NSW Gasfitting · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Gas regulations, standards and licensing obligations & Gas properties, combustion and ventilation

  • Map each domain's weighting to a weekly time budget and write it down as a one-page schedule

  • Summarise the licensing, notification and record-keeping duties that attach to gasfitting work in NSW into a checklist

  • Define the combustion equation for natural gas and LPG and calculate theoretical air requirements for three sample inputs

  • List the AS/NZS standards and regulatory instruments you must be able to locate by name, and note what each covers

Your checkpoint

A one-page study schedule plus a compliance checklist covering licensing, notification and record-keeping duties

Week 2

Gas properties, combustion and ventilation

  • Calculate stoichiometric air, excess air and CO2 percentages for at least five worked fuel/air scenarios

  • Explain how incomplete combustion arises from air deficiency, flame impingement and poor burner condition

  • Determine ventilation requirements for an enclosed space using appliance input and room volume

  • Classify the physical properties of natural gas and LPG that drive installation decisions, including relative density and flammability limits

Your checkpoint

A worked problem set of ten combustion and ventilation calculations with answers and method notes

Week 3

Installation of gas appliances and pipework & Gas properties, combustion and ventilation

  • Size gas pipework for three realistic installations using pressure drop and load tables

  • Draft a pipework layout showing isolation, sleeving, support spacing and clearances to other services

  • Select flueing arrangements appropriate to appliance type and location, and justify each choice

  • Identify clearances and ventilation openings required for a range of appliance categories

Your checkpoint

Three completed pipe sizing sheets with layouts and a written justification for each flue selection

Week 4

Installation of gas appliances and pipework & Commissioning, testing and fault finding

  • Sequence the commissioning steps for a new installation from purge through to consumer handover

  • Perform and record a pressure test and a leak test to the required test pressures and durations

  • Describe how to verify operating pressure, gas rate and combustion performance at the appliance

  • Assemble a handover pack listing what the consumer must be told and what must be left on site

Your checkpoint

A complete commissioning and handover record for a simulated installation, including test results

Week 5

Commissioning, testing and fault finding

  • Build a fault-finding decision tree covering no ignition, poor flame, low heat output and intermittent operation

  • Diagnose five written fault scenarios and state the test that confirms each diagnosis

  • Interpret combustion analyser readings and identify the likely cause of out-of-spec CO or CO2 values

  • Explain how to isolate and make safe a defective appliance before repair

Your checkpoint

A fault-finding flowchart plus written diagnoses for five scenarios with confirming tests

Week 6

Safety, consumer protection and environmental requirements & Gas regulations, standards and licensing obligations

  • Summarise consumer protection obligations including disclosure, warranties and complaint handling

  • Identify environmental duties covering spillage, refrigerant and gas release, and waste disposal

  • List personal and site safety controls required before and during gasfitting work

  • Explain the process for reporting notifiable incidents and unsafe installations

Your checkpoint

A two-page safety and consumer protection reference sheet covering obligations, incident reporting and environmental duties

Week 7

Commissioning, testing and fault finding & Safety, consumer protection and environmental requirements

  • Re-run two timed commissioning scenarios to build speed and accuracy under exam conditions

  • Complete a mixed set of calculation questions across combustion, ventilation and pipe sizing

  • Review every previously missed question and write a corrected method for each

  • Practise explaining a safety decision aloud as you would to a consumer

Your checkpoint

A log of all errors from timed practice with corrected methods recorded against each

Week 8

Gas regulations, standards and licensing obligations & Gas properties, combustion and ventilation & Installation of gas appliances and pipework & Commissioning, testing and fault finding & Safety, consumer protection and environmental requirements

  • Complete two full-length timed practice exams and score each by domain

  • Revisit the two lowest-scoring domains and close the specific gaps identified

  • Recite the key standards, test pressures and clearances from memory without notes

  • Finalise a one-page exam-day reference of figures and formulas you must recall

Your checkpoint

Two scored practice exams with a domain-by-domain gap analysis and a final one-page reference sheet

Milestones

Week 2: Score at least 80% on a self-marked ten-question combustion and ventilation calculation set without notes

Week 4: Produce a commissioning record with correct test pressures, durations and results, and explain each step aloud without referring to notes

Week 6: Correctly diagnose at least four of five fault scenarios and state the confirming test for each

Week 8: Achieve at least 75% overall on each full-length practice exam, with no domain below 65%