Plumbing and Drainage Licensing Requirements

  • Queensland plumbing and drainage work must be carried out under a licence issued by the QBCC; the work categories are plumbing, drainage, gas fitting, roofing (stormwater), and fire protection (water).

  • A plumbing licence authorises sanitary plumbing, water supply, and sanitary drainage work within the scope endorsed on the licence; work outside the endorsed scope requires a separate licence or endorsement.

  • Nominee requirements: a licensed individual or company must have a nominated supervisor holding the relevant licence class and the required experience for that class.

  • Individual licence classes progress from provisional/qualifying to journeyperson-level and then contractor-level; the contractor licence is required to contract with the public for plumbing work.

  • A person must not hold out or advertise as a licensed plumber unless they hold the licence, and a licensee must not allow another person to carry out work under their licence.

  • Licences are term-based and must be renewed before expiry; practising while suspended or cancelled is an offence under the Plumbing and Drainage Act 2018 (Qld).

  • Mutual recognition and automatic licensing allow holders of equivalent interstate or New Zealand qualifications to apply, but Queensland-specific requirements (e.g., local regulations) still apply.

  • Unlicensed plumbing work may attract enforcement action including fines, rectification orders, and disciplinary proceedings; the QBCC maintains a public register of licensees.

Quick reference

Regulated and Notifiable Plumbing Work

  • Regulated work is plumbing or drainage work that must be carried out by a licensed person and is subject to compliance assessment; notifiable work must be reported to the regulator after completion.

  • Typical regulated work includes sanitary drainage, sanitary plumbing, water supply, and installation of fixtures connected to a water service or drainage system.

  • Notifiable work includes certain minor or like-for-like replacements (e.g., replacing a tap or toilet suite) that must be notified to the QBCC within the prescribed period.

  • Excluded work (not regulated and not notifiable) includes work the homeowner may lawfully do on their own single detached dwelling, and certain irrigation or garden work not connected to a regulated system.

  • A Form 4 (compliance certificate for notifiable work) or equivalent must be given to the owner and the regulator for notifiable plumbing work; regulated work requires inspection and a compliance certificate.

  • Notifiable work must be notified within the prescribed timeframe (generally within 10 business days of completion) using the approved form and payment of the notification fee.

  • Work on a shared or common property system, or work affecting more than one lot, is regulated and requires local government or body corporate involvement as applicable.

  • Thermostatic mixing valves, backflow prevention devices, and solar hot water installations are regulated and carry specific compliance and notification obligations.

Quick reference

On-Site Responsibilities, Supervision and Quality Control

  • The licensed person in control of the site is responsible for ensuring work complies with the Plumbing and Drainage Act, the Plumbing Code of Australia (PCA), and AS/NZS 3500.

  • Supervision means the nominated supervisor or licensee is accountable for the work of apprentices and unlicensed assistants, including verifying work before it is covered or commissioned.

  • Testing obligations: drainage must be tested for watertightness (e.g., hydrostatic or air test) before backfilling; water supply must be pressure-tested and flushed before commissioning.

  • Backflow prevention: hazard ratings determine the required device; testable devices must be tested on installation and at the prescribed intervals by a licensed tester.

  • Records: keep job records, test results, and compliance certificates for the period required by the regulator; certificates must be issued to the owner on completion.

  • Work health and safety duties require identifying hazards (e.g., confined spaces, trench collapse, gas), implementing controls, and maintaining safe work method statements for high-risk work.

  • Rectification of defective work must be carried out by a licensed person; defects identified through audit or complaint can lead to a direction to rectify and disciplinary action.

Quick reference

Business, Contract and Compliance Obligations

  • A contractor licence is required to enter into contracts for plumbing work with consumers; contracting without a licence is an offence and may void or limit enforceability of the contract.

  • Queensland home building contracts for plumbing work above the prescribed threshold must be in writing, include required disclosures, and provide the statutory cooling-off period.

  • Statutory warranty/insurance: residential plumbing work may require home warranty insurance for work above the threshold; the contractor must provide a certificate of insurance before starting work.

  • Progress payments and deposits are regulated; a deposit exceeding the prescribed maximum (generally 10% for domestic building work) is not permitted without specific arrangements.

  • The contractor must provide a written contract, comply with the Domestic Building Contracts Act 2000 (Qld) requirements, and keep records of variations signed by the owner.

  • Tax and business obligations: hold an ABN, be registered for GST if turnover exceeds the threshold, maintain public liability insurance, and comply with superannuation and PAYG obligations for employees.

  • Consumer guarantees under the Australian Consumer Law apply to plumbing services: work must be done with due care and skill, be fit for purpose, and be completed within a reasonable time.

  • Record-keeping and reporting: retain contracts, certificates, and financial records for at least five years; respond to QBCC requests and comply with audit and disciplinary processes.