by bar chairs and resisting tension over supports or cantilevers.

Related: Bar chair, Bottom mat, Cranked bar
Bottom mat

The lower layer of reinforcement in a slab or footing, supported on spacers over the formwork or blinding and resisting sagging tensile forces in the member.

Related: Top mat, Spacer
Tie wire

Soft annealed wire, usually 1.6 mm diameter, twisted around intersecting bars with a hook tool to hold the reinforcement cage together and in its correct position.

Related: Lap length, Bar congestion
Bar congestion

A condition where so many bars, laps or splices occupy a section that concrete cannot be placed and compacted properly, risking voids and inadequate bond.

Related: Staggered lap, Tie wire, Vibration
Vibration

The process of compacting freshly placed concrete with a poker vibrator to remove entrapped air and ensure it fully surrounds and bonds to the reinforcement.

Related: Bar congestion, Concrete cover
Rebar grade

The strength classification of reinforcing steel, commonly expressed as yield stress in megapascals, which determines the design capacity and must match the schedule.

Related: Rebar diameter, Reinforcement schedule
Rebar diameter

The nominal cross-sectional size of a reinforcing bar in millimetres, used with grade and spacing to identify bars and calculate weight and lap requirements.

Related: Rebar grade, Bar mark
Deformed bar

Reinforcing steel with ribs or indentations rolled onto its surface to improve mechanical bond with concrete, as opposed to plain round bar used mainly for fitments.

Related: Rebar diameter, Mesh
Mesh

Factory-welded or woven sheets of reinforcement, specified by wire diameter and pitch, commonly used for slabs, pavements and crack control in surface zones.

Related: Deformed bar, Spacer
Formwork

The temporary moulds, sheeting and supports that shape wet concrete, against which reinforcement must be positioned with correct cover before placement begins.

Related: Concrete cover, Spacer
Safe work method statement

A written document setting out high-risk construction tasks, the hazards involved, the control measures to be applied and the sequence in which the work will be done.

Related: Hierarchy of control, Exclusion zone
Hierarchy of control

The ranked order of risk controls from eliminating the hazard through substitution, engineering, administrative measures to personal protective equipment, used when planning steelfixing tasks.

Related: Safe work method statement, Exclusion zone
Exclusion zone

A marked or barricaded area where unauthorised people are kept out, used beneath lifting operations and around areas where reinforcement is being hoisted or moved.

Related: Safe work method statement, Rigging
Rigging

The selection, inspection and use of slings, shackles and lifting gear to attach and control loads such as bar bundles or prefabricated cages during crane lifting.

Related: Exclusion zone, Dogger
Dogger

A licensed worker who directs crane operators using hand signals or radio, ensuring loads are moved safely and land in the planned position on site.

Related: Rigging, Exclusion zone
Manual handling

Lifting, carrying, pushing or pulling loads by hand, requiring assessment of weight, grip, posture and team lifting to reduce the risk of musculoskeletal injury.

Related: Hierarchy of control
Bar bending machine

A powered or manual machine that bends reinforcing bar to a required angle around a former, with settings checked against the shape code and dimensions on the schedule.

Related: Shape code, Bar cutting machine
Bar cutting machine

A machine using shear blades to cut reinforcing bar to length, requiring guards, correct blade setting and safe handling of cut lengths to avoid injury.

Related: Bar bending machine, Cutting list
Prefabricated cage

A reinforcement assembly tied or welded together at ground level and lifted into place as a unit, improving quality and reducing work at height.

Related: Rigging, Tie wire
Inspection and test plan

A project document listing the checks, hold points and records required for each stage of work, such as pre-pour reinforcement inspection before concrete placement.

Related: Reinforcement schedule, Concrete cover
Hold point

A stage in construction where work cannot proceed until a specified inspection or approval has been completed and recorded, often before covering reinforcement with concrete.

Related: Inspection and test plan
Non-conformance report

A record raised when work or materials fail to meet the specified requirements, describing the problem, its location and the corrective action agreed.

Related: Inspection and test plan, Hold point