Welder Performance Qualification (WPQ1)

  • A welder performance qualification (WPQ) tests a welder's ability to produce sound welds; it is distinct from procedure qualification (PQR), which tests the welding procedure.

  • Essential variables for welder qualification typically include welding process, base metal group (P-number), filler metal classification, welding position, and joint type or backing condition.

  • A welder qualified in a given position (e.g., 6G) is generally qualified for all positions; a welder qualified in a lower position (e.g., 1G) is not qualified for higher positions.

  • Qualification test coupons must be visually inspected and, where required, subjected to destructive tests such as bend or nick-break, or to volumetric NDE, before acceptance.

  • A welder who fails a qualification test may typically retest after a defined period or after additional training; repeated failure may require requalification from the start.

  • Continuity of qualification: a welder who does not use a qualified process for a specified period (often 3 to 6 months) may lose qualification unless requalified.

  • Welder identification marks (stamps) must be traceable to the qualified welder and recorded on the qualification record (WQR).

  • Qualification records must include welder name, test date, process, position, base metal, filler metal, test results, and the qualified range.

Quick reference

Welding Procedure Qualification (WPQ2)

  • A welding procedure specification (WPS) must be supported by a procedure qualification record (PQR) that documents the essential variables and test results.

  • Essential variables for procedure qualification include base metal specification and thickness range, filler metal classification, preheat and interpass temperature, and post-weld heat treatment.

  • A change in an essential variable requires requalification; a change in a nonessential variable may be made by revising the WPS without requalification.

  • PQR test specimens typically include tensile, bend, and impact tests as required by the governing code; acceptance criteria are code-specific.

  • The qualified thickness range for a procedure is often a multiple of the test coupon thickness (e.g., 1.5T to 2T) and is defined by the code.

  • Procedure qualification must be performed by a qualified welder or welding operator using the proposed procedure.

  • The WPS must be available to the welder at the work site and must be followed exactly; deviations require a revised WPS and possibly requalification.

  • PQRs must be certified by the manufacturer or contractor and retained as quality records.

Quick reference

Welding Coordination and QA (WCQA)

  • Welding coordination includes planning, execution, and documentation of welding activities to ensure compliance with specifications and codes.

  • The welding coordinator (e.g., welding engineer or technologist) must verify that WPSs and welder qualifications are appropriate for the work.

  • Quality assurance (QA) includes inspection and testing plans, document control, and traceability of materials and welds.

  • Preheat and interpass temperatures must be monitored and recorded per the WPS; thermocouples or temperature-indicating crayons are common methods.

  • Consumables must be stored, handled, and baked per manufacturer recommendations; exposure limits for low-hydrogen electrodes must be enforced.

  • Nonconformities must be documented, dispositioned, and corrective actions implemented to prevent recurrence.

  • Welding records (WPS, PQR, WQR, inspection reports) must be retained for the period specified by the contract or code.

  • Audits and surveillance verify that welding activities conform to the quality plan and applicable standards.

Quick reference

Nondestructive Examination Coordination (NDEC)

  • NDE methods include visual (VT), liquid penetrant (PT), magnetic particle (MT), ultrasonic (UT), and radiographic (RT) testing; selection depends on material and defect type.

  • NDE personnel must be qualified and certified to a recognized standard (e.g., ASNT SNT-TC-1A or ISO 9712) at the appropriate level (I, II, or III).

  • NDE should be performed after final weld completion and, for delayed cracking-prone materials, after a specified delay (e.g., 24 to 48 hours).

  • Surface preparation and accessibility must meet the NDE method requirements; RT requires safety controls for radiation.

  • Acceptance criteria for indications are defined by the applicable code or specification; NDE results must be recorded and traceable to the weld.

  • Coordination includes scheduling NDE, ensuring qualified procedures, and verifying equipment calibration.