- Design load classes
- Light duty is 2.0 kN/m², medium duty 2.5 kN/m², and heavy duty 3.0 kN/m². The class determines platform width, transom spacing, and tie density.
- Ground bearing pressure
- Total leg load divided by the effective base plate area. A 150 mm square plate covers 0.0225 m², so a 10 kN leg load gives about 444 kPa, which must be below soil capacity.
- Minimum platform width
- A working platform must be at least 600 mm wide. Platforms of 450 mm (two boards) are for access only and must not be used as a work area.
- Overhead line clearance
- Scaffolds must stay at least 3.5 m horizontally from overhead lines up to 66 kV. Higher voltages need utility coordination and a written permit before erection begins.
- Guardrail dimensions
- Top rail sits 950–1100 mm above the platform, a mid-rail at about half height, and a toe board at least 150 mm high to stop tools and material sliding off.
- Excavation setback rule
- The scaffold base should be set back from an excavation crest by at least the excavation depth, unless a geotechnical assessment shows the soil can carry the leg loads safely.
- Public protection zone
- Where material could fall onto a pedestrian route, provide fan netting or a protected walkway. The exclusion width equals scaffold height plus the dropped-material fall radius.
- Tie spacing rule
- For standard independent tied scaffolds, ties are placed at vertical intervals of 4 m or less and horizontal intervals of 6 m or less. Ties resist wind uplift and pull-off as well as compression.
- Bracing pattern
- Ledger (zig-zag) bracing goes in every alternate bay and at both ends. Facade bracing runs continuously to the top, with a longitudinal bracing bay at 30 m maximum centres.
- Wind drag on tube
- Wind force on open tube is about 0.7 × dynamic pressure × projected area. Adding netting or sheeting multiplies this force several times, so ties must be recalculated.
- Standard tube dimensions
- Scaffold tube is 48.3 mm outside diameter with a 3.2 mm nominal wall (4.0 mm for heavier duty) and yield strength of 235–355 MPa. Never mix diameters in one member.
- Right-angle coupler capacity
- A correctly torqued right-angle coupler (40–50 N·m) carries roughly 6–7 kN slip capacity. Swivel couplers are lower and must not be the sole connection for a load-bearing tie.
- Cantilever anchorage moment
- The design moment at the anchorage equals the suspended load times its lever arm, plus scaffold self-weight. Counterweights must be calculated and positively fixed, never loose.
- Free-standing tower ratio
- A free-standing tower is limited to a base-to-height ratio of about 1:3. Outriggers extend this to about 1:4. Beyond that, the tower must be tied to a structure.
- Load path chain
- Platform load travels to transoms, then ledgers, then standards, then base plates, then ground. A missing transom or unbraced standard breaks the chain and concentrates load.
- Erection sequence
- Build bottom-up in complete lifts: base, standards, ledgers, transoms, platform, then guardrails. No lift may be left without guardrails before the next lift starts.
- Progressive tie installation
- Ties go in as the scaffold rises. A scaffold more than 2 m above a tie level without ties may not stand overnight without a documented assessment.
- Dismantling order
- Dismantle top-down, the reverse of erection. Keep ties in place until the lift below is removed, and lower tubes with a gin wheel or chute rather than dropping them.
- Competent person rule
- Erection, alteration, and dismantling require training and assessment for that specific scaffold type. Untrained alteration, such as removing a guardrail, is a leading incident cause.
- Gin wheel capacity
- A gin wheel is typically rated 250 kg with 500 kg rope. It must be fixed to a standard with a positive fixing, not a single coupler, and never overloaded.
- Ladder access rules
- Ladder stiles extend 1 m above the landing, the ladder sits at 75° (1 in 4), and it is tied at intervals of no more than 9 m along its length.
- Alteration assessment
- Adding a platform level, sheeting, or a hoist changes the load path. Any alteration must be checked against the original design before work proceeds.
- Weather hold points
- Stop erection or dismantling when wind exceeds the manufacturer's limit (commonly 17 m/s), during lightning, or when ice forms on tube surfaces.
- Inspection frequency
- Inspect before first use, after any alteration, after any event affecting stability, and at least every 7 days while the scaffold remains in use.
- Inspection record contents
- Record date, time, location, load class, findings, corrective action, and inspector name and signature. Retain for the scaffold's life plus the statutory period.
- Tagging system
- Red tag means do not use (missing ties, guardrails, or base plates). Amber means restricted use for minor damage. Green means safe after a full check.
- Point load spreading
- Never exceed the duty class. A concentrated load such as a brick stack must be spread over at least two boards or placed on a load-spreading plate.
- Tube rejection criteria
- Discard tubes bent more than 5 mm per metre, cracked, or with corrosion loss over 10% of wall thickness. Damaged components are replaced, not repaired.
- Fall protection for inspectors
- A scaffold is not fall protection for the people inspecting it. Inspectors use the same fall-arrest system as erectors, with anchorage points verified before climbing.
- Suspension trauma rescue
- A suspended worker must be rescued within about 15 minutes. Harness suspension restricts blood flow, so prompt rescue is a life-safety requirement, not a convenience.
- Housekeeping rule
- Keep platforms free of loose material and debris. Overlapping boards need positive fixing, and accumulated debris can blow off or overload the platform.
- Load rating verification
- Before loading, confirm the scaffold's rated duty class matches the intended task and that ties, bracing, and base plates are all in place for that class.