High Risk Work Licence - Slewing Mobile Crane C1 (100t) study materials
High Risk Work Licence - Slewing Mobile Crane C1 (100t) study resources

High Risk Work Licence - Slewing Mobile Crane C1 (100t) flashcards

High Risk Work Licence - Slewing Mobile Crane C1 (100t) · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

C1 licence capacity range
A C1 high risk work licence covers slewing mobile cranes with a rated capacity greater than 20 tonnes and up to and including 100 tonnes.
Primary duty of care
A PCBU must ensure, so far as is reasonably practicable, the health and safety of workers and others affected by the business or undertaking.
Hierarchy of control order
Eliminate the risk, then substitute, isolate, engineer, apply administrative controls, and use personal protective equipment last.
Rated capacity definition
The maximum load a crane may lift in a specific configuration, being the lesser of the structural limit and the stability limit at that radius.
Radius measurement point
Radius is the horizontal distance from the crane's centre of rotation to the vertical line through the load's centre of gravity.
Sling angle tension rule
As the angle between sling legs and the horizontal decreases, tension rises; two legs at 30 degrees each carry about the full load.
Centre of gravity effect
If the centre of gravity is offset from the hook, the load tilts, sling tensions become unequal and the load may shift during the lift.
Ground bearing pressure check
Outrigger load must be compared with the ground's capacity; backfill, trenches, drains and pits can collapse under outrigger pressure.
Anti-two-block device
A safety device that prevents the hook block from contacting the boom tip, which could break wire rope or damage the boom.
Load moment indicator
An instrument that displays radius, boom angle, load and percentage of rated capacity, and alarms or stops operation when capacity is approached.
Emergency stop signal
A long whistle blast or the standard emergency hand signal means stop immediately; anyone may give it, not only the signal person.
Lost communication rule
If the operator loses sight of the load or contact with the signal person, the operator stops the movement and holds the load until communication resumes.
Multi-crane lift rating
Each crane in a multi-crane lift should be rated for at least 75 per cent of its load share unless an engineer justifies otherwise.
Personnel lifting condition
Lifting people is permitted only when it is the least risk option, using a purpose-built box, a documented plan and harness anchor points.
Exclusion zone basis
The zone is sized from the slew path, load radius, potential fall or drift, and powerline clearance, then barricaded and signed.
Powerline contact response
Stay in the cab, warn others away and do not touch the crane; jump clear only as a last resort with feet together.
Wind limit source
The maximum permissible wind speed is stated in the crane's load chart or manual and is measured at the boom or load, not at ground level.
Shutdown parking steps
Land the load, lower and pin the boom, retract and pin outriggers, apply the parking brake, secure the hook block and isolate the battery.
Defect tagging rule
A crane with a defect affecting safe operation must be tagged out, recorded and repaired by a competent person before it is returned to service.
Notifiable incident report
The regulator must be notified immediately by the fastest means after a death, serious injury or dangerous incident, with a written report to follow.
Sling working load limit
The WLL is the maximum mass a sling or fitting may carry in a specified configuration; it must be tagged and never exceeded.
Boom length chart effect
Increasing boom length generally reduces rated capacity at the same radius because of structural and deflection limits.
Outrigger pad purpose
Pads spread outrigger load over a larger area, reducing ground bearing pressure and the risk of punch-through or settlement.
Signal person authority
Only the designated signal person directs the operator, except that anyone may give a stop signal at any time.
Lifting plan contents
The plan records load mass and centre of gravity, crane configuration, radius, capacity used, rigging, ground conditions, roles and controls.
Competent person meaning
A person with training, qualification or experience giving the knowledge and skills to perform the specific task safely.
Consultation duty
The PCBU must consult workers and health and safety representatives when identifying hazards and deciding controls that affect them.
Near miss reporting
A near miss is an incident without injury that must be reported internally so causes are corrected before a serious incident occurs.
Pick-and-carry rating
Travelling with a load uses a separate, lower capacity chart than stationary lifting and requires firm level ground and a planned route.
Tag line use rule
Tag lines control load rotation and swing; they must be long enough to keep people clear and never wrapped around hands or body.
Daily inspection record
The pre-start inspection result must be recorded and signed; defects are reported and the crane tagged out until repaired.
Crane levelling requirement
The crane must be levelled per the manufacturer's procedure before lifting, because out-of-level setup reduces capacity and loads the boom unevenly.