HSC Enterprise Computing · Build recall with a focused review session.

33 cards. Read the term and the definition here. The deck at the top of this page is optional.

Enterprise computing system
A large-scale, integrated IT environment supporting core organisational processes across departments and sites, characterised by high volume, integration, shared data and mission-critical availability requirements.
Transaction processing system
A system that captures and records high-volume routine business events as transactions, maintaining accuracy and consistency through immediate or batch processing and recovery logging.
Management information system
A system that draws on stored transaction data to produce scheduled summary and exception reports, supporting routine operational planning and control by middle managers.
Decision support system
An interactive system combining data, models and analytical tools so managers can run what-if scenarios and compare alternatives for semi-structured decisions.
Data hierarchy
The ordering of stored data from smallest to largest: field (one attribute), record (related fields), file (related records) and database (integrated collection of related files).
Relational database
A database that stores data in tables of rows and columns, linking tables through primary and foreign keys so relationships are represented without duplicating data.
Primary key
An attribute or minimal combination of attributes whose value uniquely identifies each record in a table and cannot be null or duplicated.
Foreign key
An attribute in one table that matches the primary key of another table, creating a relationship and enforcing referential integrity between the two tables.
Referential integrity
A rule ensuring every foreign key value matches an existing primary key value, or is null, so records cannot reference nonexistent parent records.
Normalisation
The process of organising attributes into related tables to eliminate repeating groups and reduce insertion, update and deletion anomalies caused by redundant stored data.
ACID properties
Four transaction guarantees: atomicity (all or nothing), consistency (valid state to valid state), isolation (concurrent transactions do not interfere) and durability (committed changes survive failure).
DBMS
Database management software that defines, stores, retrieves and secures data, providing concurrency control, integrity enforcement, authorisation, backup, recovery and transaction logging services.
Client-server architecture
A model where client devices request services and servers supply data or processing, separating presentation from shared data and centralising control of resources.
N-tier architecture
An architecture splitting a system into separate presentation, application and data layers, so each layer can be scaled, secured or replaced independently of the others.
Virtualisation
Running multiple logical servers or environments on one physical host, raising hardware utilisation, isolating workloads and enabling rapid provisioning and testing.
Cloud service models
IaaS supplies virtual infrastructure, PaaS supplies a development and hosting platform, and SaaS supplies finished applications; responsibility for management shifts from client to provider.
Firewall
A network control that inspects traffic and permits or blocks it according to configured rules, protecting internal systems from unauthorised external access.
Encryption
Converting readable data into ciphertext using a key so that intercepted or stolen data cannot be understood without the corresponding decryption key.
Authentication and authorisation
Authentication verifies a user's claimed identity, while authorisation determines which resources and actions that verified identity is permitted to access.
Project life cycle
The staged sequence of initiation, planning, execution, monitoring and control, and closure, each stage producing deliverables and a gate decision before proceeding.
Triple constraint
The interdependence of scope, time and cost in a project: changing one constraint affects the others, and quality results from balancing all three.
Scope statement
A document defining project deliverables, boundaries, assumptions and acceptance criteria, forming the baseline against which scope changes are assessed and controlled.
Scope creep
Uncontrolled expansion of project scope through unapproved additions, which increases time and cost without corresponding adjustments to resources or schedule.
Change control
A formal process of requesting, assessing impact of, approving or rejecting, and recording changes to a project baseline before they are implemented.
Work breakdown structure
A hierarchical decomposition of project deliverables into manageable work packages, used to estimate effort and cost and to assign responsibility.
Gantt chart
A scheduling chart plotting tasks as bars against a calendar, showing duration, start and finish dates, overlap and progress at a glance.
Critical path
The longest sequence of dependent activities through a project network, determining the shortest possible project duration; its activities have zero float.
Float
The amount of time an activity can be delayed without delaying project completion, calculated as late start minus early start or late finish minus early finish.
Bottom-up estimation
Estimating project effort and cost by summing detailed estimates for each work package in the work breakdown structure, giving accuracy at higher preparation cost.
Three-point estimation
An estimating technique averaging optimistic, most likely and pessimistic durations, commonly as (optimistic + 4 x most likely + pessimistic) divided by six.
Risk exposure
A measure of risk severity calculated by multiplying the probability of the risk occurring by the impact if it does occur, used to rank risks.
Verification and validation
Verification confirms the product is built correctly according to specification; validation confirms the correct product is built and meets the client's actual needs.
Project closure
The final phase in which deliverables are handed over and accepted, documentation archived, resources released, and outcomes reviewed against the original objectives.