High Risk Work Licence - Vehicle Loading Crane (CV) study materials
High Risk Work Licence - Vehicle Loading Crane (CV) study resources

High Risk Work Licence - Vehicle Loading Crane (CV): Shutting Down, Securing and Post-operational Procedures

High Risk Work Licence - Vehicle Loading Crane (CV) · Work through your exam, one topic at a time.

All guide sections

Shutting Down, Securing and Post-operational Procedures

Controlled shutdown

Lower the load to the ground, land it, and release tension before unhooking. Retract the boom and lower it to the stowed position. Return the hook block to its stowage and secure it. Retract outriggers fully, stow the pads, and confirm all locks engage. Switch off the power take-off, apply the parking brake, and remove the key.

Securing the vehicle

Walk around the vehicle and crane: check that the boom is locked in the travel position, stabiliser legs are pinned, and any loose equipment is stowed. Secure the load if one remains on the tray, using rated restraints. Check that the crane's controls are in neutral and the area is clear before moving off.

Post-operational records

Report any defects, damage, or abnormal behaviour immediately. Complete the pre-start/post-operational checklist and log hours. Tag out the crane if it is unsafe to use. Refuel and check fluids as required, and park on firm level ground away from traffic.

Traps in questions

Questions often describe leaving the boom raised overnight or parking on a slope - the answer is to lower and stow the boom and park on level ground. Another trap is moving off with outriggers partly extended or the hook unsecured. A third is failing to report a minor hydraulic leak; all defects must be recorded.

Worked example

After a shift, the operator notices the boom drifts down slowly when parked. Correct action: lower the boom to the stowed position, tag the crane as defective, record the fault, and report it to the supervisor - do not return it to service until repaired and inspected.