High Risk Work Licence - Vehicle Loading Crane (CV) study materials
High Risk Work Licence - Vehicle Loading Crane (CV) study resources

High Risk Work Licence - Vehicle Loading Crane (CV) flashcards

High Risk Work Licence - Vehicle Loading Crane (CV) · Build recall with a focused review session.

33 cards. Read the term and the definition here. The deck at the top of this page is optional.

Rated capacity
The maximum load mass the crane may lift at a specified radius and boom configuration, as stated by the manufacturer's load chart, with rigging mass deducted.
Operating radius
The horizontal distance from the crane's rotation centre to the load's centre of gravity; increasing radius reduces the crane's rated capacity.
Net capacity calculation
Gross chart capacity minus the combined mass of hook block, slings, spreader bars and attachments between the boom head and the load.
Load chart
Manufacturer-supplied table or graph giving rated capacity for each combination of radius, boom length and boom angle, assuming a level crane.
Centre of gravity
The point where the load's mass is balanced; an off-centre centre of gravity increases effective radius and can overload the crane.
Lift plan
A documented plan for a complex or near-capacity lift, covering load mass, radius, rigging, ground conditions, roles and emergency controls.
Exclusion zone
The area beneath and around the suspended load and slew path where personnel are prohibited, marked and controlled during lifting operations.
High risk work licence
The nationally recognised licence required to operate a vehicle loading crane, obtained after training and competency assessment.
Outrigger deployment
Extending outrigger beams and pads fully as specified by the manufacturer, since part extension can reduce capacity or invalidate the load chart.
Outrigger pad sizing
Selecting pads that spread the outrigger load so ground pressure stays below the ground's bearing capacity, preventing sinking or tipping.
Levelling the crane
Adjusting outriggers until the vehicle's level indicator shows the crane is level, because load charts assume a level crane.
Pre-start inspection
A check of tyres, outriggers, hydraulic hoses, wire rope, hook and safety devices before each operation to identify defects.
Wire rope inspection
Examining rope for broken wires, kinks, corrosion, crushing and wear; rope with defects beyond the discard criteria must be removed from service.
Hook safety latch
A spring-loaded device on the hook that closes the throat opening to prevent slings and rigging from slipping off during lifting.
Rated capacity limiter
A device that warns and prevents operation when the load or radius exceeds the crane's rated capacity; it must not be bypassed.
Ground bearing capacity
The maximum pressure the ground can support without failing; outrigger pressure must remain below this value to prevent settlement.
Wheel chocking
Placing chocks against the wheels to prevent the vehicle rolling, especially on sloping ground or before deploying outriggers.
Slew area clearance
Ensuring all personnel are clear of the crane's rotation path and crush zones before the boom or load is slewed.
Shock loading
A sudden load increase caused by jerking, snatching or dropping a load, which can exceed rated capacity and damage the crane.
Tagline use
A rope attached to the load and controlled by a dogger to guide rotation and prevent swinging without personnel touching the load.
Side loading
A horizontal force applied to the boom by dragging a load or slewing too fast, which can damage the boom and destabilise the vehicle.
Travel with a load
Moving the vehicle while carrying a load only when the manufacturer's travel chart and instructions permit, with the boom in the specified position.
Hand signals
Standardised signals used between the dogger and crane operator; if signals are unclear or lost, the operation stops.
Suspended load rule
Personnel must never stand under a suspended load or between the load and a fixed structure, because of the risk of crush injury.
Load landing
Lowering the load onto a stable surface, releasing rigging tension gradually, and confirming stability before removing slings.
Boom stowing
Retracting and lowering the boom to the manufacturer's travel position and engaging the boom lock before moving the vehicle.
Outrigger retraction
Fully retracting outrigger beams, raising pads, and securing pins and locking devices in the travel position after the lift.
Crane shutdown sequence
Following the manufacturer's shutdown steps, applying the park brake, isolating power and removing the key to prevent unauthorised use.
Defect reporting
Recording defects found during post-operational inspection and tagging out the crane if it is unsafe for further use.
Crane logbook
A record of pre-start checks, defects, loads lifted and incidents, used to track the crane's condition and maintenance history.
Damaged sling tagging
Removing damaged slings from service by tagging them clearly so they cannot be reused until inspected or discarded.
Post-operational housekeeping
Clearing debris, securing the area, stowing equipment and confirming all personnel are clear before leaving the site.
Parking on a slope
Parking the vehicle on firm level ground where possible; on a slope, chock the wheels and apply the park brake before leaving.