High Risk Work Licence - Slewing Mobile Crane C2 (20t) flashcards
High Risk Work Licence - Slewing Mobile Crane C2 (20t) · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- C2 licence capacity
- A C2 high risk work licence authorises operation of a slewing mobile crane with a maximum rated capacity of up to and including 20 tonnes, regardless of the load actually lifted.
- Licence renewal period
- High risk work licences are issued for five years and must be renewed before the expiry date; operating on an expired licence is unlicensed work.
- SWMS requirement
- A Safe Work Method Statement is mandatory for high risk construction work, and must be prepared, followed and reviewed for crane operations on construction sites.
- Primary duty of care
- A PCBU must eliminate risks so far as is reasonably practicable, and if elimination is not possible, minimise risks using the hierarchy of controls.
- AS 2550.5 scope
- AS 2550.5 sets Australian requirements for the safe use of mobile cranes, covering inspection, maintenance, operation, lifting and personnel responsibilities.
- Competent person meaning
- A competent person has the training, qualification or experience needed to perform the assigned task safely, such as crane inspection or maintenance.
- Hierarchy of controls order
- Controls rank from elimination, substitution, engineering controls, administrative controls, down to personal protective equipment as the last line of defence.
- Load radius definition
- Load radius is the horizontal distance from the crane's slewing centre to the centre of gravity of the load, measured with the boom in its working position.
- Rated capacity factors
- Rated capacity depends on load radius, boom length, boom angle, counterweight, outrigger configuration and jib setup, and is read from the manufacturer's load chart.
- Gross versus net load
- Gross load includes the load plus rigging, slings, hook block and attachments; net capacity is the chart capacity minus these deductions.
- Load moment indicator
- The LMI monitors load and radius, displays capacity utilisation, and alarms or cuts out when the crane approaches or exceeds its rated capacity.
- Wire rope discard criteria
- Broken wires in a set length, diameter reduction, corrosion, kinks and bird-caging determine wire rope retirement under AS 2759 and ISO 4309.
- Daily pre-start inspection
- A documented daily check of tyres, outriggers, wire rope, hook and latch, brakes, slew ring and safety devices before the crane is used.
- Two-leg sling tension
- Tension per leg equals half the load divided by the cosine of the angle from vertical; wider included angles increase tension in each leg.
- Sling angle factor
- The tension multiplier is about 1.155 at 60 degrees from horizontal, 1.414 at 45 degrees, and 2.0 at 30 degrees.
- Four-leg sling rating
- Most standards rate a four-leg sling assembly for only three legs carrying load, because equal sharing among four legs is not assured.
- Sling rejection signs
- Cuts, fraying, broken wires, heat or chemical damage, distorted fittings, and missing or illegible tags require the sling to be removed from service.
- Outrigger bearing pressure
- Ground bearing pressure under an outrigger equals the load share divided by the pad contact area; larger pads reduce pressure on the ground.
- Underground service check
- Before setting outriggers, locate underground power, gas, water and communications services using service records and a locator to avoid damage.
- Level setup requirement
- The crane must be set up on a level, stable surface within the manufacturer's maximum slope, verified with a level before any lift.
- Exclusion zone purpose
- A barricaded exclusion zone keeps unauthorised people out of the slew radius and the area under the load, preventing crush and drop injuries.
- Smooth slew technique
- Slew slowly and smoothly because sudden starts and stops cause load swing and increase dynamic loading on the crane and rigging.
- Tag line use
- Tag lines control load rotation during the lift; handlers must stay clear of the load and never stand beneath it.
- Travel with load rules
- Travel with a load only when the manufacturer permits it, the load is within travel capacity, and the boom is in the specified travel position.
- Stop signal authority
- A stop signal must be obeyed immediately regardless of who gives it, even if another person is the designated signal person.
- Designated signal person
- One signal person is designated for each lift; commands are clear and confirmed, and the operator responds only to that person except for stop signals.
- Lost radio contact
- If radio contact is lost, the operator stops the lift and holds the load until communication is restored or the load is safely landed.
- Powerline contact response
- Stay in the cab, warn others to stay clear, and do not touch the crane or load until the power authority isolates the supply.
- Cab evacuation technique
- If fire forces evacuation, jump clear of the crane and shuffle away with feet together, never touching the crane and ground at the same time.
- Notifiable incident duty
- Serious injuries and dangerous incidents must be reported to the regulator, and the site preserved so far as reasonably practicable until an inspector permits otherwise.
- Post-shift crane securing
- After the shift, land and secure the load, retract and lower the boom, stow outriggers, apply the parking brake, chock wheels and isolate power.
- Defect reporting after shift
- Post-operational inspections record any defects, which are reported so the crane is not returned to service until repaired by a competent person.