High Risk Work Licence - Materials Hoist (HM) study materials
High Risk Work Licence - Materials Hoist (HM) study resources

High Risk Work Licence - Materials Hoist (HM) case studies

High Risk Work Licence - Materials Hoist (HM) · Put your knowledge to work in context.

The Materials Hoist (HM) licence is an Australian high risk work licence for people who operate basic materials hoists on construction and industrial sites - the kind of hoist used to lift bricks, timber, tiles and other goods rather than people. It suits labourers, hoist operators, leading hands and site supervisors who need to move materials vertically in a controlled, compliant way. The national competency assessment has a written knowledge component and a practical performance component on an actual hoist, and an oral assessment can be arranged where reading or writing ability would otherwise disadvantage a candidate. The knowledge assessment spans the full scope of the work: the legislative and duty-of-care framework, hazard identification and risk control, hoist types and load capacity limits, pre-operational inspection and fault reporting, site preparation and exclusion zones, safe operating procedures and communication signals, shutdown and securing, emergency response, and maintenance and record keeping. The High Risk Work Licence - Materials Hoist (HM) case studies are 5 cases and about 2,779 words.

1

Hoist Overload and Load Chart Interpretation

You are the licensed operator of a materials hoist on a construction site. The hoist has a rated capacity of 1000 kg.

723 words, about 4 min
2

Pre-operational Inspection and Fault Reporting

You are about to start your shift operating a materials hoist. During your pre-operational inspection, you notice that the wire rope has several broken wires clustered in one strand over a length of 10 cm.

510 words, about 3 min
3

Site Preparation and Exclusion Zone Management

You are the operator of a materials hoist on a multi-storey construction site. The hoist is located at the edge of the building, and the landing area on the ground is adjacent to a pedestrian walkway used by site personnel and visitors.

533 words, about 3 min
4

Communication Signals and Load Handling

You are operating a materials hoist to lift a load of timber to the second floor. The signal person is a worker who has not been trained in hoist signals.

491 words, about 2 min
5

Emergency Response and Incident Reporting

You are operating a materials hoist when suddenly the hoist makes a loud grinding noise and the platform jolts. You immediately stop the hoist.

522 words, about 3 min